Mark Murray MD, MPA Mark Murray & Associates 2209 Capitol Ave Sacramento, CA 95816 916-441-3070 Fax 916-446-8009 Big System Flow.

Slides:



Advertisements
Similar presentations
Advanced Access: How To Make it Work; Part A
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Queue, Demand, Capacity, Variation and Flow
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Modernisation Skills - the basics. To be covered: Modernisation methodology Why measure capacity and demand How to measure capacity and demand Summary.
Flow Rate and Capacity Analysis
Chapter 5 Strategic Capacity Planning
Improving Healthcare Quality: Advanced Clinic Access in Mental Health Mary Schohn, Ph.D. April 24, 2004.
Improving Office Practice: Process Flows Mark Murray, MD, MPA Mark Murray and Associates.
Strategic Decisions (Part II)
Scheduling.
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Acknowledgements RHH ED staff Safety and Quality Unit RHH for their participation and valuable contribution Next Steps It is envisaged over the next 12.
Advanced Measures Mike Davies, MD FACP Mark Murray and Associates.
Surgical Scheduling: Issues and Solutions BAHC Lecture 4 October 31, 2012.
Operations Management
Mark Murray & Associates ACCESS IMPROVEMENT How to see Differently Mark Murray, MD, MPA.
Reducing Delays at the Appointment Mark Murray, MD, MPA Mark Murray & Associates 2209 Capitol Avenue Sacramento, CA (fax)
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Course Objectives Define Capacity
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Primary Care Access Deanna Willis, MD, MBA Medical Director of Quality and Medical Management IU Medical Group-Primary Care.
Principles for Flow Improvement #1: Understand, measure and achieve a balance between upstream and downstream demand.
MBA 8452 Systems and Operations Management MBA 8452 Systems and Operations Management Product Design & Process Selection —Service.
Barb Boushon, Mike Davies, MD Mark Murray and Associates The Process Improvement Model: Aims, Measures, Tests/Changes and.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 Providing Timely Access to Healthcare or Must Patients be Patient? Based on presentation by Professor Linda Green Columbia Business School April 20 th,
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Optimizing Care Mark Murray MD, MPA. Gap Between Performance and Possibility For clinical care For clinical care For efficiency in care For efficiency.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Advanced Access, Efficiency and Chronic Disease Management in Primary Healthcare Date: Name of Presenter: WAVE 6.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Dr Dan Beckett Consultant Acute Physician NHS Forth Valley.
18 Management of Waiting Lines.
Understanding Capacity Demand and Flow Essential measures and processes for understanding healthcare.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Measurement Mike Davies, MD FACP Mark Murray and Associates.
Operations Management Operations Scheduling
Process Characteristics
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Understanding Variation and Setting Capacity. Why do we get backlog and queues? Because demand exceeds activity Because we want to be efficient Because.
7/2014. Jessica Berlin RN Emergency Department Director Berlin Medical Center 4201 Medical Drive Ponte Vedra, FL
/0412 © Business & Legal Reports, Inc. BLR’s Training Presentations Planning & Organizational Skills.
Chapter 6 Managing Capacity
Capacity Planning Pertemuan 04
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Scheduling.
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Improving access to CAMHS Applying LEAN within CAMHS Beverley Mack Bexley CAMHS.
Centre for Applied Resilience in Healthcare Organisational resilience and patient safety Dr. Janet Anderson Centre for Applied Resilience in Healthcare.
Strategic Capacity Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chap 11 Learning Objectives
Operations Management
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

Mark Murray MD, MPA Mark Murray & Associates 2209 Capitol Ave Sacramento, CA Fax Big System Flow

The problem ED overcrowding Hospital overcrowding Diversions—external and internal LWBS Cancellations, particularly of elective surgical cases Variable utilization Cost and revenue implications with the variation

Introverted/introspection Flow system dynamics and gravity Customer flow- value stream Horizontal/vertical Effective, efficient and satisfying Demand, supply, activity, gap & variation System Optimize

Basic Dynamic

Demand/Supply Dynamic

Variation

Terms Demand: workload generated within a specified time frame Activity: work done within a specified time frame Supply: “worker” (person or machine) set aside to do the work within the specified time frame Backlog: work in progress, work waiting to be completed, wait list, queue, inventory, warehouse Constraint/bottleneck: rate-limiting step

Why focus on delay? Delay results from a mismatch either temporary or permanent of demand and supply Delays lead to dissatisfaction Delays sub-optimize revenue Delays adversely effect clinical outcomes Delays cost money Delays represent system inefficiency We can only go as fast as the slowest step Perception that delay=lack of resource

Why do queues form? Demand > Supply Variation Paradigm Buffer for revenue, for predictability and for assurance of 100% utilization (false productivity)

Demand > capacity Time waiting numbers If Demand > Activity or Capacity

Levels or types of variation Volume Arrivals Process time

Variation Within Day Between Day

Demand & capacity for breast clinic Week Number 3 January nd January 2001 Total number of patients referred Number of clinic slots available

Sources of demand variation Variation in volume (between day variation) Random arrivals (within day variation) Randomness of clinical condition/acuity/time- handling time Randomness of internally generated demand (electives)

Sources of supply variation Relative lack of any of the converging supply components Pattern of supply components Carve outs or priorities that restrict flexibility

Moment of truth Even if the average demand = average supply The variation of demand + the variation of supply Will result in a queue Waiting times or delays inevitably result from system variation

Walter A. Shewart -early 1920’s, Bell Laboratories While every process displays variation… some processes display controlled variation stable,consistent pattern of variation constant causes/ “chance” Common cause variation while others display uncontrolled variation pattern changes over time special cause variation/“assignable”

2 ways to improve a process If uncontrolled variation: identify special causes (may be good or bad) process is unstable variation is extrinsic to process cause should be identified and “treated” If controlled variation: reduce variation, improve outcome process is stable variation is inherent to process therefore, process must be changed: reduce steps, increase reliability of each step

Natural Variation: A Stable Process Upper process limit Mean Lower process limit

Special Cause Variation

Variation and Predictability Which demand stream is more variable- planned or unplanned? Which demand stream is more predictable planned or unplanned?

Know and manage variation Natural/unplanned Results from the natural rate at which illness brings patients into the hospital Influenced by level of health, prevention, early detection Artificial/planned This pattern results from behavior of people, processes or systems This variation is theoretically controllable

Vicious cycle Variation in demand or in supply create a delay The wait time creates a need to prioritize Prioritization leads to inflexibility and more variation More waits Assumption that demand is greater than supply Addition of more supply Adds more variation

Variation Variation is ubiquitous Variation is not measured More variation in planned than unplanned Demand = Volume x LOS So variation has a long-term effect over days, not a single effect as a single incident

What does the patient see?

Linear Flow DDSDSDSDSDS Step 1Step 2Step 3Step 4Step 5 Delay

What do we see?

Vertical Flow Filter C A

Appointment Template Filter New Return Consult Procedure Post-surgery Return-long Return-short New-long New-short Consult-long Consult-short

Office Manager Filter OfficeORCallAdminOff

What we see Today’s schedules of supply to match the various demand streams Response to the demand streams Waits for single isolated patients, not the sum of waits for that patient Waits after us, not in front of us

What we don’t see The demand streams The wait in each of the demand streams The wait at each step The patients horizontal journey The three dimensional view

Days Delay External Demand Delay PCSC Test/ Surgery Procedure Hospital Follow up A B C D A Supply lines that match demand stream Vertical/Horizontal Days

Cancer Center flow-map Test SC Surgery Discharge External Demand PC Bed MDT Oncology Radiation Chemo Follow up Test Follow up Internal Demand Test MDT

Medical Flow Test SC Hospital ED Post hospital venue Procedure PC ICU Return Test

Surgery Flow Test SC Surgery ED Bed Internal Demand External Demand ICU PC Follow up Discharge

What do we learn? The system is complex with at least 3 dimensions The patients move horizontally, we think vertically Supply allocation decisions, made on instinct, have huge system effects There is a great deal of variation in both demand and in supply at each step Variation is amplified as we move Queues are a result of a permanent or temporary mismatch of demand and supply

What else do we learn? Patients move from one warehouse to another There is always a constraint We are blind at the intersections Carve out or priority makes the queues worse, not better Increasing supply does not always work, the delays remain but just get moved

Process for Improvement Team Aim Map Change Measure - Principles -Strategies Measure again

Our Task in Flow Improvement Flow map the customer flow process: input, throughput, output Use a process for improvement: team, aim, change and measure Use a set of change principles at & between each step Measure: delay for and at each step, DSA,variation Achieve a balance of demand and supply at every step with change strategies (change strategy: balance) Reduce the variation in both demand and supply at every step ( change strategy: contingency plans ) Identify common and special causes of variation Be flexible on the supply side Address the system constraint first Create the correct linkages

Apply High Leverage Changes within and between each step Balance upstream and downstream demand and supply for all services Eliminate any backlogs of work Reduce the queues from one entity to another Develop contingency plans to address all variation Reduce demand Identify and manage each supply constraint Synchronize the work Predict and anticipate needs Optimize the environment: equipment, staff and space

Change ideas Each step (node) needs to be optimized The interface between steps needs to be optimized Focus on the “system” flow constraint either between or within the steps Constraints will shift