RISK MANAGEMENT PROGRAM AND PROJECT MANAGEMENT APPLICATION OCTOBER 6, 2006 Presented by Don Devieane, CGA, Manager Risk Management Program.

Slides:



Advertisements
Similar presentations
ACT Canada TDM Summit Halifax| October, 2008 Telework Pilot : The City of Calgary.
Advertisements

Chapter 7 Managing Risk.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Raising Entrepreneurial Capital
Museum Presentation Intermuseum Conservation Association.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
A BPM Framework for KPI-Driven Performance Management
Business Continuity Planning DavisLogicDavisLogic & All Hands ConsultingAll Hands Consulting.
Risk The chance of something happening that will have an impact on objectives. A risk is often specified in terms of an event or circumstance and the consequences.
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Managing Risk: A Framework and Reporting Cycle 2014.
Appendix H: Risk training slides (sample). What is Risk? “ Risk is the effect of uncertainty on objectives ” AS/NZS ISO31000:2009.
PROJECT RISK MANAGEMENT
Project Management.
Office of Operations 2009 Fall Conference Navigating Uncertain Times October 21-22, 2009 Risk Assessment and Internal Controls Internal Controls Anna Tomassacci.
Tax Risk Management Keeping Up with the Ever-Changing World of Corporate Tax March 27, 2007 Tax Services Bryan Slone March 27, 2007.
Chapter 7: Managing Risk
UNIVERSITY OF PENNSYLVANIA 1 ASSESSING AND MITIGATING BUSINESS RISK USING INTEGRATED INTERNAL CONTROL FRAMEWORK.
ENVIRONMENTAL MANAGEMENT PLAN
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
CORPORATE RISK MANAGEMENT & INSURANCE BY R P BLAH D.G.M. INCHARGE THE ORIENTAL INSURANCE COMPANY LIMITED REGIONAL OFFICE BHUBANESWAR.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Introduction to Hospitality, 6e
Managing Uncertainty, Creating Opportunity Enterprise Risk Management J. Brown, CEO.
Governance of the Treasury Function CIPFA Scottish Treasury Management Forum Alan George, Regional Director 23rd February 2012.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Managing Risk for Opportunity. In the absence of certainty, the only way to maintain potentiality is to focus on excellent execution and demonstrable.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
IRS Enterprise Risk Management (ERM)
Tingxuan Liu Risk Management in Software engineering.
Software Project Management
© Mahindra Satyam 2009 Decision Analysis and Resolution QMS Training.
Proposed Supply Chain Risk Management Process Flow Supply Chain Risk Leadership Council 20 April 2009 DRAFT.
Risk & Opportunity Management Putting theory into Practice Susy Austin MQM Business Consultant.
1 Introducing Enterprise Risk Management (ERM) - The KOC Experience November 2012 Khaled Al-Awadhi Risk Management Team Kuwait Oil Company.
RISK MANAGEMENT : JOURNEY OR DESTINATION ?. What is Risk? “ Any uncertain event that could significantly enhance or impede a Company’s ability to achieve.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Information Technology Planning. Overview What is IT Planning Organized planning of IT infrastructure and applications portfolios done at various levels.
Project Risk Management Planning Stage
ABGR XI International Risk management and Insurance Seminar “Introduction to Risk Management” ALARYS Latin American Risk Management Foundation (FUNDALARYS)
Project & Risk Management
karRKb;RKghaniP½yrbs;KMerag Project Risks Management
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Project Risk Management. Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences”
Purchasing Forum – May The integration of the activities, plans, attitudes, policies, and efforts of the people of an organization working together.
Governance for SMEs Nigeria
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Managing Uncertainty, Creating Opportunity Enterprise Risk Management J. Brown, CEO.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
RISK & ITS MANAGEMENT. Risk A crisis situation involves : - a threat to resource & people, - a loss of control, - visible and / or invisible effects on.
Business Continuity Planning 101
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Information Technology Planning
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
HUMAN RESOURCE GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE
Quality Risk Management
Enterprise Risk Management (ERM) at Clayton State University
Effective Risk Management in Decision Making Process
Presentation transcript:

RISK MANAGEMENT PROGRAM AND PROJECT MANAGEMENT APPLICATION OCTOBER 6, 2006 Presented by Don Devieane, CGA, Manager Risk Management Program

OVERVIEW (RISK MANAGEMENT PROGRAM)

n Program History n Framework Components n Risk Categories n Risk Assessment n Measurement Criteria n Corporate Risk Map

OVERVIEW (PROJECT MANAGEMENT APPLICATION) n Project Justification n Project Risk Identification n Risk Assessment (Measurement) n Risk Treatment n Residual Risk n Reporting and Monitoring

COMPANY PROFILE (MANITOBA HYDRO) n Provincial Crown Corporation n 510,000 electric 258,000 gas customers n 98% of electricity hydroelectric n 14 hydroelectric G.S. n Provide 100 communities with N.G. n 8,700 kilometers of pipeline n Capital assets exceed $11 billion n Approximately $2.4 billion in revenue n Approximately 6,000 employees

COMPANY PROFILE (MANITOBA HYDRO) Major Events Grand Rapids G.S. Bi Pole DroughtStonewall

COMPANY PROFILE (MANITOBA HYDRO)

RISK MANAGEMENT PROGRAM (PROGRAM HISTORY) n Started in CRMSC established in First CRM report in Policy and guidelines issued Internal web site 2006 n Reasons - Business Failures - Market Changes - Pressure from outside (best practice)

RISK MANAGEMENT PROGRAM (PROGRAM HISTORY) n Purpose - Identify risks - Mitigate negative occurrences - Take advantage of opportunities n Benefits - Simple - Systematic - Proactive - Proactive - Integrated

RISK MANAGEMENT PROGRAM (FRAMEWORK COMPONENTS) n Mission / Mandate / Project n Risk Identification n Potential Impact n Risk Treatment n Residual Risk n Reporting and Monitoring

RISK MANAGEMENT PROGRAM (FRAMEWORK COMPONENTS) CROSS FUNCTIONAL FORUM GUIDE AND MONITOR LINK TO AREAS OF RESP. PARTICIPATION / LEADERSHIP RESIDUAL RISK ASSESSMENT RISK TOLERANCE DETERMINE LIKELIHOOD CHAMPION RISK PHILOSOPHY RISK COMMITTEE APPROVALS MISSION / MANDATEEXECUTIVE CORPORATE RISK MANAGEMENT STEERING COMMITTEE RISK MANAGEMENT PROCESS (LINE MANAGEMENT) RISK TREATMENT MONITORANDREPORTMONITORANDREPORT RISK IDENTIFICATION (THREATS TO ACHIEVE) POTENTIAL IMPACT (PRE RISK TREATMENT) DETERMINE CONSEQUENCE ADDITIONAL ACTION REQUIRED RESOURCE FACILITATE TRAIN COORDINATE CRM DEPARTMENT

RISK MANAGEMENT PROGRAM (RISK CATEGORIES)  Market n Financial n Environmental n Infrastructure n Human n Business / Operational Operational  Reputation  Governance / Regulatory / Legal Regulatory / Legal  Aboriginal  Alternative Technology  Strategic MAIN CATEGORIES

RISK MANAGEMENT PROGRAM (RISK CATEGORIES) n Exchange n Interest Rates n Credit n Inflation n Gas Price Volatility n Gas Derivative Instruments SUB CATEGORIES (FINANCIAL) n Capital Structure n Shortage Pricing / Fuel Price n Power Hedging Instruments

RISK MANAGEMENT PROGRAM (RISK ASSESSMENT) n “You don’t want the decimal point you want the order of magnitude” n Each risk impact is assessed in terms of: ConsequenceLikelihood n Consistent across the entire corporation n Worst case scenario

RISK MANAGEMENT PROGRAM (RISK ASSESSMENT) n Consequence rated: - As high, medium or low - Either financial, safety, reliability, environment or customer value environment or customer value - Financial Low$0 - $50 million Medium$50 - $150 million High> $150 million

RISK MANAGEMENT PROGRAM (RISK ASSESSMENT) n Likelihood rated: - As high, medium or low - Low, not likely to occur within 10 years Medium,likely to occur within years Medium,likely to occur within years High, likely to occur within years High, likely to occur within years

RISK MANAGEMENT PROGRAM (CORPORATE RISK MAP) Water Supply Drought Uneconomic Loads Power Hedging Instruments

PROJECT APPLICATION

PROJECT APPLICATION (PROJECT JUSTIFICATION) n Support for the project has already been justified - Reliability - Safety - Opportunity n The best solution has been identified through business case analysis n Environmental concerns are resolved n Prioritize initiatives and opportunities

PROJECT APPLICATION (PROJECT JUSTIFICATION) n Well documented cost estimate - Costs should be representative of most likely scenario likely scenario - Costs must not contain hidden contingencies and allowances contingencies and allowances

PROJECT APPLICATION (PROJECT JUSTIFICATION)

PROJECT APPLICATION (RISK IDENTIFICATION) n Risk can be defined as what can cause variability in possible outcomes. n Cost / delay / deliverable (performance) n Brainstorming n History n Corporate risk categories/subcategories

PROJECT APPLICATION (RISK IDENTIFICATION) n Listing of possible risks n Proper and detailed analysis can stream line the effort required n Properly developed forms and support information will ensure consistency

PROJECT APPLICATION (RISK IDENTIFICATION) n Risk identification - Business Operational (Supply Chain) - Legal (Licensing, Property) - Environmental (Weather, Land) - Human (Availability, Skilled) - Financial (Exchange, Inflation,)

PROJECT APPLICATION (RISK ASSESSMENT) n Business operational (supply chain) - Having the right material available when its required - Having the right material available when its required (Level of engineering design, - proven / unproven (Level of engineering design, - proven / unproven technology) technology) - What are the costs associated with: - What are the costs associated with: - 1 month - 2 month - 6 month - What is the likelihood of this occurring (probability)

A.1.1 Low MediumHigh LIKELIHOOD CONSEQUENCE Low Medium High A.1 PROJECT APPLICATION (RISK ASSESSMENT) 6 Month 2 Month 1 Month Supply Chain Note : Can be done for each material item

A.1.1 A.3A.2 Low MediumHigh LIKELIHOOD CONSEQUENCE Low Medium High C.3 D.3 E.1 F.2 D.2 E.2 C.1 A.1B.1B.3 A.3 F.1 B.2 PROJECT APPLICATION (RISK ASSESSMENT)

PROJECT APPLICATION (RISK TREATMENT) n RISK MITIGATION - Elimination of risk by exclusion, sharing, insuring or by the use of appropriate legal documentation and by the use of appropriate legal documentation and financial documents. Risk allowance and financial documents. Risk allowance and acceptance. acceptance. - Identify what can be done to manage and mitigate - Identify what can be done to manage and mitigate the potential for cost overruns or delays. the potential for cost overruns or delays. - Adjust risk impact assessment for reduction due to - Adjust risk impact assessment for reduction due to risk treatment efforts (revise risk map) risk treatment efforts (revise risk map)

PROJECT APPLICATION (RISK TREATMENT) n Business operational (Supply Chain) - Scheduling - Supplier ( Foreign / Local ) - Transportation - Penalties (Legal Clauses / Performance Bond) Bond) - Surplus

A.1.1 A.3A.2 Low MediumHigh LIKELIHOOD CONSEQUENCE Low Medium High C.3 D.3 E.1 F.2 D.2 E.2 C.1 A.1 B.1B.3 A.3 F.1 B.2 PROJECT APPLICATION (RISK TREATMENT)

A.1.1 A.2 Low MediumHigh LIKELIHOOD CONSEQUENCE Low Medium High C.3 D.3 E.1 F.2 D.2 E.2 C.1 A.3B.1B.3 A.1F.1 B.2 PROJECT APPLICATION (RESIDUAL RISK) A.3

A.1.1 A.3A.2 Low MediumHigh LIKELIHOOD CONSEQUENCE Low Medium High C.3 D.3 E.1 F.2 D.2 E.2 C.1 A.3B.1B.3 A.1F.1 B.2 PROJECT APPLICATION (RESIDUAL RISK) C.3E.2 C.1 F.2 E.1 A.3B.1B.3 A.1 F.1B.2 C.3E.2 C.1 F.2 E.1 A.3B.1B.3 A.1F.1B.2

PROJECT APPLICATION (REPORTING AND MONITORING) n RISK CONTROL Takes place during project execution and consists of a rigorous control of scope, quality, cost and schedule and being constantly alert of potential concerns.

PROJECT APPLICATION (REPORTING AND MONITORING) n Establishment of tolerances n Defined as the allowable or permissible variation from a standard n Actions are taken when the risk exceeds its allowable tolerance n Low, zero or limited variability n Medium, some variability is accepted n High, significant variability is accepted

PROJECT APPLICATION (REPORTING AND MONITORING) n Monitor Points n Trigger Points n On Site Inspection n Dispute Resolution Mechanism n Who Needs to Know and When (Predetermined)

PROJECT APPLICATION (REPORTING AND MONITORING)

QUESTI0NS