Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
UNITED NATIONS Shipment Details Report – January 2006.
Measurements and Their Uncertainty 3.1
David Burdett May 11, 2004 Package Binding for WS CDL.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Measurements and Their Uncertainty 3.1
Board of Early Education and Care Retreat June 30,
Identifying money correctly 1
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
1 A B C
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Structural Analysis and Design of a Composite Steel/RC Multi-Storey Building United Arab Emirates University College of Engineering Department of Civil.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
Teaching Modules for Steel Instruction
Concrete Construction Part 3
PP Test Review Sections 6-1 to 6-6
Business and Economics 6th Edition
Lean concrete subbases
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
15. Oktober Oktober Oktober 2012.
Solving Equations How to Solve Them
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MOTION. 01. When an object’s distance from another object is changing, it is in ___.
Chapter Six Study Guide.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
F-7 and F-7A Understanding the problems with NARFED Forms and Reports CAB 1/23/2012.
25 seconds left…...
Subtraction: Adding UP
Chapter 10 Section 1, 3-4. Warm-Up List the data in order from least to greatest. 1.) 23, 45, 61, 87, 91, 16, 22, 52 2.) 4.1, 4.2, 4.13, 4.15, )
: 3 00.
5 minutes.
Weisburd, Lawton, Ready, Rudes, Cave, and Nelson Presented by Breanne Cave 1.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Topic : MIX DESIGN OF CONCRETE Properties of concrete Submitted To: DR. AYUB ELAHI Submitted By: SOHAIB NASEER 2K9-scet-29/CIVIL M.ZAEEM FAKHAR 2K9-scet-03/CIVIL.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
Australian Society for Concrete Pavements The Role & Influence of Aggregates in Lean Mix Concrete Subbase (LMCS)
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
What is CONCRETE SLUMP TEST –
Presentation transcript:

RMS R83 Edition 3 Rev 0 ASCP Forum 24 Feb 2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED 24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  R83 History Ed3 Rev 0 – – New Edition Ed2 Rev 8 – Ed2 Rev 7 – Ed2 Rev 6 – – Basis for Comparison Ed2 Rev 5 – Ed2 Rev 4 – Ed2 Rev 3 – Ed2 Rev Ed2 Rev 1 – Ed2 Rev 0 – – Completely Revised R52 – Pre /02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Categories General Materials Design Process Control End Product Steel Fibre Concrete (SFRC) Minimum Frequency Testing 24/02/2014 TSM CIVIL

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  1. General – 7p  2 Materials – 10p  3. Design – 9p  4. Process Control – 61p  5. End Product Criteria -20p  6. SFRC – 4p  7. Testing Procedures 2p  Annexures – 14p  Total 122p  1. General – 2p  2 Materials – 3p  3. Design – 4p  4. Process Control – 19p  5. End Product Criteria 9p  6. Measurement & Pay 3p  Annexures – 50p  Total 94 p 24/02/2014 TSM CIVIL  Ed 3 Rev 0  Ed 2 Rev 6  General- Table of Contents

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  A. Details of Work  B. Measurement & Pay  C. Schedule HP & WP  D. Quality Systems  E- K Not Used  L. Min. Frequency of Testing  M. Reference Docs.  Annex 14p  1. Details of Work  2. Quality System  3. Technical Procedures  4. Min. Frequency of Testing  5. Definitions  6. Schedule HP & WP  7. Identified Records  8 Steel Fibre Concrete  Annex 50 p 24/02/2014 TSM CIVIL  Ed 3 Rev 0  Ed 2 Rev 6  General- TOC- Annexures

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  General  RTA changed to RMS  CRCP now included with R83  SFRC requirements moved into main document  Technical Procedures relocated into main document  Definitions & Abbreviations relocated into main document  Term Sublot now adopted 24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  General 24/02/2014 TSM CIVIL  Definitions  Old Spec 46 off - New Spec 80 off Examples: Changes

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  General 24/02/2014 TSM CIVIL  Definitions Examples: Changes

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  General 24/02/2014 TSM CIVIL  Definitions Examples: New Items

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.2 – Combined Aggregates Guidance Only Refer Clause 2.3 Missing ??

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.3 – Fine Aggregates 6

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.3 – Fine Aggregates Only if > 20% Man Sand Definition Correct ??

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.3 – Fine Aggregates

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.4 – Coarse Aggregate

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.4 – Coarse Aggregate N/A if material Drill & Blasted Only for recycled Agg Test single size from each source

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.5 – Aggregate Tests

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.5 – Aggregate Tests Source? If mix has natural sand is limit 0.10% or 0.15%??

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.7 – Admixtures

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.8 – Curing Compounds

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.8 – Curing Compounds

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.9 – Joint Sealant

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Materials 24/02/2014 TSM CIVIL  Clause 2.11 – Water

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.2 – Survey

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.2 – Survey

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.4 – Cementitious Content

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.4 – Cementitious Content What cementitious content do we get ?? Under Review- Refer Justin Moss presentation

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.5 – Strength

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.5 – Strength

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.6 – Consistence

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.6 – Consistence

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.7 – Other Attributes

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.7 – Other Attributes A least 1 slipform & 1 hand pour mix

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Design 24/02/2014 TSM CIVIL  Clause 3.8 – Nominated Concrete Mixes

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Tiebars

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Tiebars (ii) If 5 Bars per slab then spacing approx. 825 thus tolerance of 20% is +/- 165mm.; But if 9 bars per slab, then spacing approx. 410mm thus 20% tolerance is only 82mm. Achievable ??

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Location Tiebars

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Location Tiebars (ii) Two test lengths = 4 slabs per sublot (25lm = 6 slabs)

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Compaction Testing Tiebars

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Compaction Testing Tiebars

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Concrete Cover below Sawn Joints This clause appears to be duplicate requirement as already tested under

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Dowels

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Splice Lengths

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Production Mixes

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Production Mixes

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Flex Beam

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Flex Beams

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Flex Beams

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Flex Beams

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Control Charts

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Control Charts Is this Upper limit 7% or 4%, ie: is this TF of total combined aggregates?

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Mixing, Transport, Consistence & Air AS 1379 Section 3- Plant & Equipment Section 4 – Production & Delivery (incld BatchTolerances) Appendix A – Uniformity of Mixing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Mixing, Transport, Consistence & Air

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Mixing, Transport, Consistence & Air Eg Sample Set. 24 Cylinders, Say; 34 Mpa 36 Mpa 30 Mpa 31 Mpa CV= 4.7 FAIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Consistence (Slump)

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Consistence (Slump)

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Forming Time

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.3 – Paving Concrete

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Temperature

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Temperature

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Texturing of Surface

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Texturing of Surface

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Texturing of Surface Option Transverse or Longitudinal

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Curing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Curing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Curing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Application Rate

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause – Application Rate

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause Application Rate

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.4 Paving Trial

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.4 Paving Trial

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.4 Paving Trial

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.5.1Joint Cleaning & Sealants

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.5.1Joint Cleaning & Sealants

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause Joint Cleaning & Sealants

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  Process Control 24/02/2014 TSM CIVIL  Clause 4.9 Traffic Islands & Medians

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Conformity for Compaction

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Conformity for Compaction

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Conformity for Compaction T381 Does not appear to exist ??

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Moulding & Testing Cylinders

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Core Specimens

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Frequency & Location Cores

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Frequency & Location Cores

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Frequency & Location Cores

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Frequency & Location Cores Grid Line spacing no longer equal

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Within-core Variability No Tie Bars cores tested.

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Within-core Variability

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Within-core Variability

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Core Strength Testing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Correction Factors for Age and Shape

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Level Survey

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Thickness Assessment

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Thickness Assessment U = Unlimited.

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Longitudinal Profile T369 ARRB Walking Profiler

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  End Product 24/02/2014 TSM CIVIL  Clause Longitudinal Profile How does (C) work with (A)?

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  SFRC 24/02/2014 TSM CIVIL  Clause Fibre Dose Rate

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  SFRC 24/02/2014 TSM CIVIL  Clause Fibre Dose Rate

24/02/2014 TSM CIVIL

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  ANNEXURE L 24/02/2014 TSM CIVIL  Minimum Frequency of Testing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  ANNEXURE L 24/02/2014 TSM CIVIL  Minimum Frequency of Testing

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  ANNEXURE L 24/02/2014 TSM CIVIL  Minimum Frequency of Testing Could be every 3-4 days on major projects??

RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED  ANNEXURE L 24/02/2014 TSM CIVIL  Minimum Frequency of Testing