(SECTION 14-15) CHEVRON EICAS MESSAGES. Issue: Nov, 2003 Rev.:00 1 Section 14-09 – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Introduction OBJECTIVE: TO.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Planning Reports and Proposals
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Major Activities in JPNIC Since APNIC17 Izumi Okutani Japan Network Information Center NIR 18, Fiji 31 August – 3 September, 2004.
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
NPA WG : Single and multiple releases
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
ICAO Safety Management Systems (SMS) Course
Tutorial 3 – Creating a Multiple-Page Report
Facebook Part III How to Use the Features of Facebook Patrick Therrien Technology & Education Training Specialist.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Entity Location Contact Chapter 2. Entity Location Contact 2-2 Objectives Describe an Entity type Explain the Search process for Entities and Locations.
Entity Location Contact Chapter 2. Entity Information 2-2 Objectives Describe an Entity type Understand general navigation and data entry procedures Understand.
Michigan Electronic Grants System Plus
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
1 TIME MANAGEMENT Rob B Briner
Writing times in digital
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Windows XP Project An Introduction to Microsoft Windows XP and Office 2003.
The Advantage Series © 2004 The McGraw-Hill Companies, Inc. All rights reserved Working with Access Microsoft Office Access 2003 Chapter 1.
Integrify 5.0 Tutorial : Creating a New Process
Microsoft Office 2010 Basics and the Internet
Session 19: Individual Presentations. TimeFriday Day fives objectives Individual Presentations Individual.

Text 1 July, 2010 DCMS: Training Manual Campaign Management.
WELLIGENT SPECIAL EDUCATION ASSESSMENT plan TRAINING
1 of 22 International Reports Phase 2/ DA0539-w1 Last updated: International Reports Phase 2.
Table 22.1 Stakeholder summary for the Odd Shoe Company
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
MARKETING INFORMATION AND RESEARCH
Access Lesson 13 Programming in Access Microsoft Office 2010 Advanced Cable / Morrison 1.
Vanderbilt Business Objects Users Group 1 Reporting Techniques & Formatting Beginning & Advanced.
“The Honeywell Web-based Corrective Action Solution”
Page 1 Updated by: Yap Boon Thiam Technical Engineer Date: 09/5/2012.
New User Interface Training Guide for eCat November 2013.
Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
IAEA Training in Emergency Preparedness and Response Development of Simulation Exercise Work Session (Drill) Module WS-012.
Slide 1 doc.: IEEE /1092r0 Submission Simone Merlin, Qualcomm Incorporated September 2010 Slide 1 ACK Protocol and Backoff Procedure for MU-MIMO.
Energy and heat-aware metrics for data centers Jaume Salom, Laura Sisó IREC - Catalonia Institute for Energy Research Ariel Oleksiak, Mateusz.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
25 seconds left…...
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
KU Engineering EXPO Information: Teams of 1-3 students Appropriate Team Names Must meet deadlines (application & projects) Must be in good standing (grades/attendance)
Week 1.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
1 Unit 1 Kinematics Chapter 1 Day
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
Installation Requirements Paperwork Trail Difficulties
Benedetto Marasa ENAC Deputy Director General 1. – Cooperation in the development of: Safety regulations Standards Licensing measures Projects of mutual.
Benchmark Series Microsoft Excel 2013 Level 2
1 Recording & Viewing Archives. 2 Objectives: Identify the steps for starting, pausing and stopping the session recorder Identify the visual and auditory.
Malfunction Analysis Examination Instructions: You will be shown CDU, PDU, Caution Advisory and Master Caution panel indications. Additionally, significant.
Implementation/Acceptance Testing CSE Week 8 / 1 CSE9020 Case Study Week 8 Implementation and Acceptance Testing.
Silent Dismissal Dismissal Staff Quick Start Guide.
Module N° 1ICAO Safety Management Systems (SMS) Course 1 Module N° 1ICAO Safety Management Systems (SMS) Course 1.
Pilot Training Minimum Equipment List. Overview The MEL has a lot of information helpful to pilots. To familiarize you with the MEL we will look at: ◦MEL.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
State of Michigan Learning Management System (LMS) for Training Coordinators Updated: 10/29/2015.
Malfunction Analysis Study Guide UH-60 A.
Safety and health at work is everyone’s concern. It’s good for you. It’s good for business. Improvement of OiRA Presentation of the new features to the.
Initial Pilot Ground School
Air Line Pilots Association, International EMB 145 Oral Questions Center Pedestal Select “Slide Show” Use the space bar on your computer to advance the.
FLT CTRL NO DISPATCH Return to Service Procedures NOTE: FOR TRAINING PURPOSES ONLY. IT DOES NOT SUPERSEDE EMBRAER OFFICIAL DOCUMENTATION.
T-6B Electrical System Created:24 Aug 2015 Updated:30 Aug 2015 T6BDriver.com.


CHEVRON EICAS MESSAGES

Presentation transcript:

(SECTION 14-15) CHEVRON EICAS MESSAGES

Issue: Nov, 2003 Rev.:00 1 Section – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Introduction OBJECTIVE: TO PROVIDE A CLEAR UNDERSTANDING OF THIS NEW FEATURE CONTENTS: IMPLEMENTATION PHILOSOPHY OPERATION TRAINING

Issue: Nov, 2003 Rev.:00 2 Section – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Function Implementation ACFOG Per LOAD 19.4, EICAS messages are grouped and displayed in a chronological order according to their category. The Warning messages are displayed always on top followed by Caution, Advisory and Status, in this order. Per LOAD 21.2, a chevron sign (>) is displayed in the left of every EICAS message eligible to be the root cause of an event. This indication was introduced to improve pilot awareness when multiple messages are triggered at the same time due to a common event. LOAD 19.4 N/A. LOAD 21.2 Certain EICAS messages are displayed with a chevron sign. Affected manuals sections : AOM , QRH NP0-1, SOPM – Chevron EICAS Messages. CENTER EBAY FANS FAIL AVNX MAU 1A FAIL AVNX MAU 2A FAIL AVNX MAU 3A FAIL AC BUS 1 OFF AC ESS BUS OFF DC BUS 2 OFF DC ESS BUS 2 OFF ELEC EMERGENCY HYD 1 LO PRESS HYD 3 LO PRESS FWD EBAY FANS FAIL AVNX MAU 1B FAIL AVNX MAU 2B FAIL AVNX MAU 3B FAIL AC BUS 2 OFF DC BUS 1 OFF DC ESS BUS 1 OFF DC ESS BUS 3 OFF LG WOW SYS FAIL HYD 2 LO PRESS. LOAD 21.2 CERTIFIED BY: ANAC, FAA, EASA and TCCA on DEC07

Issue: Nov, 2003 Rev.:00 3 Section – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Philosophy SÓPM

Issue: Nov, 2003 Rev.:00 4 Section – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Operation PRIORITY MESSAGES THERE IS NOT PRIORITY AMONG MESSAGES ON THE SAME GROUP (WARNINGS, CAUTIONS, ADVISORIES) CHEVRON MESSAGE CHEVRON MESSAGE IS JUST A RECOMMENDATION FOR PILOTS ON HOW TO BEGIN THEIR PROCEDURES AVNX MAU 1A FAIL S SPOILER FAULT A ADS 1 FAIL B BRK LH FAULT B BRK RH FAULT END

Issue: Nov, 2003 Rev.:00 5 Section – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Training TRAINING PROPOSAL: CONCEPT WILL BE EXPLAINED DURING THE WARNING SYSTEM CLASSES AND PHILOSOPHY WILL BE PRACTICED DURING FFS SESSIONS TRAINING MATERIAL: CONCEPT DESCRIPTION WILL APPEAR IN THE NEXT AOM REVISION (Apr 08) AND WILL BE IMPLEMENTED IN THE NEXT CBT REVISION (Jul 08)

Issue: Nov, 2003 Rev.:00 6 Section – NAVIGATION SYSTEM CHEVRON EICAS MESSAGES Training