Translation and Translation Verification National Research Coordinators Meeting Amsterdam, 16 - 19 October 2006.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
Advertisements

MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop General Structure of a Survey Plan.
INSTITUTE for STATISTICS The International Standard Classification of Education ISCED 97.
(Individuals with Disabilities Education Improvement Act) and
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Presentation of the work programme revised by the Bureau of the SC Kaisa.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Translation and Verification of ICCS instruments Summary of the Field Trial & Plans for the Main Study National Research Coordinators Meeting Windsor,
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
DEPT, FERRARI AND MENDELOVITS: HOW TO ANALYZE AND EXPLOIT FIELD TEST RESULTS WITH A VIEW TO MAXIMIZING CROSS-LANGUAGE COMPARABILITY OF MAIN SURVEY DATA.
IDEA Advisory Special Education Roland-Grise Middle School Auditorium August 21, 2009.
Proposed Cognitive Test for the Main Study National Research Coordinators Meeting Windsor, June 2008.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
1 PROPOSAL FOR PROCEDURES AND SCOPE OF SHA DATA COLLECTION UNDER THE CO-OPERATION BETWEEN OECD, EUROSTAT AND WHO 7 th Meeting of Health Accounts Experts.
Medical School Preparation for LCME Accreditation The University Toledo College of Medicine August 24, 2011 Barbara Barzansky, PhD, MHPE LCME Secretary,
The Education Adjustment Program Profile – Revised.
National Adaptation Forms International Study Centre Data Management Seminar Hamburg, July 2008.
Reviewing the 2015 AmeriCorps Applications & Conducting the Review AmeriCorps External Review.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
Date: 07/20/2011 HCSIS, Independent Monitoring for Quality (IM4Q) - Considerations.
Data Management Seminar, 8-11th July 2008, Hamburg 1 Summary Common Sources of Error.
ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007.
INTOSAI WORKING GROUP ON KEY NATIONAL INDICATORS Dmitry Zaytsev Accounts Chamber of the Russian Federation Sofia, March 25, 2015 VIII MEETING WORKING GROUP.
Report on UNSD activities since the last meeting of the Expert Group on International Economic and Social Classifications Meeting of the Expert Group on.
2. Meeting in Magdeburg / Activities of IZAG- Summary Development of the Curriculum.
Supporting People Programme Review and Contract Monitoring.
Overview of ICCS field trial National Research Coordinators Meeting Windsor, June 2008.
Quality Control Program in ICCS Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Laws of Life Essay: FINAL DRAFT INSTRUCTIONS. When preparing your FINAL DRAFT, please do the following: 1.After making all corrections, print one final,
3rd NRC Meeting, 9-12 June 2008, Windsor 1 Data Management Procedures Michael Jung, IEA Data Processing and Research Center.
National adaptations to main survey instruments and layout verification National Research Coordinators Meeting Windsor, June 2008.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
Quality Assurance Program National Research Coordinators Meeting Amsterdam, October 2006.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
Data Management Seminar, 9-12th July 2007, Hamburg Data Entry Overview.
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
1st NRC Meeting, October 2006, Amsterdam 1 Data Management Procedures Preview of software used in ICCS Michael Jung, IEA Data Processing Center.
ICCS Main Survey Overview National Research Coordinators Meeting Madrid, February 2010.
International Standard Classification of Education (ISCED) Revision Status and next steps.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Data Management Seminar, 9-12th July 2007, Hamburg WinW3S - Introduction.
Case Study SummaryChallenges UPS is the world's largest package delivery company and a provider of supply chain management solutions. Their office in Brazil.
Study Overview National Research Coordinators Meeting Amsterdam, October
Career Pathways for English Language Graduates Liz Whitaker York St John University 16 th July 2008.
Meeting Minutes Program:Erasmus+ Project No: CZ01-KA Activity coordinator:ConPlusUltra GmbH, St. Pölten, Austria Name of activity:Workshop.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S - Introduction.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S – Listing Students and Assigning Booklets.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Student Background Questionnaire National Research Coordinators Meeting Amsterdam, October 2006.
Case Study SummaryChallenges Novartis, a Swiss multinational pharmaceutical company, needed a translation, cognitive debriefing and linguistic validation.
1 Serbian Association of Accountants and Auditors (SAAA) IFRS and ISA TRANSLATION.
Teacher Survey Design National Research Coordinators Meeting Amsterdam, October 2006.
Cognitive Testing of HPV Vaccine Survey Items Noel Brewer, UNC School of Public Health and the HPV Cognitive Testing Workgroup.
Reviewing the Applications & Preparing for the Review School Turnaround AmeriCorps FY13 Peer Review Orientation Session IV.
Lifespan 1 Submission Process to the IRB part 2 Revisions to Protocol.
Educational Publishing in WSOYpro Anita Seppovaara 2010 kaksi riviä.
GEF Familiarization Seminar
MGT 598 STUDY Lessons in Excellence- - mgt598study.com.
ابزار گرد آوری داده ها 1- پرسشنامه 2- مشاهده 3- مصاحبه
ELPA21 Student Report Webinar for Title III Directors
MISSOC NETWORK MEETING Amsterdam, 6-7 June 2016
International Comparison Program 2011 Round
Eurostat regional yearbook 2012 – new routines and time planning
Assignment Feedback (1)
Monthly meeting speaker organiser Monthly Meeting speaker organisers
Living Donor Committee
New Client On-boarding Process
Presentation transcript:

Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006

NRC Meeting Amsterdam Oct 2006 Translation of the instruments International Version of the instruments prepared in English TRANSLATOR produces first draft translation REVIEWER makes comments to translation Translator incorporates comments; NRC arbitrates in the case of disagreements

NRC Meeting Amsterdam Oct 2006 Translator and Reviewer  TRANSLATOR(S) produces first draft translation –The target language as mother tongue –An excellent knowledge of English –Familiarity with survey type of instruments REVIEWER(S) makes comments –The target language as mother tongue –An excellent knowledge of English –Familiarity with survey type of instruments –Familiarity with subject of study

NRC Meeting Amsterdam Oct 2006 Check points for translated instruments Check Point 1: translation verification by independent verifiers (IEA Secretariat) Check Point 2: Review of the layout of the instruments (ISC)

NRC Meeting Amsterdam Oct 2006 Translation verification Two language services companies involved Professional translators/interpreters Target language – mother tongue Preferably located in the target country (or in regular contact) Trained by IEA

NRC Meeting Amsterdam Oct 2006 Materials to be submitted for translation verification All instruments translated into the languages they will be administered (Word Files) National Adaptation Forms

NRC Meeting Amsterdam Oct 2006 National Adaptation Forms Background Questionnaires –Questions that require national adaptations in each country –Other adaptations –Not administered questions or question parts Adaptation made to the Student Perceptions Questionnaire items Adaptations made to Cognitive Test items

NRC Meeting Amsterdam Oct 2006 Example 1

NRC Meeting Amsterdam Oct 2006 Feedback on translation Verifier will insert comments and suggestions concerning translation to the Word files, using Track Changes function Files with proposed corrections, changes and comments (including severity codes) will be sent to NRC

NRC Meeting Amsterdam Oct 2006 Example 2

NRC Meeting Amsterdam Oct 2006 After feedback on translation Necessary corrections to the instruments have to be implemented Instruments Revision Summary has to be completed National Adaptation Forms have to be revised

NRC Meeting Amsterdam Oct 2006 Instruments revision summary Please report verifier’s suggestions which were not introduced!

NRC Meeting Amsterdam Oct 2006 Layout verification One copy of each instrument (translation verified and corrected) as PDF file Updated National Adaptation Forms The ISC will review instruments and will send its comments to NRC

NRC Meeting Amsterdam Oct 2006 After receiving feedback on layout Final corrections to the instruments have to be made National Adaptation Forms have to be revised Final version of the instruments and National Adaptation Forms should be sent to ISC INSTRUMENTS CAN BE PRINTED!

NRC Meeting Amsterdam Oct 2006 Timeline Verification of full set of instruments takes approximately two – four weeks, dependently on: –Scope of the instruments (more if Regional Module instruments are included) –Quality of translation

NRC Meeting Amsterdam Oct 2006 Questions and comments ?!!