Drizair (QLD) P/L ABN: 59 067 074 953 Aug 2009. Introduction Definition of Building Drying. Why dry the building? What does building drying involve? Who.

Slides:



Advertisements
Similar presentations
Tips, Tricks & Unusual Infrared Solutions Presented by: Kim Lewis
Advertisements

Restoring Peace of Mind ServiceMaster of Greater Tacoma.
Current State of the Home Performance Industry Who’s doing what, and why? And, how does this affect your program? A. Tamasin Sterner July 2011.
International Conference on Management of Spent Fuel from Nuclear Power Reactors, Vienna, 31 May - 4 June 2010 Anibal Barrera Life Extension Project Embalse.
Keeping You Safer, Longer. What is NFPA 1851? Standard on Selection, Care and Maintenance of Protective Ensembles for Structural Fire Fighting and Proximity.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Thermal Imaging & Trace & Access Nick Jeffery Training Manager.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
SETUP Chapter 6 Lead Abatement for Workers Course.
Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project.
TRANSPORTATION (Farm Gate to Processing Facility).
Restoring Flooded Buildings Kenneth Hellevang, Ph.D., P.E. Extension Engineer and Professor North Dakota State University Fargo, ND.
Clean-up Steps Remove water Empty Contents Remove water, mud & muck Remove wall materials and etc. Wash Sanitize Ventilate & dry.
1 Thermography of Buildings Stacey Ward - BSRIA Instrument Solutions - - Sales Manager -
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
Infrared Thermography and The Building Envelope Regardless of the building type involved, infrared thermography can provide remarkable, nondestructive.
Insulation Below Pier and Beam Homes Presenter: Gordon Fox Fox Inspection Group Providing Peace of Mind, One Home At A Time, Since 1989 Helping You, Help.
Pesticide Storage Shelby Filley and Tim Stock Oregon State University Extension Service.
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Health and Safety Executive Floor Cleaning and its impact on Slips and Trips.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Portable Fire Extinguishers Selection and Placement University Safety Council April 19, 2006 Steven G. Triebold Fire Prevention and Protection Program.
The Drying of Heritage Properties Nigel Hewitt Technical Manager.
SQF ISO FSSC GMP Programs
Micro Wind for Remote Sites James Jarvis APRS World, LLC
Thermal Imaging & Leak Detection Nigel Hewitt Technical Manager.
Like it never even happened. ® NATIONAL AGREEMENT Alfa Insurance SERVPRO ® Industries, Inc.
8.02 Aseptic Techniques Implement aseptic technique to maintain equipment Images courtesy of google images.
Electrical Safety.
1. The Challenge Hospital-associated infections (HAIs) like MRSA continue to be a problem in health care facilities It is estimated that each year in.
CILA Junior Conference 2012 Drying Equipment Rachel Newton.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Welcome to The Complete Professionals. Compro Services Servicing CALGARY & CANMORE And All Surrounding Communities.
Introduction To the pr EN ISO Project norm
Masonry Green Application 1. Key Lessons from Masonry In Masonry, we learned about: Materials and products from brick and CMU to mortars Tool and equipment.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
Good Hygiene Practices along the coffee chain Establish a Monitoring System for each CCP (Task 9 / Principle 4) Module 4.9.
Objectives At the end of the lesson the students are expected to: 1. Examine the different cleaning chemicals and familiarize with the different tools.
Seasoning Seasoning is the reduction of the moisture content of wood.
9. THERMAL MASS  Thermal mass is a measure of a material's capacity to absorb heating or cooling energy. Materials such as concrete or bricks are highly.
Food Storage. OVERVIEW Describe general storage requirements for different types of food. GeneralRefrigeratedHeated Semi Perishable.
Unit 6/P6 – Timber Frame Construction Name ________________
Measurement Equipment
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Inspections. Structural Evaluation Look for any movement, check alignment, bowing, cracks, separation Basement wall/foundation Check floors & ceiling.
Storage of Health Commodities Supply Chain Management.
Equipment & Utensils Using the Right Tools. Our Goal To provide information about the best selection, use and maintenance of food preparation equipment.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
9. Sample Infrared Images
Georgia Tech Safety and Health Consultation Program
Water Damage Process and Procedures
Draught Finder Trevor Clark 8. Thermal Infrared Inspections
Infrared Inspection Services in UAE
CHAPTER 15 Ventilation: Tactical Priorities
Design A Healthy finished basement
SQF ISO FSSC GMP Programs
World Bank support to GoE’s Sanitation Marketing & Business Development Initiative Sirak Wondimu, Sanitation Marketing & Business Development Coordinator.
Wind Hazard Modeling and the HAZUS Wind Model Part III
Excavation.
Environmental Aspects & Impacts
Independently owned and operated
Independently owned and operated
03 | Basic Admin Capabilities
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Confidential & Proprietary. Nexxus Solutions Group, LLC.
Presentation transcript:

Drizair (QLD) P/L ABN: Aug 2009

Introduction Definition of Building Drying. Why dry the building? What does building drying involve? Who should dry the building? 2 Building Drying Projects. Summary. Drizair (QLD) P/L ABN: Aug 2009

Definition – ‘Building Drying’ Building Drying is the mechanical removal of abnormal moisture from building structural materials within the building envelope, so that their normal Equilibrium Moisture Content (EMC) for that environment is achieved. Drying of flooring – concrete sub flooring, tiled floors & wood flooring. Drying of walls including wood framing, gyprock, block & brick walls. Drying of cavities – within kitchens, vanities, built-in storage & more. Drizair (QLD) P/L ABN: Aug 2009

Why dry the building? The removal of abnormal moisture prevents: Secondary damage  Degradation of materials  Mould & related health issues Expensive replacement & rebuilding costs Expensive Business interruption Lessens inconvenience to building occupants Drizair (QLD) P/L ABN: Aug 2009

What does building drying involve? Initial Mitigation Inspection & Report Drying plan with consideration for occupants Installation & Monitoring Job Completion Drizair (QLD) P/L ABN: Aug 2009

Initial Mitigation Initial mitigation could include: Engage carpet cleaner to remove excess water Engage clean up crew Removal of mud/silt Removal of contaminated/damaged contents Removal of wall linings, carpeting, flooring, & cabinetry. Related hygiene requirements Drizair (QLD) P/L ABN: Aug 2009

Inspection & Report Building Inspection - Should be carried out in every situation as a minimum standard. Seeking visible signs of moisture using Thermal imaging (infrared camera). Drizair (QLD) P/L ABN: Aug 2009

Inspection & Report Drizair (QLD) P/L ABN: Aug 2009 Testing for moisture content - Penetrating & non- penetrating calibrated moisture meters. Specific Meters, Moisture Probes, Boroscopes.

Installation & Monitoring Drizair (QLD) P/L ABN: Aug 2009

Job completion When the building materials are dry, we: Pack up. Produce Drying Certificate & Sanitation Certificate. Engage further services where required, e.g. Carpet & upholstery cleaning, tile cleaning. Drizair (QLD) P/L ABN: Aug 2009

Who should dry the building? Experienced & Qualified technicians with: the right building inspection tools & moisture detection instruments. the ability to interpret readings relating to that particular building envelope. an extensive inventory of drying equipment to be equipped appropriately for any job. an understanding of clients needs. Drizair (QLD) P/L ABN: Aug 2009

Project 1 – Spotlight Mackay Drizair (QLD) P/L ABN: Aug 2009

Project 2 – Two Schools, Mackay Drizair (QLD) P/L ABN: Aug 2009

Summary Drizair (QLD) P/L ABN: Aug 2009 Further Information: BSA web site – – publications RIA web site – – technical librarywww.restorationindustry.org Drizair website –