Edit this text for your title

Slides:



Advertisements
Similar presentations
SHIP LOADS AND STRESSES
Advertisements

Fluid Fluid - any substance that “flows”… liquids and gases.
Edit this text for your title
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 1 Load Out of Jacket 19C Offshore Facilities Load Out of T.D.A.D.
Teacher Enrichment Program: Bite of Science March 18, 2013 McDermott Engineering, LLC © 2013 McDermott International, Inc. All rights reserved. Jillian.
The first floating wind turbines Martin Jakubowski Technology Architect Blue H Technologies BV, The Netherlands Brindisi, Italia 23rd of May
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
An Experimental Investigation on Loading, Performance, and Wake Interactions between Floating VAWTs ____________________________________________ Morteza.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
TRICERATOPS The Case for a New Deepwater Concept
PART SIX Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Offshore Oil Formation The formation of oil takes a tremendously long time. Millions of years ago plants and animals of the oceans died & settled on the.
Rectangular framed structures
Chapter 19 Floors.
Lesson 8 Offshore Drilling
Floating Production Systems
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1) The history of Technip 2) Range of services
MFP – Installation using a Jack up Rig
OFFSHORE PLATFORM DESIGN
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Review of Fluid Properties
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
INSTALLATION OF TOPSIDE USING FLOATOVER METHOD
Opportunities and challenges in floating wind Eirik Byklum – 27 November 2012.
Overview of SURF Systems & Analysis
Topic 2 Off-shore Oil Sedimentary Basins of Canada (Locations of Oil and Gas) 1. Western Canada Sedimentary Basin 2.Hudson Bay Basin 3. Mackenzie and.
Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be offset.
Buoyant Forces Chapter 3 Section 2.
Chia Po Lin EWTEC Lisbon PhD Thesis Edinburgh University.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
PHASE 7 FACILITIES ENGINEERING
Industrialized Floating Foundation
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
PROJECT BACKGROUND Location coordinate :
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
March 6, 2014 Client: Dr. Michael Hinchey Group Name: LifeSub Engineering Group Number:M14 Group Members:Ajanthan Asokan William Barkhouse Matthew Browne.
Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER.
What’s the future of decommissioning globally?
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Floating Windmill ( A solution to present power shortages in Tamilnadu) Present By R Sugumar V Suriya Raja GS.
SX1 manipulation VERSION 1 Version
OFFSHORE CONSTRUCTION
Systems Model and Offshore Oil
Design Factors Collapse Corrected
INSTRUCTOR © 2017, John R. Fanchi
Harbors and Ports Engineering Geology – CE31FB2.
Physics: Review Forces.
Edit this text for your title
TMR4225 Marine Operations, UUV/AUV definitions
Chia Po Lin EWTEC Lisbon PhD Thesis Edinburgh University
Unit 4 Primary Resource Activities
TMR4225 Marine Operations, Lecture content:
Petro Data Mgt III- Facilities
Presentation transcript:

Edit this text for your title MEK 4450 Marine Operations Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2012

Various Types of Platforms Floating or bottom fixed Living quarters, storage, drilling, processing etc Foundation + topside

Installation Prepare for transport Tow to field Installation Load-out, dry tow Transfer to floating condition, wet tow Tow to field Design of towing fleet Installation Transfer to “installation mode” Positioning (horizontal and vertical) Hook-up to mooring, set- down on sea floor etc. Installation of topside

Jacket fabrication Bilder

Load-out Bilder

Load-out Bilder

Transportation Bilder

Some challenges during launch and upending Position and size of temporary buoyancy tanks Maximum forces at rocker beam Maximum depth during launch Structural loads due to hydrostatic pressure Bottom clearance Floating condition after launch Access to lifting arrangement Upending Structural loads Crane load Bottom clearances Proper upright position Ballasting of side legs

Jacket installation: crane lift

Jacket installation,- final phases Jacket in upright position? Ballast in jacket legs Transit to set-down point. Several 100 meters Further ballasting and lowering by crane Landing Release crane On-bottom stability in temporary phase? Piling

Topside Bilder av Loadout og floatover Skidding or trailers

Topside

Float-over

Topside Bilde av Dry tow-out

GBS Bilder at GBS utslep og installasjon

Jack- up

Jack-up footings

Tension Leg Platform (TLP) Platform with buoyant sub-structure Vertical strong and stiff mooring, high pre-tension Vertical motion arrested Large horizontal motions

TLP installation Lowering and piling of foundations Tendon installation Tow-out of platform Hook-up and pre-tensioning

Types of floaters

Installation of mooring system

Tow-out and installation of floater

Tow-out and installation of floater

Tow-out and installation of floater

Mooring hook-up

Mooring hook-up Skisser