D&C PT Contractor’s Role & Responsibilities Chris M. Harris Contracts Manager, Structural Systems & PTIA Technical Committee.

Slides:



Advertisements
Similar presentations
PRESENTATION ON TURNKEY CONSTRUCTION.
Advertisements

Project Planning: Assembling a Mortenson “Integrated Work Plan”
Actions and Retrofit of Post Earthquake-Damaged Bridges
Concrete Slab Technology
Practical Application of Finite Element Analysis to the Design of Post-Tensioned and Reinforced Concrete Floors Jonathan Hirsch, P.E.
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
Optimising Building Design for Sustainability Using High Performance Concrete Doug Jenkins - Interactive Design Services Daksh Baweja – The University.
Commercial Framing C D Prints Unit 13.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
1 By: Ted Garrison New Construction Strategies Follow on twitter:
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Concrete Pre Cast Panel By Peter Spence ID:
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Department of Civil and Environmental Engineering, The University of Melbourne Finite Element Modelling Applications (Notes prepared by A. Hira – modified.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
© 2012 Autodesk Autodesk® Revit® Structure: From Design to Detailing and Fabrication to Construction Allen Levy Applications Specialist.
DRAWING ON EXPERIENCE … BUILDING ON STRENGTH Six Storey Wood-Framed Buildings Unique Structural Opportunities & Challenges Kurt Ruhland, P.Eng. Director,
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Specification & Quantities Estimating
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Palomar Medical Center West: Segmented Review Process.
ASSOC.PROF.DR. İBRAHİM YİTMEN
1 DESIGN RESPONSIBILITIES Contract Information Supplied by Design Team Responsibility of the Precaster Option I Provide complete drawings and specifications.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Green Concrete 1 1.
THE CONSTRUCTION TECHNOLOGY CONSULTANTS Lowther-Rolton Established 1987 Safety Quality Leadership Innovation Commitment The Methodology and Benefits of.
Tensegrity Structures and their Application to Architecture
Joanne Macgregor C Lund & Son Ltd March 2016
Seminar On Green Concrete Submitted To: Submitted By:
Structural Slab Analysis
Concrete structures FOR BUILDINGS IN A CHANGING WORLD
Façade Management Consulting
Advisor: Professor M. Kevin Parfitt
RIBA Plan of Work 2013.
Costs and Economics of Construction
BUILDING CONSTRUCTION 1
SHERINE RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
Temporary Works Co-ordination
COST PLANNING AND ESTIMATION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
Quality Management Systems – Requirements
Introduction to Structural Design
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
Masonry Bearing Walls.
CIC BIM Competition Presentation Template & Content Guide
Introduction to Structural Design
RIBA Plan of Work 2013.
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
IPHA Sales and Marketing Seminar Barcelona 2018
Presentation transcript:

D&C PT Contractor’s Role & Responsibilities Chris M. Harris Contracts Manager, Structural Systems & PTIA Technical Committee

Introduction Why do PT contractors get involved in the design of the project to start with? What are the common efficiencies introduced to the structure by a PT contractor? Integration of the PT contractor into the design team. What aspects of the existing design will the PT contractor review/change Examples Conclusion

Why do PT contractors get involved in the design of the project to start with ? Commercial desire Specialist engineers, design draftspersons, & design software Risk & reward allocation Time Constructability

What are the common efficiencies introduced to the structure by a PT contractor ? Element thicknesses Support optimisation Slab structure type optimisation & formwork Reinforcement rationalisation

Integration of the PT contractor into the design team. Definition of structure performance Documentation status Coordination Design Program Certification

What aspects of the existing design will the PT contractor review/change? Depends on the type of project Ieff / Igross (for buildings) Concrete grade / volume / thickness Structure type (flat plate / flat slab / banded) Restraint design Rebar content

Eureka Tower Conforming design Reinforced slabs

Eureka Tower Non conforming design PT bands and slabs Driving force TIME

Conclusions Project Engineers to coordinate with contractors Involve a PT contractor early

PT in buildings PT is likely to be considered for most projects. If the consultant doesn’t consider it, then the contractors will

Why PT? Savings in materials Savings in construction time Improved durability and robustness Cost savings

Some perceived down side issues Time consuming to design by the occasional designer ? PT applies real force into a structure hence analysis (incl. secondary effects) needs to be realistic and specific.

Some perceived down side issues System and process needs to be understood and details coordinated sufficiently Finding most economical proportions of concrete, PT & reinforcement can be a lengthy iterative process, but usually yields substantial benefits. Software & experience is key.

Other effects to consider Secondary effects in all indeterminate PT structures, but can be beneficial Structural movements (creep, shrinkage, thermal) Structural restraints (walls, stability elements) Dynamic behaviour (may be a lighter, livelier structure) If doubt exists, talk to a specialist PT designer (or the PTIA)

PT design is not different however... Effective & efficient design does require experience With sound engineering knowledge and practice this can be done successfully. Assistance and guidelines can normally be obtained from the specialist contractors

Design philosophy Consider the general concept of partially prestressed concrete Appropriate proportions of reinforcement and prestressing steel depends on the application (restrained v. unrestrained concrete)

The D&C route for PT delivery The usual variants here are: D&C by tender invitation D&C by alternative design If D&C is expected and planned for, time efficiencies and innovations can occur

D&C Design Brief A Post Tensioning Design Brief is critical for a successful D&C arrangement. It should focus on the performance requirements on the design  The extent of D&C area required  The loads and load paths  Member sizes with acceptance tolerances  Serviceability and durability requirements  Movements and Jointing strategy  Define the Design, certification & approval process

Performance requirements As far as possible indicate:  Architectural requirements (tolerances, finishes etc)  Site constraints and constructability issues  Pour sequence & any limitations on edge stressing access  Limitations of the supporting structure.  Any frame actions that need to be considered in floor design.  Expected areas of restraint and strategy for its management incl. location & types of pour strips &/or temporary movement joints &/or permanent building joints.  Roles and responsibilities in the design process  Inspections and installation signoffs  Quality and safety requirements.

Types of PT Contract Supply and Install (S&I) –Structural design, documentation, inspection & certification by engineer –Shop drawings, install, QA by specialist contractor Design and Construct (D&C) –structural floor design, documentation by specialist contractor –Install, inspection & certification by specialist contractor –Engineer remains responsible for vertical elements, stairs, wind & earthquake design, etc.

D & C Tender Information Post Tensioning Price Conventional Reinforcement Quantities Concrete Properties and Profiles Structural Design Criteria Detailed Scope of Work Client Responsibilities Contract Conditions

Design Considerations for PT Price Pour Size Strand Diameter Number of Strands per Tendon Couplers Efficient Approval Process

Concrete Properties and Profiles Concrete outlines and grade needs to be provided with PT price for client to determine total cost of solution. Be aware of concrete testing & strength requirements for initial & final stressing, these are essential for performance of concrete & safety at PT anchorages.

Structural Design Certificate Loads Durability Requirements Deflection Criteria Analysis Assumptions

Detailed Scope of Work Design Deliverables for D&C, usually: –Concrete outlines –PT drawing (design & shop in one) –bottom reinforcement drawing –top reinforcement drawing –sections & details Construction Services

Client / Builder Responsibilities Site Amenities Supply of Power and Water Lifting of our Materials on to the Decks Supply and Install of Conventional Reinforcement including Studrails where applicable Concrete Infill of Top Surface Stressing Pans Anything else (job specific)

Contract Conditions Reference to Standard Conditions of Contract Reference to EBA Variation Rates Payment Terms Retentions Liquidated Damages Insurances

Project Relationships Developer Head Contractor Post Tensioning D & C Subcontractor Formwork Sub- Contractor Reinforcement Supplier Steel Fixer Concreter Architect Structural Engineer

Timely Co-ordination Co-ordination between: services consultants architect structural engineer builder’s services (alimaks etc) all by others. Co-ordination between: structural engineer pt design shared by engineer & specialist pt designer. Timeliness & information sharing is critical. Late information will lead to re-work & additional costs. Failure to co-ordinate will lead to re-work & additional costs.

Acknowledgements John Fairweather Frank Filippone Jamie Mackenzie who are the authors of most of these slides. However any errors are mine.