Self Drilling Rock Bolt System for the Coal Industry Ground Support Services Pty Ltd & Alminco Pty Ltd March 2008.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Small Engine Parts Identification Test
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Unit C: Agricultural Power Systems
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
ENGINE CONSTRUCTION.
AUTOMOTIVE COOLING SYSTEMS
ENGINE TOP END.
AUTOMOTIVE BRAKING SYSTEMS
FUEL SUPPLY SYSTEM.
September Wood to Warmth – Fuel Delivery and Storage Michael Beech TV Energy.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Pneumatic Cylinders Chapter 3.
Pneumatic Principles.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
ZMQS ZMQS
Sectional Assembly and Installation
Year 6/7 mental test 5 second questions
S.Thomas College Gurutalawa OLD BOYS ASSOCIATION 2008/09 JUNIOR DORMITORY TOILET PROJECT.
MACHINE TOOLS – I.
Disassemble, Assemble and Perform a Function Check on the M249
Fundamentals of Onshore Drilling
January 2001ASTRON BUILDINGS S.A.1 STEEL. January 2001ASTRON BUILDINGS S.A.2 STEEL as a construction material.
ABC Technology Project
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
HT Series – High Temperature Technology 1 INTERPUMP GROUPS NEW PUMP LINE FOR CAR WASH AND INDUSTRIAL APPLICATIONS UP TO 85°C (185° F)
© S Haughton more than 3?
Squares and Square Root WALK. Solve each problem REVIEW:
Concrete Fooring & Roofing System
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
ACARP Roadway Development Operators Workshops - October 2011
Test B, 100 Subtraction Facts
Automotive Engines Part 3 (internal Parts).
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Flat Flow by Kamila Součková 11. Task Fill a thin gap between two large transparent horizontal parallel plates with a liquid and make a little hole in.
Environmental Drilling By: Josh Humphreys October 8,2006.
Research Update Automated Bolting and Meshing Project - C17018.
1Copyright © Xstrata plc Tensionable Tendons Phil Howes Tahmoor Colliery.
Self Drilling Rock Bolt Technology for the Coal Industry Advanced Solutions Ground Support Services Pty Ltd September 2007.
ACARP – Roadway Development 11, 13, 21 September 2007
Drilling Fundamentals ©Dr. B. C. Paul 2000 Note – The types of drilling machines discussed in these slides reflect the author’s view of what is offered.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Universal College Of Engineering & Technology
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
© 2009 GSS Pty Ltd 1 SDRB S YSTEM USING P UMPABLE R ESIN  Considerable improvements to the crawler rig  Development work on a new pumpable resin including.
Drilling machine. Introduction Drilling is a metal cutting process carried out by a rotating cutting tool to make circular holes in solid materials. Tool.
Fluid Power Control.
"Improvements in the Bolting Cycle Using Conventional Installation Methods" John Naylor – Queensland Technical Manager, Jennmar Harold Hinton – Queensland.
Jennmar Queensland Cert IV Workplace Training and Assessment By John Naylor & By John Naylor & Harold Hinton Jennmar Queensland Correct Installation for.
Optimum Pump Performance for Process Applications
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Drilling machine.
Automated Bolting and Meshing Project - C17018
Presentation transcript:

Self Drilling Rock Bolt System for the Coal Industry Ground Support Services Pty Ltd & Alminco Pty Ltd March 2008

© 2008 GSS Pty Ltd & Alminco Pty Ltd 2 Advanced SDRB System  Installation System  New Alminco Crawler Rig  Integrated Bolting & Resin Pumping System  Standard Steel SDRB  New Telescopic SDRB  New Fibreglass SDRB  Future Directions  Installation System  New Alminco Crawler Rig  Integrated Bolting & Resin Pumping System  Standard Steel SDRB  New Telescopic SDRB  New Fibreglass SDRB  Future Directions

© 2008 GSS Pty Ltd & Alminco Pty Ltd 3 Objectives of the SDRB project:  Pumpable Resin Bolting System  Fit existing machines  Resin tanks, resin pumps, delivery system etc  Roof and Rib support  Minimise manual handling  Maximise rock support  Improve Productivity  Pumpable Resin Bolting System  Fit existing machines  Resin tanks, resin pumps, delivery system etc  Roof and Rib support  Minimise manual handling  Maximise rock support  Improve Productivity

© 2008 GSS Pty Ltd & Alminco Pty Ltd 4 Installation System Standard Crawler Rig with new engineering features:  Integrated & self contained  Operator seated remote from drilling & resin injection operation  Standard drill mast – vertical & horizontal drilling  New innovative Drilling Chuck Standard Crawler Rig with new engineering features:  Integrated & self contained  Operator seated remote from drilling & resin injection operation  Standard drill mast – vertical & horizontal drilling  New innovative Drilling Chuck

© 2008 GSS Pty Ltd & Alminco Pty Ltd 5 Installation System New Drilling Chuck features:  lightweight with RH & LH mounting  offset drive motor with quick detach injection head  2 speed with RH & LH rotation  through drive socket tension to roof New Drilling Chuck features:  lightweight with RH & LH mounting  offset drive motor with quick detach injection head  2 speed with RH & LH rotation  through drive socket tension to roof

© 2008 GSS Pty Ltd & Alminco Pty Ltd 6 Resin System Resin Delivery System:  Two separate systems with resin pressure control  Twin 120 litre tanks (easily increased)  New Injection Head:  seamless water & resin injection & flushing  quick change over & replacement Resin Delivery System:  Two separate systems with resin pressure control  Twin 120 litre tanks (easily increased)  New Injection Head:  seamless water & resin injection & flushing  quick change over & replacement

© 2008 GSS Pty Ltd & Alminco Pty Ltd 7 Why Pumpable Resin SDRB? resin fills bearing plate & also locks mesh in place full encapsulation both inside and outside bolt  Full bolt encapsulation maximises roof support  Resin fills cracks & cavities  No gloving, no plastic film  Perfect resin mixing every time  Resin fills bearing plate & locks mesh in place  Minimises water inflow & bolt corrosion  Full bolt encapsulation maximises roof support  Resin fills cracks & cavities  No gloving, no plastic film  Perfect resin mixing every time  Resin fills bearing plate & locks mesh in place  Minimises water inflow & bolt corrosion visible resin at collar proves full encapsulation

© 2008 GSS Pty Ltd & Alminco Pty Ltd 8 Plate Design  Round design – stackable with no orientation required  “soft” footprint won’t damage mesh  Large plate “footprint”  Resin can fill bearing plate & lock mesh in place & provide intimate surface contact  Once full of resin, becomes very strong in compression  Round design – stackable with no orientation required  “soft” footprint won’t damage mesh  Large plate “footprint”  Resin can fill bearing plate & lock mesh in place & provide intimate surface contact  Once full of resin, becomes very strong in compression

© 2008 GSS Pty Ltd & Alminco Pty Ltd 9 Standard Steel SDRB  One piece  No drive dollies, no drill rods, no resin cartridges  fast penetration with high thrust  High Capacity ~ 36 tonnes  High load transfer capacity >1.4 tonnes/cm  Custom bearing plates with “soft” footprint  One piece  No drive dollies, no drill rods, no resin cartridges  fast penetration with high thrust  High Capacity ~ 36 tonnes  High load transfer capacity >1.4 tonnes/cm  Custom bearing plates with “soft” footprint

© 2008 GSS Pty Ltd & Alminco Pty Ltd 10 Rock Drilling Rock Drilling with SDRBs:  Possible to drill 80 MPa concrete with blue metal  Tungsten carbide ensures maximum penetration rate  Tungsten carbide equates to about 4 seconds in time cost Rock Drilling with SDRBs:  Possible to drill 80 MPa concrete with blue metal  Tungsten carbide ensures maximum penetration rate  Tungsten carbide equates to about 4 seconds in time cost

© 2008 GSS Pty Ltd & Alminco Pty Ltd 11 Principle of the Telescopic SDRB

© 2008 GSS Pty Ltd & Alminco Pty Ltd ~3.4m Principle of the Telescopic SDRB

© 2008 GSS Pty Ltd & Alminco Pty Ltd 13 New Telescopic SDRB 1.9m 3.4m  One piece  Automatically extendable  No couplers, no drive dollies, no drill rods, no resin cartridges  High Capacity ~ 36 tonnes  High load transfer capacity ~2.0 tonnes/cm  Fast, simple  One piece  Automatically extendable  No couplers, no drive dollies, no drill rods, no resin cartridges  High Capacity ~ 36 tonnes  High load transfer capacity ~2.0 tonnes/cm  Fast, simple

© 2008 GSS Pty Ltd & Alminco Pty Ltd 14 New Fibreglass SDRB nut & thread >10 tonnes Simple, high speed, high capacity Hollow Fibreglass Rod >30 tonnes Fits same Drill Chuck as steel SDRBs

© 2008 GSS Pty Ltd & Alminco Pty Ltd 15 New Fibreglass SDRB Spiral wound surface provides undulations Grit coated surface Surface provides very high load transfer capacity ~ 1 tonne/cm

© 2008 GSS Pty Ltd & Alminco Pty Ltd 16 New Fibreglass SDRB Injection moulded thread Hollow Fibreglass Rod Hardened Steel Drill Bit Small borehole annulus

© 2008 GSS Pty Ltd & Alminco Pty Ltd 17 New Fibreglass SDRB Coal Drilling in Ribs:  hardened steel drill bits okay for coal ribs  patented Drill Bit design enables small borehole annulus  minimises resin volume  maximises load transfer capacity Coal Drilling in Ribs:  hardened steel drill bits okay for coal ribs  patented Drill Bit design enables small borehole annulus  minimises resin volume  maximises load transfer capacity

© 2008 GSS Pty Ltd & Alminco Pty Ltd 18 Bolt Performance

© 2008 GSS Pty Ltd & Alminco Pty Ltd 19 SDRB Drilling in 80 MPa concrete  Drilling in 80 MPa concrete with blue metal  Penetration rate reasonable  Rotary drilling only – no percussive  Note water being displaced by resin  Full resin encapsulation of bolt and plate Points to Note:

© 2008 GSS Pty Ltd & Alminco Pty Ltd 20 Full Resin Encapsulation Resin filling “cavities” The pumpable resin system synergistically enhances the SDRB & the bearing plate

© 2008 GSS Pty Ltd & Alminco Pty Ltd 21 Future Directions:  Refine & test Crawler mounted System  Large scale secondary bolting demonstration  Quantify field support performance:  mechanical & geotechnical & cycle times  Engineering design for a production face system  Future Continuous Miner mounted system  Refine & test Crawler mounted System  Large scale secondary bolting demonstration  Quantify field support performance:  mechanical & geotechnical & cycle times  Engineering design for a production face system  Future Continuous Miner mounted system

© 2008 GSS Pty Ltd & Alminco Pty Ltd 22 Thanks:AcarpXstrataAlminco Thanks:AcarpXstrataAlminco