Introduction. OzPoz is the fiber positioner for FLAMES, a multi-object spectroscopic facility on the VLT. It can feed light from as many as 140 objects.

Slides:



Advertisements
Similar presentations
How to Use the Earthquake Travel Time Graph (Page 11
Advertisements

Satellite meeting - Designating habitable planets for follow-up study: what are the relative parameter spaces of RV and astrometry? (P2 Panel) Scientific.
[ ] Preliminary Results of Full-Scale Monitoring of Hurricane Wind Speeds and Wind Loads on Residential Buildings Peter L. Datin Graduate Research Assistant.
1 Welcome Safety Regulatory Function Handbook April 2006.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Configuration management
Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
Multi-long-slit Spectroscopy for Kinematic Studies. I. Implementation and Demonstration Rene A. M. Walterbos, Jiehae Choi, Sophia Cisneros, Maria T. Patterson,
Evolution of Magnetic Setting in Flare Productive Active Regions Yixuan Li Space Weather Research Lab New Jersey Institute of Technology.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
1 WHT 2 Degree Field Forward Cass, Prime Focus correctors, multi-object spectrographs David King Institute of Astronomy University of Cambridge Science.
Calibration for LHAASO_WFCTA Yong Zhang, LL Ma on behalf of the LHAASO collaboration 32 nd International Cosmic Ray Conference, Beijing 2011.
Spectroscopic Reference Design Options D. L. DePoy Texas A&M University.
Hexabundles meet OzPoz Hexabundle science workshop University of Sydney 24 th November 2008 Andrew McGrath, AAO.
Chapitre 3- Astrometry PHY6795O – Chapitres Choisis en Astrophysique Naines Brunes et Exoplanètes.
1 Lites FPP-SP Initial Reduct SOT #17 Meeting, NAOJ, April Solar-B FPP Initial Data Reduction for the FPP Spectro- Polarimeter October, 2004 Bruce.
SPD/AAS Poster May 2007 Mark Weber Smithsonian Astrophysical Observatory On-Orbit Measurement of the Hinode / XRT Point Response Function.
The Maryland Optics Group Parametric Studies for FSO Transceiver Pointing Tzung-Hsien Ho, Sugianto Trisno, Stuart D. Milner*, and Christopher C. Davis.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
An Echidna-style positioner for DESpec
Sept. 18, 2008SLUO 2008 Annual Meeting Science Opportunities with LSST David L. Burke SLAC/KIPAC.
The Properties of Stars Masses. Using Newton’s Law of Gravity to Determine the Mass of a Celestial Body Newton’s law of gravity, combined with his laws.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Green Bank Laser Rangefinders.
An Echidna-style positioner for DESpec Will Saunders 8 March 2011.
Spectroscopy Techniques and Projects at 1.2-m UK Schmidt Telescope
Activity 1: The Rotating Earth
Jupiter Mutual Events Sep 2014 to Aug 2015.
A. McGrath *a,A. Moore b ( a Anglo-Australian Observatory, b Osservatorio Astrofisico di Arcetri) Starbug – enabling the smart focal plane TECHNICAL CHALLENGES.
Michigan/MIKE Fiber System (MMFS) – Update Apr 2005.
This page is intentionally blank. A new view of the Universe VIII Fred Watson (and the RAVErs) April 2005 A new view of the Universe VIII Fred Watson.
Peter Gillingham, Stan Miziarski, and Urs Klauser (Anglo-Australian Observatory) Figure 1 View of OzPoz showing the front of the focal late in observig.
Transmittance Measurement Presented by Dr. Richard Young VP of Marketing & Science Optronic Laboratories, Inc.
Earth Sun Star 2. Careful measurement of a celestial object’s position in the sky (astrometry) may be used to determine its distance Define the terms parallax,
Magnetic Fields Near the Young Stellar Object IRAS M. J Claussen (NRAO), A. P. Sarma (E. Kentucky Univ), H.A. Wootten (NRAO), K. B. Marvel (AAS),
Sept  Purpose  Requirements and Scientific Method  Important Dates  Common concerns  Research Paper  Questions.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
INTEGRAL FIELD SPECTROSCOPY AT THE VLT STAR (CLUSTER) FORMATION IN 3D : INTEGRAL FIELD SPECTROSCOPY AT THE VLT Markus Kissler-Patig (Instrument Scientist.
Chapter 1 Charting the Heavens.
INSTRUMENTATION/ OID / L. Pasquini/ 1 ____________________________________________________________ FLAMES COORDINATION AND INTERFACES. FIELD CORRECTOR.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Figure 8.Color map of the geometric correction along the dispersion axis for segment A. Figure 4. Measured distortions for all PSA positions for segment.
The 6dF Galaxy Survey Design and Goals Matthew Colless The 6dFGS Workshop AAO, Sydney, May 2002.
The rings of Saturn as observed by the robotic Cassini spacecraft looking back toward the eclipsed Sun. Saturn's E ring is created by the newly discovered.
The FMOS Facility for the SUBARU telescope Gavin Dalton Oxford/RAL.
4-PARAMETER TRANSFORMATION OF DIGITIZED ASTRONOMICAL IMAGES Yavor Chapanov 1 1 – National Institute of Geophysics, Geodesy and Geography, Bulgarian Academy.
Spatial Distribution of Atom Velocities in the Mercury Sodium Tail - Observation at Haleakala in June H. Fukazawa, M. Kagitani, S. Okano H. Fukazawa,
Telescopes. Light Hitting a Telescope Mirror huge mirror near a star * * * small mirror far from 2 stars In the second case (reality), light rays from.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Multiobject Spectroscopy: Preparing and performing Michael Balogh University of Durham.
A Search For New Planets Matthew Livas Science, Discovery, and the Universe Computer Science Introduction My capstone was to observe.
The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
On the Evaluation of Optical Performace of Observing Instruments Y. Suematsu (National Astronomical Observatory of Japan) ABSTRACT: It is useful to represent.
1 John Nousek & David Burrows (Penn State University) Alberto Moretti (Osservatorio Astronomico di Brera) X-Ray Telescope (XRT): Performance after Five.
Why is the VLT very efficient? Fernando Comerón On behalf of Francesca Primas and Martino Romaniello.
GTR-EVS TF-6 SOC – OICA Discussion Paper Jan 21 st, OICA Discussion Paper for TF-Mtg1 EVSTF-06-32e.
EXPLORE/OC: Photometry Results for the Open Cluster NGC 2660 K. von Braun (Carnegie/DTM), B. L. Lee (Toronto), S. Seager (Carnegie/DTM), H. K. C. Yee (Toronto),
PFS setup timing model Peter Mao. WARNING This is a toy model. It is intended to promote discussion of PFI setup time trades. Assume that all parameters.
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
MOTIONS OF SKY. Goals To identify the different parts of the celestial sphere model To understand how to express the location of objects in the sky To.
GSPC -II Program GOAL: extend GSPC-I photometry to B = V ˜ 20 add R band to calibrate red second-epoch surveys HOW: take B,V,R CCD exposures centered at.
Variability of a Sample of Potential meerKAT/SKA Calibrators Faith Hungwe – RU/HartRAO Advisers: R.Ojha – United States Naval Observatory (USNO)‏ (Alan.
1 GREAT spectrograph and plugplate discussion Ian Parry Institute of Astronomy Cambridge University UK.
ALMA ANTENNA KEY SPECIFICATIONS
Eduardo Manuel Alvarez Observatorio los Algarrobos, Salto, Uruguay
ESO: Applications to the ESO Imaging Survey and to the VLT
FLAMES – an overview Features & points to be aware of, relevant to the observer. In addition to p2pp, there is FPOSS. Layout of FLAMES; link to GIRAFFE.
Texas Tech University Department of Physics and Astronomy
Echidna: current status and expected performance
Presentation transcript:

Introduction. OzPoz is the fiber positioner for FLAMES, a multi-object spectroscopic facility on the VLT. It can feed light from as many as 140 objects within a 25 arcmin diameter field to two spectrographs. OzPoz was designed and built by the Anglo-Australian Observatory (AAO) under contract with ESO and commissioned during Science verification observations were made successfully in Jan./Feb and regular observing began following that. The only subsequent attention by the AAO has been a 10 day visit by one of the authors in Nov OzPoz mechanical design features and the performance achieved part-way through commissioning were described in previous SPIE proceedings. This paper deals with the performance in regular observational use since Feb Peter Gillingham 1 *, Jonathan Stoker 2, Matthew Colless 1, Andreas Kaufer 2 Operational performance of OzPoz the multi-fiber positioner on the VLT The bars show the hours allocated for observing using OzPoz. Times lost to OzPoz problems are colored red The gripper about to lift a parked button Reliability. In the OzPoz design, priority was given to attaining high reliability with minimal need for maintenance. The robot and gripper motions are constrained by air bearings which will maintain accuracy through a long wear-free life. The exchanger structure and its drives were designed conservatively with careful regard to earthquake safety. The operational record thus far has been very satisfactory, as indicated by the small percentage of observing time lost. From early Dec to Apr. ‘04, over button placements were made with no problems. A typical array of fibers on a (spherically curved) field plate. gripper collet CCD enclosure IFU bundle single fibers plate center fiber retractors The robot positioned below a plate ready for engagement. kinematic locators With 20 min set as the minimum exposure time, re-configurations are always done by the time an exposure is completed on the other plate. Logging initial placement errors of particular buttons gives a useful indication of those that may require cleaning or other attention. The plot below identifies three buttons that require iteration in placement much more often than is typical. error (  m) fiber number on plate 1 Record for ~16000 button placements. Error on first placement v fiber no. Errors in first placement of buttons in a full configuration. Those outside inner circle were placed a second time. Re-configuration speed. The mean time to reposition a button is 5.5 sec. This includes an allowance for occasionally placing a second time if the button is not within 40  m of the intended position (0.07 arcsec on the sky). The plot on the left shows a typical distribution of first placements, with a few requiring correction. An additional allowance of ~15% is needed to allow for buttons that have to be moved twice during a re-configuration. This is needed to uncross fibers. With all factors included, the mean time needed per button for a full re- configuration is 6.3 sec. 1 arcsec Accuracy of alignment on celestial targets. The placement accuracy discussed so far refers to how well buttons are placed in relation to where the robot believes they should be. Errors in modeling the robot geometry and atmospheric refraction, etc. could lead to fibers not collecting light efficiently from the intended targets. With collection diameters for single fibers ~1.2 arcsec, the required accuracy is high – the specification was < 0.15 arcsec radial error. Demonstrating full compliance was difficult; the figure to the right shows apparent angular errors from a test during the commissioning year – it gave an rms of 0.15 arcsec. This was short of the aim but included errors from the test method and from the astrometry of the target stars. In scientific use there have been no concerns about alignment accuracy. Sky subtraction. Sky subtraction can rely on accurate knowledge of the relative transmission of all fibers, including those allocated to sky measurement. The routine method for calibrating relative spectral transmission of fibers is to feed each of the fibers with a nominally identical exposure from a projector carried on the robot and swept several times over the fiber buttons arrayed in a spiral as indicated to the right. Calibration consistency of ~0.3% rms has been demonstrated. 1 Anglo-Australian Observatory 2 European Southern Observatory * Plot of error vectors derived from raster scanning of telescope indication of how fibers are calibrated for relative transmission by spiral scan of robot carrying a projector start of sweep reverse here Illustration of spiral scan used to calibrate fiber transmission R error (µm)  error (µm)