Mountain Associates Reform of capital expenditure regulation Bruce Mountain Mountain Associates.

Slides:



Advertisements
Similar presentations
Cost-effective internalisation and international competitiveness External costs of energy and their internalisation in Europe Brussels - Friday, 9 December.
Advertisements

Why is cost oriented pricing important Consumer Access to Services Efficient Network Access for Competitors and Service Providers Sustainable Market Expansion.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
Investment Decision-making. Content Investment Issues with investment appraisal Investment appraisal techniques: –Payback –Average Rate of Return (ARR)
New Investment John Howarth Executive Manager Energy Infrastructure VENCorp 2 April 2004 Conference on ACCC Draft Statement of Principles for the Regulation.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Electricity Interconnectors in GB
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
BSAD 221 Introductory Financial Accounting Donna Gunn, CA.
Entrepreneurship 6 Financial Resources for New Ventures: How to Get Them, How to Keep Them.
ITS Biennal Conference September 4-7, 2004 Berlin 1 Power and discretion in independent regulation. The Portuguese case. João Confraria School of Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Process of Developing Project Cash Flows Lecture No.38 Chapter 10 Contemporary Engineering Economics.
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
Incentive Mechanisms NARUC Staff Subcommittee on Accounting and Finance Portland, Oregon September 8-12, 2013 Presented By Bill Steele Bill Steele and.
1 Draft Statement of Regulatory Principles Consultation ‘Fostering a Stable Investment Environment’ Philip Gall, Manager/Regulatory Affairs TransGrid March.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Accounting and Reporting on an Accrual Accounting Basis By: Associate Professor Dr. GholamReza Zandi
ACCC Forum on Draft Statement of Principles for Transmission Regulation – New Investment Roman Domanski Executive Director Energy Users Association of.
Determining and Setting Public Utility Rates Bill Wilks, Senior Project Manager November 19, 2014 AGFOA Fall Conference.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
DATE: 21 August 2012 Determining the Regulatory Asset Base Anthony Felet – Regulatory Finance Specialist 1.
Slide 2.1 Accounting and Reporting on an Accrual Accounting Basis Chapter 2.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. Performance Evaluation Chapter 10 1.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
ITIL Financial Analysis. Contents Service-focused analysis Customer profitability Asset valuation Actual vs. planned spending Funding options Post-Program.
1 ElectraNet SA Draft Regulatory Principles Workshop Asset Base ( Strengthening Incentives for Investment) 2 April 2004 Draft Regulatory Principles Workshop.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
1 Chapter 6: Revenue Analysis. 2 Revenue Recognition Criteria Both the criteria should be satisfied: Good and service has been delivered Cash is collected.
Analyzing Financial Statements
SAPN’s proposal: initial comments Bruce Mountain.
What is this course about?
T4.1 H&N, Ch. 4 Chapter Outline 4.1CONTRACTING COSTS OF RISK POOLING ARRANGEMENTS Types of Contracting Costs Ex Ante Premium Payments vs. Ex Post Assessments.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Chapter 11 Contingency. Contingent 1.concept: past transactions or events of a situation, the results by the occurrence of uncertain future events occur.
1 ACCC Workshop on the DRP Incentive Mechanisms and Benchmarking.
1 RORB Return on Rate Base. Legal Basis  Section 43, (f) of Republic Act No Section 43. Functions of the ERC – x x x (a) x x x (f) x x x “The rates.
The Duke Save-A-Watt Proposal: An Economist’s Look James A. Polito, Ph.D. Director, Economic and Regulatory Analysis Indiana Office of Utility Consumer.
Discussion on Multi Year Tariff By Vivek Sharma & Manisha Kabra.
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Capex Regulation in Australian NEM NZ Commerce Commission workshop – March 2010.
1 Chapter 1. Engineering Economic Decisions. 2 Engineering Economics: Economic analysis for engineering and management decision making The term engineering.
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
This document contains certain forward looking statements with respect to the Group’s financial condition, results of operations and business, and our.
Business Intelligence Energy, Resources and Utilities.
Ofwat – Protecting consumers, promoting value and safeguarding the future Water and Regulation Improving the value from statistics Gordon Allan Engineering.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Revenue from Contracts with Customers
Energy Regulation – NZCID Meeting Commerce Commission
Details of demand management options
Proposed capital expenditure Categories
What is this course about?
Cired Alpha Session 6 Special Report Question 3
Engineering Economic Decisions
Providing Incentives for Regulated Infrastructure Companies to Deliver Investment Ian Alexander November 8th, 2005 International Consulting Economists’
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Costing and Finance P R Upadhyay.
What is this course about?
Safety-net facility.
Production and Operations Management
The Role of Private Sector in Capital Budgeting
Capacity Planning For Products and Services
Presentation transcript:

Mountain Associates Reform of capital expenditure regulation Bruce Mountain Mountain Associates

Content Review of the current capex regulatory contract –Description –Incentive properties –Administrative requirements Is there a better way - how could we think about this? The ACCC’s suggested “ex-ante cap” approach: description, questions & answers

Mountain Associates Current regulatory contract: Description Commission’s Code obligations: –Economic incentives for efficient investment. Commission’s Draft Regulatory Principles –Step 1: Determine capex forecast and set revenue cap accordingly. Capex forecast is only “ball-park” estimate of “efficient” investment; –Step 2: Assess prudency of actual expenditure at end of regulatory period based on “good industry practice”. Roll-in “efficient” investment into RAB. “Ex-post” optimisation

Mountain Associates Current regulatory contract: Incentive properties But will threat of ex-post optimisation cause TNSPs to invest efficiently … –what if optimisation threat isn’t credible – would TNSPs still invest efficiently? –what if optimisation threat is credible – surely TNSPs would seek regulatory consent before undertaking major investments? (In which case, is an ex-post regime sustainable?)

Mountain Associates Current regulatory contract: Incentive properties Also, does existing regime only offer a stick (i.e. no carrot) to TNSPs: –if actual capex < forecast capex: risk that regulator will take away part of the “underspend”; –if actual capex > forecast capex: risk that regulator will make them absorb part of the “overspend”.

Mountain Associates Current regulatory contract: Administrative requirements What needs to be done to assess the prudency of past investments? –Assess whether bona fide need for investment; –Assess whether most efficient project chosen; –Assess whether most efficient project delivered. The assessment must only take account of what the TNSP knew (or should have known) at the time it invested.

Mountain Associates What does this mean in practice? –From 1999 to 2004, TransGrid invested in more than 60 separate transmission augmentation projects and hundreds more replacement, IT, and “support the business” projects. Each project should be assessed. –Prudency judgements requires that regulator can credibly “second guess” TNSP decisions. This means capability in transmission planning & engineering; environmental and local planning regulations; the ability to judge what corporate entities could be expected to achieve etc. Current regulatory contract: Administrative requirements Ex-post assessments are inevitably highly intrusive, subjective, time consuming (for both regulator and TNSP) and expensive.

Mountain Associates Developing and evaluating alternative regulatory contracts: variables for consideration –Ex-ante vs ex-post –Project-specific vs basket –Variable price vs fixed price

Mountain Associates A range of possible capex regulatory contracts “Fixed price” contract “Variable price” contract Basket of projects Individual projects VENCorp US Public Utility Commissions (PUCs) Ofgem UK DTe Holland NVE Norway Ofgem Ofwat VENCorp

Mountain Associates Evaluating alternative regulatory contracts Administrative requirements Strength of efficiency incentive Uncertainty – regulatory risk Intrusiveness Predictability Impact on service standards & reliability Decision variables Regulatory failure Information asymmetry

Mountain Associates The ACCC’s suggested direction for capex regulatory contract “Fixed price” contract “Variable price” contract Basket of projects Individual projects VENCorp US Public Utility Commissions (PUCs) Ofgem UK DTe Holland NVE Norway Ofgem Ofwat VENCorp ACCC’s current suggestion

Mountain Associates What’s the difference between the ACCC’s current suggestion and the existing regulatory contract? Existing regulatory contractACCC suggestion on possible regulatory contract When prudency is assessed Ex-postEx-ante Basis for determination of amount to be rolled- into RAB Ex-post prudency assessmentBased on actual spending (subject to cap) except for projects excluded from cap Extent of project-specific prudency assessment All projects meant to be individually assessed Limited - TNSPs free to allocate expenditure under cap (except for projects explicitly excluded from cap) Nature of efficiency incentive Threat of ex-post optimisationCap provides upper limit on spending. Incentive to spend efficiently under the cap depends on service incentives and planning standards IntrusivenessPotentially highly intrusive if rigorously implemented Intrusive assessment generally limited to projects excluded from the cap Administrative requirements Considerable if approach rigorously implemented Still significant but by comparison should be much lower

Mountain Associates Q&A on the Commission’s suggested direction for reform What if demand much higher than expected - setting a fixed cap places reliability and service at risk? Conversely, if the cap too high, TNSPs profit at expense of customers? Why is suggested arrangement less intrusive than the existing arrangement – both require assessment of efficiency?

Mountain Associates New arrangement provides no incentive for efficiency – why not simply investing in all the “marginal” projects first and then simply come back to ACCC for more money? Existing ex-post approach provides stronger customer protection because the ACCC retains the power to optimise? Q&A on the Commission’s suggested direction for reform

Mountain Associates Project-specific approach means the Commission can apply stronger efficiency incentive than it can with a “basket of projects” approach? Shouldn’t ACCC simply exclude all large and uncertain projects from “ex-ante cap” – this would allow a more accurate specification of the cap and greater protection for consumers? Q&A on the Commission’s suggested direction for reform

Mountain Associates The last word … “A regulator is supposed to take the punch bowl away before the party gets out of hand. The impact of its actions is blunted if it waits until the miscreants are numb with remorse before bursting into the room and issuing fire and brimstone denunciations.” Financial Review editorial on APRA’s report into the NAB.