Translation and Verification of ICCS instruments Summary of the Field Trial & Plans for the Main Study National Research Coordinators Meeting Windsor,

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Sigma assistance to public procurement reform
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
Data Management Seminar, 9-12th July 2007, Hamburg 1 Data Processing at the IEA DPC.
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
1 Revision of ISSAI 30 – Code of Ethics Project proposal to the Steering Committee of the INTOSAI Professional Standards Committee Bahrain, May 2014.
African Aviation Training Organization
Overview of field trial analysis procedures National Research Coordinators Meeting Windsor, June 2008.
Proposed Cognitive Test for the Main Study National Research Coordinators Meeting Windsor, June 2008.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S - Translation of Forms and Labels (PDF)
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
1 PROPOSAL FOR PROCEDURES AND SCOPE OF SHA DATA COLLECTION UNDER THE CO-OPERATION BETWEEN OECD, EUROSTAT AND WHO 7 th Meeting of Health Accounts Experts.
Labour Mobility Working Group of the Canadian Counselling and Psychotherapy Association HRSDCCCPA Survey Process.
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
 needs to be met  existing resources  content outline  contributor team  contract details  timeline.
National Adaptation Forms International Study Centre Data Management Seminar Hamburg, July 2008.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
1st NRC Meeting, October 2006, Amsterdam 1 Sampling: Next Steps.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
Data Management Seminar, 8-11th July 2008, Hamburg 1 Summary Common Sources of Error.
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – On-line Data Collection A General Introduction.
ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007.
REVIEW OF CMS “INITIAL APPROVAL” OF RHP PLAN AND FOLLOW-UP REQUIREMENTS May 8, 2013 REGION 10.
Report on UNSD activities since the last meeting of the Expert Group on International Economic and Social Classifications Meeting of the Expert Group on.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
Overview of ICCS field trial National Research Coordinators Meeting Windsor, June 2008.
Quality Control Program in ICCS Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Quality Standards in TIMSS and PIRLS The Basis for Valid and Reliable Data for Educational Decision Making Ina V.S. Mullis, Michael O. Martin, & Pierre.
HASSACC 2015 Human And Social Sciences at the Common Conference [please insert title of your paper here] October 5. –
3rd NRC Meeting, 9-12 June 2008, Windsor 1 Data Management Procedures Michael Jung, IEA Data Processing and Research Center.
National adaptations to main survey instruments and layout verification National Research Coordinators Meeting Windsor, June 2008.
Next Steps National Research Coordinators Meeting Madrid, February 2010.
Quality Assurance Program National Research Coordinators Meeting Amsterdam, October 2006.
ACCESS for ELLs ® 101 Annual Bilingual/ESL Meeting October 8, 2009.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
Data Management Seminar, 9-12th July 2007, Hamburg Data Entry Overview.
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
1st NRC Meeting, October 2006, Amsterdam 1 Data Management Procedures Preview of software used in ICCS Michael Jung, IEA Data Processing Center.
ICCS Main Survey Overview National Research Coordinators Meeting Madrid, February 2010.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 ICCS 2009 Main Survey Field Trial Results.
Data Management Seminar, 9-12th July 2007, Hamburg 1 ICCS 2009 – Field Trial Data Management Seminar Summary Day 3.
European Module Field Trial outcomes and Plans for Main Study National Research Coordinators Meeting Windsor, June 2008.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Study Overview National Research Coordinators Meeting Amsterdam, October
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
Student Background Questionnaire National Research Coordinators Meeting Amsterdam, October 2006.
INIS INPUT SUBMISSION. INIS Input Submission procedure how to submit bibliographic data PDFs to INIS Secure FTP server CD-ROM DVD October.
The development of the ICCS Encyclopaedia National Research Coordinators Meeting Madrid, February 2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Teacher Questionnaire National Research Coordinators Meeting Windsor, June 2008.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
Teacher Licensure PI-34 Wisconsin’s New Process. New License Stages  Initial Educator 5 year, non-renewable  Professional Educator 5 year renewable.
ICC Industry Advisory Committee Purpose and Scope The purpose of the Industry Advisory Committee (IAC) is to promote, in cooperation with the International.
African Aviation Training Organization
Revisions to Codes and Standards
Secretariat Matters INTOSAI Working Group on Environmental Auditing
ESøknad - A web-based system for the electronic submission of research funding applications A short presentation of the system intended for principal investigators/researchers.
Discussion group meeting
ESøknad - A web-based system for the electronic submission of research funding applications A short presentation of the system intended for principal investigators/researchers.
Data harmonization in International Surveys on Education
New Guides on social security where are we now?
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
Eurostat regional yearbook 2012 – new routines and time planning
NUTS Agenda: 5.1; Document 9
Laura Mihăilescu Translation Coordination Unit
European Statistical System Network on Culture (ESSnet Culture)
Presentation transcript:

Translation and Verification of ICCS instruments Summary of the Field Trial & Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008

NRC Meeting Windsor 9-12 June 2008 Content of presentation Field Trial - Scope of verification - Quality of translation/adaptations - Major problems and feedback from the NRCs Main Study - Process of preparation of the national instruments - Translation/adaptation procedures - External verification of the national instruments - Timeline

NRC Meeting Windsor 9-12 June 2008 FT: Scope of verification 34 educational systems participants: international and regional instruments - 12 participants: international instruments 22 languages - Most popular: Spanish (7) and English (4) 2 participants used two languages September- October 2007Time: September- October 2007

NRC Meeting Windsor 9-12 June 2008 FT: Quality of translation and/or adaptations  Overall very good quality! Primus Inter Pares: CHILE, ENGLAND, FINLAND

NRC Meeting Windsor 9-12 June 2008 FT: Typical errors Translation: mistranslations, “free translation” vs. “word for word” translation, inconsistencies, lack of harmonization between translators Cultural Adaptations: not always documented properly, use of English terminology Omissions/Additions Grammar: English syntax Punctuation Typos

NRC Meeting Windsor 9-12 June 2008 FT: Feedback from countries (TV Summary and SAQ) 16 participants completed TV Summary Form - 4 accepted all severity code “1” suggestions - 12 accepted some/partially of severity code “1” suggestions  6 participants reported in SAQ problems with translation and/or translation verification and/or documentation  Reported problems: - Translation/adaptation of some concepts and words (e.g. local community, school, council, school board, ombudsman, immigrants) - Problems with the Zedland, etc. - Updating NAFs - Verification and NAFs for instruments developed in English - Coordination between NAF – language – layout verification Other issues: - Using other country translation (7 countries)

NRC Meeting Windsor 9-12 June 2008 MS: Process of preparation of the national instruments The same process as in Field Trial: Step 1: National Center translates and/or adapts instruments Step 2: National Center reviews instruments and completes NAF Step 3: International Center reviews NAF Step 4: The IEA Secretariat conducts external verification of translation/adaptation Step 5: National Center corrects and assembles instruments Step 6: International Center conducts layout verification Step 7: National Center conducts final review and prints instruments The same team as in Field Trial: Translator  reviewer  NRC

NRC Meeting Windsor 9-12 June 2008 MS: Procedure of preparation of the national instruments Select items/questions which were changed after Field Trial. Retranslate them. Select and review carefully items/questions which remain unchanged after Field Trial. Correct/ improve them if necessary. Follow the same translation/adaptation formula as in Field Trial. Use Field Trial experiences. If your country participated in CIVED and you want to have overtime comparisons: do not change the trend items! Update NAFs on each stage of your work.

NRC Meeting Windsor 9-12 June 2008 MS: International verification of translation/adaptations Materials submitted to external verification: - translated\adapted instruments (international and regional)* - NAFs ( to be reviewed twice: by the International Center and by the international reviewer) Feedback in electronic form: - suggestions inserted in NAFs - proposed corrections, changes and comments (including severity codes) inserted in instruments Please use DPC FTP Server for uploading and downloading instruments! * Note: Please send test in blocks of items; do not send booklets!

NRC Meeting Windsor 9-12 June 2008 MS: International layout verification The same procedure as in Field Trial: - One copy of each instrument (translation verified and corrected) as PDF file - Updated NAFs - The ISC will review instruments and will send its comments to NRC

NRC Meeting Windsor 9-12 June 2008 MS: Finalization of the national instruments Final corrections to the instruments have to be introduced National Adaptation Forms have to be revised Final version of the instruments and National Adaptation Forms should be sent to ISC INSTRUMENTS CAN BE PRINTED!

NRC Meeting Windsor 9-12 June 2008 Timeline Translation verification opens: - For Southern Hemisphere: SEPTEMBER 1, For Northern Hemisphere: JANUARY 1, 2009 Verification of full set of instruments takes approximately two – four weeks, dependently on: - Quality of translation - “Appointment” for translation verification

NRC Meeting Windsor 9-12 June 2008 Questions and comments ?!!