D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,

Slides:



Advertisements
Similar presentations
INFN Milano, Universita` degli Studi Milano Bicocca Siena IPRD May Testbeam results of the CMS electromagnetic calorimeter Alessio Ghezzi.
Advertisements

1 ALICE Grid Status David Evans The University of Birmingham GridPP 14 th Collaboration Meeting Birmingham 6-7 Sept 2005.
B A B AR and the GRID Roger Barlow for Fergus Wilson GridPP 13 5 th July 2005, Durham.
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
PPRP September 2002 UK CMS 1 CMS Endcap Electromagnetic Calorimeter and Global Calorimeter Trigger, Physics & Computing Presented by Peter Hobson, Brunel.
US CMS Collaboration Meeting, May 19, Ren-yuan Zhu, Caltech PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
2002 LHC Days at Split, Split, October 2002 D J A Cockerill - RAL 1 The ECAL Endcap Calorimeter for CMS D J A Cockerill RAL - UK 2002 LHC Days at Split.
The Lead Tungstate Calorimeter for CMS
History x-y mechanics Needs mapping to r- trigger towers Optimised Any-5 Swiss cross Current.
CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
View from BEHIND backplate Notch View from BEHIND backplate 2x5 and 5x2 partial SCs SC assembly jig views.
STFC RAL EE at SLHC CERN 15/04/08 R M Brown - RAL 1 EE at SLHC What do we expect at SLHC? EE Layout VPT vulnerability to radiation - Faceplate darkening.
Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Crystals into Alveolar from BACK of assembly jig Face B Face A Interface plate Type 1 (0-TB H) Holes for Housing NOTCH Fibre optic.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
C. Seez Imperial College November 28th, 2002 ECAL testbeam Workshop 1 Offline software for ECAL test beam The pre-processing model The offline software.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Test-beam Results for the CMS Forward Pixel Detector Carsten Rott Daniela Bortoletto, Gino Bolla, Amitava Roy Purdue University 28 April 2001.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
How do we know the present in-line patch panel size (25 x 25 x 2.5 cm**3) will fit in the available space? ECAL Barrel In-line optical patch panel sketch.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
The Ring Imaging Cherenkov Detectors for LHCb Antonis Papanestis CCLRC – RAL On behalf of the LHCb RICH group.
2004 LHC DAYS IN SPLIT- October 8 th 2004 L. Dobrzynski - LLR CMS - ECAL Test beam results Ludwik Dobrzynski On behalf of ECAL CMS LLR- Ecole polytechnique.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
Overview Detector details Crystals Photo-detectors
CLAS12 Calibration and Commissioning (CALCOM)
CMS-ECAL Front-End monitoring Matteo Marone
CMS SLHC Calorimeter Trigger Upgrade,
Quick link: cern.ch/cmstb04
4x5 SC array for the test beam in Apr 2007
UK CMS Oversight Committee Mtg
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
PROGRESS on EE VPTs, Dees D Cockerill
Data Concentrator Card and Test System for the CMS ECAL Readout
Presentation transcript:

D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions, so highest E  ~ 100 GeV ChallengeTo use existing H4 infrastructure GoalGet maximum benefit for EE (and ES?)

D Cockerill, RAL, 8 June x5 SC array for the test beam in Nov 2006 Dee Calibration Nov 2006

D Cockerill, RAL, 8 June 2005 VPT sorting by SC position Old data Mean ~33 e/MeV now

D Cockerill, RAL, 8 June 2005 TT26  =1.57 TT19  =2.5 SC region on Dee Backplate angle as for beam from CMS I.P.

D Cockerill, RAL, 8 June 2005 ‘Any 5’ trigger map DCC boundary TCC boundary Appropriate any five trigger mapping

D Cockerill, RAL, 8 June 2005 Problem of OPAL frames Dee frame is an enormous device 3,6 tonnes in weight Will exceed EB turntable weight limit Use it only to transfer Dee to H4, if at all Dee backplate ~ 1.9 tonne with crystals Mount Dee on plinth on the H4 turntable Dee backplate angled to beam with appropriate support struts Need FEA to check Dee rigidity

D Cockerill, RAL, 8 June 2005 This part of Dee empty, No weight Beam Avoid pivot support Avoid vertical movement screw Special H4 environmental screen Dee on H4 turntable

D Cockerill, RAL, 8 June 2005 Benefits of the proposed siting of Dee on turntable Vertical rotation - in 2004, SCs moved in an arc – difficult to follow scheme SCs move ~vertically - unfortunately radius of rotation only ~ 1m Horizontal rotation - in 2004 adjacent SCs were not horizontal after rotations in the vertical scheme, a better x-y grid of xtal positions for data taking/analysis H4 turntable constraints

D Cockerill, RAL, 8 June 2005 Readout needed for 20 SCs 100 trigger GOH 20 data GOH Short fanouts on Dee FE – DCC20 optical lines= 2 short fanouts (24 lines) FE – TCC100 optical lines= 9 short fanouts (108 lines) MEM 24 optical lines= 2 short fanouts Totals144 optical lines 13+1 = 14 short fanouts MPO trunk cables from Dee to H4 CR (barrel had MFS trunk cables at SM10 end) 2 trunk cables2*96 = 192 lines +1 trunk cable for CCS/token rings/MEM Dee patch panel MPO H4 control room Short fanouttrunk cable

D Cockerill, RAL, 8 June 2005 UK opportunities Monte Carlo appraisalComparison – testbeam to Monte Carlo Identify particular regions needing close study Use current geometry in OSCAR or update to XML? Way in to EE/ES reconstruction algorithms – urgently needed – no one doing this! Assembly of 20 SCsVPT database Bare SC assembly Pre-production HV cards Pre-production umbilicals Trigger mapping and checking HV systemFinal HV system + fanout HV box All software drivers completed VPT stability LEDsAt least one system required EE test beam/analysisOpportunities for the UK to take leading roles………

D Cockerill, RAL, 8 June 2005 Additional info

D Cockerill, RAL, 8 June 2005 Noise across Dee Transverse noise across Dee, VPTs sorted E T from 30 – 60 MeV (old normalisation)