Reporting of the Experiments Follow procedures set up for technical WP of EDG Spreadsheet report man month effort Pro-forma reply sheet Pro-forma sheet.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC GridPP2: Data and Storage Management.
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
Stephen Burke - WP8 Status - 14/2/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
Pete Clarke– GridPP 6 – 31 Jan n° 1 EGEE EGEE - The Network Sector.
1Oxford eSc – 1 st July03 GridPP2: Application Requirement & Developments Nick Brook University of Bristol ALICE Hardware Projections Applications Programme.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
SAM £17m 3-Year Project I: £2.49m £1.2m Experiment Objectives H*: 5.4% H: 3.2% Software Support G: Prototype Grid 9.7% F* 1.5% F 1.9% CERN J 2.6% E.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
16 th Oct’02Nick Brook – University of Bristol1 News Nick Brook University of Bristol PMB News Feedback from “review” LCG News.
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
GridPP News NeSC opening “Media” dissemination Tier 1/A hardware Web pages Collaboration meetings Nick Brook University of Bristol.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
EU 2nd Year Review – Jan – Title – n° 1 WP1 Speaker name (Speaker function and WP ) Presentation address e.g.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
K. Harrison CERN, 15th May 2003 GANGA: GAUDI/ATHENA AND GRID ALLIANCE - Development strategy - Ganga prototype - Release plans - Conclusions.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ATLAS-Specific Activity in GridPP EDG Integration LCG Integration Metadata.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
K.Harrison CERN, 21st November 2002 GANGA: GAUDI/ATHENA AND GRID ALLIANCE - Background and scope - Project organisation - Technology survey - Design -
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
CHEP – Mumbai, February 2006 The LCG Service Challenges Focus on SC3 Re-run; Outlook for 2006 Jamie Shiers, LCG Service Manager.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
Nick Brook Current status Future Collaboration Plans Future UK plans.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Organisation Management and Policy Group (MPG): Responsible for setting and policy decisions and resolving any issues concerning fractional usage, acceptable.
DOSAR Workshop, Sao Paulo, Brazil, September 16-17, 2005 LCG Tier 2 and DOSAR Pat Skubic OU.
Grid Workload Management Massimo Sgaravatto INFN Padova.
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
GridPP3 Project Management GridPP20 Sarah Pearce 11 March 2008.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
GridPP Collaboration meeting Manchester 9/10 May 2002 P.Clarke Resource Management: Instruments and Procedures Testbed Rollout: Development of Plan Education.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
09/02 ID099-1 September 9, 2002Grid Technology Panel Patrick Dreher Technical Panel Discussion: Progress in Developing a Web Services Data Analysis Grid.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
The Experiments – progress and status Roger Barlow GridPP7 Oxford 2 nd July 2003.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
ATLAS is a general-purpose particle physics experiment which will study topics including the origin of mass, the processes that allowed an excess of matter.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
K. Harrison CERN, 3rd March 2004 GANGA CONTRIBUTIONS TO ADA RELEASE IN MAY - Outline of Ganga project - Python support for AJDL - LCG analysis service.
ATLAS-specific functionality in Ganga - Requirements for distributed analysis - ATLAS considerations - DIAL submission from Ganga - Graphical interfaces.
LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.
K. Harrison BNL, 29th August 2003 THE GANGA PROJECT -Project objectives and organisation - Ganga design - Current status of software - Conclusions.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Seven things you should know about Ganga K. Harrison (University of Cambridge) Distributed Analysis Tutorial ATLAS Software & Computing Workshop, CERN,
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
Moving the LHCb Monte Carlo production system to the GRID
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
D. Galli, U. Marconi, V. Vagnoni INFN Bologna N. Brook Bristol
Short to middle term GRID deployment plan for LHCb
Presentation transcript:

Reporting of the Experiments Follow procedures set up for technical WP of EDG Spreadsheet report man month effort Pro-forma reply sheet Pro-forma sheet slight change in emphasis from EDG Pete to approach expt & re-assess deliverable & dependencies Dry run with LHCb Introduce report back procedure about behaviour & experiences of: Middleware Tier centres Introduce reqts on expt in the next 3 months of the: Middleware Tier centres

Man effort useful to keep track of contribution to project outside of GridPP funding regime

Pro-forma reporting For Section 1: “Technical achievement ” Please summarise below all work done by “GridPP” staff during this quarter. Also describe any “ issues” which have arisen. C Cioffi: Attended GAUDI course. Installed and familiarised himself with the GAUDI s/w framework. Attended LHCb s/w week. Discussion on design /use requirements for addressing physical/logical filename services with N Brook(Bristol) & M Frank(CERN) A Soroko: Attended GAUDI course. Familiarised himself with Gaudi framework. Attended LHCb s/w week. Started work on requirements for GANGA and review of existing technologies. K Harrison: Started work on requirements for GANGA and review of existing technologies.

Pro-forma reporting For Section 2: “Status of deliverables and milestones” Describe the status of the deliverable for which GridPP post(s) is responsible, at a level of detail appropriate to closeness of delivery date. Also provide the schedule information in the table Deliverable name Actual deliver- able PlanTargetActual Persistency servicesReqt docsEnd of May GANGAReqt docsEnd of March End of June The delivery of requirements document on persistency services is on schedule. The GANGA requirements documents have slipped due to the fact that A Soroko began March 1 st and K Harrison began March 10 th.

Pro-forma reporting For Section 2: “Status of deliverables and milestones” Describe any changes in the deliverables In addition to the production of requirements document, after a joint meeting between ATLAS & LHCb (CERN – March 7 th 2002) it was felt necessary to also perform a technology review (i.e. existing tools being used by ATLAS & LHCb in distributed computing)

Pro-forma reporting For Section 3: “Achievements” Describe any tangible which falls under the following headings: Conference/workshop organised Conference talks Submission of papers Release of Software Package/Tools

Inter-Dependencies LHCb/ATLAS GANGA/Gaudi Project The following milestones are scheduled for this project for the 1 st 12 months. Listed in italic in brackets are the dependencies on EDG software/work packages. 3 months, March 2002: Study and determine the analysis environment Study the procedures for MC production Write detailed requirements, architecture and design Technology review 6 months, June 2002: First prototype modelled on current Atlas and LHCb production tools, using DataGrid job submission (WP1 tools - already exist) data move (replica) and (WP2 tools due end March’02 + TestBed2 release) catalogue services. (WP2 tools due end March’02 + TestBed2 release) Design Ganga GUI (Html page). Remote mass storage write capability (Dependent on remote RFIO from WP5)

Inter-Dependencies LHCb/ATLAS GANGA/Gaudi Project The following milestones are scheduled for this project for the 1 st 12 months. Listed in italic in brackets are the dependencies on EDG software/work packages. 3 months, March 2002: Study and determine the analysis environment Study the procedures for MC production Write detailed requirements, architecture and design Technology review 6 months, June 2002: First prototype modelled on current Atlas and LHCb production tools, using DataGrid job submission (WP1 tools - already exist) data move (replica) and (WP2 tools due end March’02 + TestBed2 release) catalogue services. (WP2 tools due end March’02 + TestBed2 release) Invent syntax of generic script, and write a program that creates scripts from it. Make scripts crash proof. Design Ganga GUI (Html page). Remote mass storage write capability (Dependent on remote RFIO from WP5)

Expt Feedback Mechanism Computing Element Performance: Tier1/A Tier2 Storage Element Performance: Disk Mass storage Network Response: Reliability Bandwidth Functionality of middleware: Scheduling Data Management Monitoring Services Mass storage Network & services Applications s/w: S/w framework (eg GAUDI, SAM,…) Expt specific tools Report back on experiences and planning for next 3 months

Procedures 1.Data collation (and chasing) - Nick 2.Data interpretation – Nick & Roger [~2 weeks before EB meeting] 3.Data processing  EB report. EB & TB will meet on same day. (Parallel meetings in morning joint session in afternoon) - Nick & Roger & others 4.Feedback [long-term & annual] Nick & Roger & Pete &Tony