Presentation for the NMI January 23rd 2009 John Coughlan Data Acquisition Systems for Big Science Dr John Coughlan STFC Rutherford Appleton Laboratory.

Slides:



Advertisements
Similar presentations
Assembly and Packaging TWG
Advertisements

S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, MANNHEIM 02 July 2009 Martin Postranecky, Matt Warren, Matthew Wing.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory LCFI Status Report: Sensors for the ILC Konstantin Stefanov CCLRC Rutherford Appleton Laboratory.
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
By Sunil G. Kulkarni, SO/F, Pelletron-Linac Facility, BARC-TIFR. 21/01/2011 ASET.
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Introduction to Programmable Logic John Coughlan RAL Technology Department Electronics Division.
John Coughlan et al.Rutherford Appleton Laboratory14th May 20023rd CMS Electronics Week Tracker Front-End Driver Progress Report 3rd CMS Electronics Week.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Questionnaire Response
Tracker Strip and Pixel FEDs John Coughlan Tracker Readout Upgrade Meeting September 12 th 2007.
1 JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
Cryogenic Technology from STFC Cryox Ltd was formed in 2007 to provide a commercial face for cryogenic technology from the three main.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
The TrainBuilder ATCA Data Acquisition Board for the European XFEL The TrainBuilder ATCA Data Acquisition Board for the European-XFEL John Coughlan, Chris.
The Train Builder Data Acquisition System for the European-XFEL John Coughlan, Chris Day, Senerath Galagedera and Rob Halsall STFC Rutherford Appleton.
XFEL Large Pixel Detector DAQ. Project Team Technical Team: STFC Rutherford DAQ Glasgow University Surrey University Science Team: UCL Daresbury Bath.
Introduction to Programmable Logic Devices and FPGAs Edward Freeman STFC Technology Department Detector & Electronics Division.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Data Acquisition Card for the Large Pixel Detector at the European XFEL 1 Tuesday 28 th September 2011, TWEPP Vienna Presented by John Coughlan STFC Rutherford.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
Introduction to Programmable Logic Devices John Coughlan STFC Technology Department Detector & Electronics Division.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
NI Big Physics Summit CERN
Evaluation of Emerging Parallel Optical Link Technology for High Energy Physics John Chramowicz, Simon Kwan, Alan Prosser, Melissa Winchell Fermi National.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Introduction to Field Programmable Gate Arrays (FPGAs) EDL Spring 2016 Johns Hopkins University Electrical and Computer Engineering March 2, 2016.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
EXtreme Data Workshop Readout Technologies Rob Halsall The Cosener’s House 18 April 2012.
Digital Acquisition: State of the Art and future prospects
Counting Room Electronics for the PANDA MVD
Introduction to Programmable Logic Devices
Large Area Endplate Prototype for the LC TPC
The Train Builder Data Acquisition System for the European-XFEL
Large Pixel Detector LPD John Coughlan STFC Rutherford Appleton Laboratory on behalf of LPD collaboration.
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
SVT detector electronics
Presentation transcript:

Presentation for the NMI January 23rd 2009 John Coughlan Data Acquisition Systems for Big Science Dr John Coughlan STFC Rutherford Appleton Laboratory

Presentation for the NMI January 23rd 2009 John Coughlan Talk Outline STFC Technology, Who we are Data Acquisition for Big Science, CERN LHC LHC-CMS Data Acquisition boards. Next generation systems

Presentation for the NMI January 23rd 2009 John Coughlan STFC Science and Technology Facilities Council, STFC Largest of 7 UK Scientific Research Councils reporting to DIUS 2,000 scientists & engineers at main site Rutherford Appleton Laboratory STFC, Rutherford Appleton Laboratory, Oxfordshire UK

Presentation for the NMI January 23rd 2009 John Coughlan STFC Space Science, Lasers, X-Ray and Neutron sources, Particle Physics +… Operate several world-class large-scale research facilities on site, e.g. VULCAN Laser, ISIS Neutron source, Diamond X-Ray Light Source. UK Hub supporting activities of University researchers on other international facilities, e.g. ESA, CERN Geneva STFC, Rutherford Appleton Laboratory, Oxfordshire UK

Presentation for the NMI January 23rd 2009 John Coughlan Major Site Developments Harwell Science and Innovation Campus… New Detector Systems centre 2010/11 Agreement for new ESA research centre STFC, Rutherford Appleton Laboratory, Oxfordshire UK

Presentation for the NMI January 23rd 2009 John Coughlan STFC Technology STFC Technology Department 300 Electronic & Mechanical Engineers with strong Scientific Expertise Developing Instrumentation for Large Scale Science Experiments Telescopes to Medical Imaging, Micro MEMS to Major engineering structures, Novel sensors to Cryogenic Superconducting Magnets, Electronics and Microelectronics… Europe wide Microelectronics design support. EUROPRACTICE.

Presentation for the NMI January 23rd 2009 John Coughlan STFC Technology Electronics PCB Board and System Design FPGA Design. (Xilinx and Altera) Embedded systems. Board and System Test and System Integration Microelectronics, ASICs, MAPS sensors Current generation of Large Scale Projects for CERN completed, LHC New projects starting R&D phase, European Free Electron Laser XFEL

Presentation for the NMI January 23rd 2009 John Coughlan CERN European Laboratory for Particle Physics. Geneva Large Hadron Collider LHC Understanding the Origin of the Universe Started Operation (briefly!) in No Black Holes yet… Big Science

Presentation for the NMI January 23rd 2009 John Coughlan CMS Experiment at LHC 12,000 tons apparatus ~ 50 million electronic readout channels DAQ rate ~ 100 kHz 2,500 Scientists & Engineers in collaboration

Presentation for the NMI January 23rd 2009 John Coughlan CMS Installation 200 metres Underground STFC Microelectronics 80,000 x Analogue Pipeline ASICs Extremely Radiation Hard VME Racks Water Cooled

Presentation for the NMI January 23rd 2009 John Coughlan One Collision 40 Million Collisions every second. Keep images from 100,000 collisions every second. Each image built up from 10 million analogue sensors. Rarest new particles HIGGs ~ few dozen per year? Need for Massively Parallel (FPGA) based Processing ~ 1 TERA-Bytes / sec LHC Data Acquisition

Presentation for the NMI January 23rd 2009 John Coughlan LHC-CMS Data Acquisition Custom COTS

Presentation for the NMI January 23rd 2009 John Coughlan LHC DAQ Requirements Performance driven by science & experiments. Large channel counts. Large Form Factor PCBs High bandwidths. Custom data protocols. Specific Functions with Flexibility unknown science. FPGAs Electronics developed in collaboration with scientists. Large communities. In parallel with detector development. Loose specifications. Fully custom systems where performance and cost justify design investment Long development cycles. Long operating times Years Larger systems. Designs frozen early. Minimise risk.

Presentation for the NMI January 23rd 2009 John Coughlan LHC-CMS DAQ Board Board Features –9U x 440 mm (VME mechanics) –Optical Inputs, Analogue –96 ADC Channels MHz –10 x XC2V2000 –24 x XC2V40 –14 Layers –Double sided PCB System has –500 boards (large nr for PP) –24 Crates –8 Racks –50 KW Delivered to CERN 2006 Data In ~ 3 GByte/s. Data Out ~ 200 MByte/s

Presentation for the NMI January 23rd 2009 John Coughlan LHC-CMS DAQ Board Development Large boards. 9U VME Mechanics. High I/O count Analogue & Digital Large nr FPGA BGAs. 676 pins 1 mm pitch Concerns for BGA assembly Design for Test. Boundary Scan Design started in Prototypes (25 off) in 2003/4 before production (500 off) in 2005/6. FPGA Virtex II. Fix technology early. DCMs for channel synchronisation DCI useful but power hungry Double Data Rate I/O

Presentation for the NMI January 23rd 2009 John Coughlan Board parameters: - 9U x 440 mm VME64x form factor - Optical/Analogue/Digital logic ; MHz channels - 14 layers (incl. 6 power). FR4. - Double-sided (secondary side with half of analogue components) - 6,500 components (most passives are 0402). Surface mount - ENIG metal finish, for BGAs. Pb/Sn - 20,000 connections ; 14,000 vias micron tracking, some 75 micron diff imp, min gap 100 micron, - 37 BGAs (larger FPGA 676 pins on 1mm pitch). All BGAs located on primary side. - Controlled impedance - Boundary Scan JTAG all Digital devices 440 FED boards required for full CMS Tracker readout Analogue components repeated on 2 nd side LHC-CMS DAQ Board Specs

Presentation for the NMI January 23rd 2009 John Coughlan FPGA Assembly on PCBs  3 rd Batch Prototypes 2003 ALL 6 failed Boundary Scan on several BGAs. Shorts under BGAs. Rework failed too. 17,000 BGAs in system EU Tender process for PCB & Assembly. Exception Ltd 1 out of 500 production boards failed Tests 2006

Presentation for the NMI January 23rd 2009 John Coughlan LHC CMS CERN Industry Awards Gold Award : Exception Ltd New Electronics Cover Story

Presentation for the NMI January 23rd 2009 John Coughlan Other LHC-DAQ Boards FPGA nm generation 1 Gbps serial data. DDR2 VME Form Factors Conventional PCB manufacture. Step change design required for Next Generation of Projects

Presentation for the NMI January 23rd 2009 John Coughlan Operating in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next Generation Systems

Presentation for the NMI January 23rd 2009 John Coughlan Single Protein Molecules X-ray Imaging Just before XRay pulse During the pulse After pulse X-ray Diffraction Pattern 30,000 images per second each up to 16 MPixels

Presentation for the NMI January 23rd 2009 John Coughlan X-RAY Pixel Detectors DAQ For XFEL 16M + tiled pixel detector at 30K frames/s -> 1 – 6 TByte/s 128 x FPGA 40nm + 10G links Off detector DAQ next gen Advanced Telecoms ATCA crates … Scientific requirements ? 1 8 SFP+ FPGA Detector Pixel Sensors 10G Fibre 30 m 10 GBytes/sec x N cards Image Builders

Presentation for the NMI January 23rd 2009 John Coughlan Image Builder for XFEL Demonstrator Advanced Mezzanine Card 180 mm RAM CONNECTORCONNECTOR CONNECTORCONNECTOR CONNECTORCONNECTOR CONNECTORCONNECTOR KEEP OUT FPGA FMC FPGA KEEP OUT MGTMGT MGTMGT MGTMGT MGTMGT MGTMGT MGTMGT MGTMGT MGTMGT KEEPOUTKEEPOUT KEEPOUTKEEPOUT CONNECTORCONNECTOR CONNECTORCONNECTOR X- point TXTX TXTX TXTX TXTX RXRX RXRX RXRX RXRX FMC AMC Form Factor. Migrating to 8 FPGAs on 8U ATCA? FPGA ~ 16 x 3-6 Gbps serial links Analogue Cross Point for Image Building. 3-6 Gbps DDR2/3 ~ 2-4 GBytes B/W 1-2 GBytes/sec In & Out VITA57 FMC Mezzanine I/O 2 x SFP+ opto TRx 10 Gbps (XAUI or RXAUI PHY) mTCA serial backplane

Presentation for the NMI January 23rd 2009 John Coughlan Next Generation Board Issues High speed diff pairs 3-6 Gbps. BGA pitch < 1 mm? Reduce Fabrication Risk. Advanced PCB design and construction techniques. Vias in pad, micro vias, Laser drill. Incremental build up layer PCB. FPGA 40nm generation FPGA to Memory interface. SO-DIMMs WASSO Memory controllers Hard/Soft IP from FPGA vendors 10 Gbps optical interfaces 3-6 Gbps Serial Backplanes. Power. Multiple POL. Analogue. Decoupling caps. next gen FPGA packages. Pb Free manufacture? Tools Signal Integrity analysis, how to measure eye diagrams on board?

Presentation for the NMI January 23rd 2009 John Coughlan Design Tools PCB Design Tool Flow based on CADENCE. Fast serial design Signal Integrity analysis, HyperLynx FPGA Design Flow Mentor Graphics How to integrate PCB and FPGA design flow? Pin outs. Need realistic FPGA designs to guide PCB layout, e.g. memory interfaces Our expert (Paul Hardy) is here today

Presentation for the NMI January 23rd 2009 John Coughlan Summary STFC Technology, Who we are Data Acquisition for Big Science, CERN LHC LHC Data Acquisition boards. Next generation systems, XFEL

Presentation for the NMI January 23rd 2009 John Coughlan STFC, Rutherford Appleton Laboratory, Oxfordshire UK

Presentation for the NMI January 23rd 2009 John Coughlan Spare Slides