Questionnaire Response

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
John Coughlan et al.Rutherford Appleton Laboratory14th May 20023rd CMS Electronics Week Tracker Front-End Driver Progress Report 3rd CMS Electronics Week.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Tracker Strip and Pixel FEDs John Coughlan Tracker Readout Upgrade Meeting September 12 th 2007.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
CMS ECAL Week, July 20021Eric CANO, CERN/EP-CMD FEDkit FED Slink64 readout kit Dominique Gigi, Eric Cano (CERN EP/CMD)
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
CPT week May 2003Dominique Gigi CMS DAQ 1.Block diagram 2.Form Factor 3.Mezzanine card (transmitter SLINK64) 4.Test environment 5.Test done 1.Acquisition.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Initial check-out of Pulsar prototypes
Production Firmware - status Components TOTFED - status
Online Software Status
Regional Cal. Trigger Milestone: Major Production Complete
VELO readout On detector electronics Off detector electronics to DAQ
Regional Cal. Trigger Milestone: Production & Testing Complete
Front End Driver (FED) Crates and Racks +Tracker PSU racks
FED Design and EMU-to-DAQ Test
Presentation transcript:

Tracker FED Questionnaire Response Production Status Plans for 904 Plans for USC John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

Questionnaire Response 1. We already have FULL populated FED crates in 904 lab. Max of 16 x 9U FEDs in crate with associated 6U Transition cards to carry the CMCs. There are 40 FEDs and 35 Transition cards at CERN. 2. The final system has 36 crates containing a total of ~450 FEDs. We expect to deliver FEDs to CERN at about 50 per month. We have delivered 40 so far. I believe we have up to 12 crates installed in 904 open area for FEDs. 3. All 36 crates in USC won't be populated before Nov 06. FEDs should be there but depends on Tracker Integration needs. 4. We do have fake data/pattern generation facilities inside our FED. 5. The first ~150+ FEDs will be re-tested at B904 before being taken for the surface Tracker Integration in B186. Remaining will be re-tested at 904 and then direct to USC. We should have enough FEDs to start populating crates in USC start of Q2/06. 6. We should be ready to start integration at USC during Q2/06. On our side the minimum equipment we would require to send "fake" data would be ; Crates, cooling, CAEN controllers, TTC system. Assuming DAQ has provided FRLs, FMMs and associated cabling. But as you say difficult to give precise answers without more realistic installation planning. Our intention was to install FEDs in USC before the Tracker optical cabling is in place. Much depends on the Tracker Integration demands. A Question for you... When will the production Transmitter CMCs be available in quantities ? Ideally we would test the unit "FED + Transtion card + CMC" with FRL readout. Then keep that unit together for installing at USC. We are naturally rather anxious to test FEDs with production electronics of Trigger and DAQ systems including final FRLs and FMMs. Almost all tests so far have been with emulations of other systems. Particularly the merging to FRLs which I don't believe was thoroughly done? John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

FED Production Summary Total of 450 (+50 spare) x (9U FEDs + 6U Transition cards) Housed in 36 crates in USC 1st batch of 50 FED boards are almost all at RAL 2nd batch of 50 at test at Assembly Plant, many already at RAL. 3rd batch of 50 in production in progress. 40 FEDs sent to CERN last week First ~ 150 will be used at Tracker Surface Integration Tests B186 + 70 SLINK 6U VME Transition cards (35 of which at CERN) (to be tested with final DAQ link before completing production). John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

Acceptance Testing Flow 0. Quality Controls during Assembly process AOI, X-ray 1. Custom Tests at Assembly Plant BScan, VME crate FED Assembly Company 2. Tests at RAL Optical, Full crate 3. Tests at CERN Prevessin 904 Readout Integration Rear Transition card on J2 RAL 4. Installation at CMS USC55 “Pipeline” with each stage taking ~ 1 month and containing 50 FEDs John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

B904 2 Racks (1 with 3 FED crates) in lab area 3? Racks with 12 FED crates in open area. Production boards are only intended for large scale Tracker commissioning and USC. All FEDs are tested in UK before delivery to CERN. All Acceptance Full Crate Tests at B904 (weed out early failures) First ~ 150? to used for Surface Tests of Tracker Remaining will go direct to USC55 “Vertical Slice” Design Test. Test of Production FED/Transition card with other Production Tracker/CMS DAQ Electronic systems urgent. Manufacture of 400 remaining Transition cards on hold. Awaiting tests with FRL/FMMs Acceptance testing at CERN 904. Re-test all delivered FEDs in 904 crates (burn in). Aim to test and install: “FED + Transition card + SLINK Transmitter CMC” as unit ? John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

USC55 Installation in USC Could start with 1 crate / 1 rack Q2/06 ? FED can generate Fake Events with programmed data. But needs TTC system, PC interface for setup. Tracker doesn’t have a detailed plan for installation yet. Availability of crates, cooling, CCs, TTC, PCs…. Tracker Optical cabling front of rack. Mock up exists. Major job. Install FEDs first? DAQ FRL FMM cabling at rear of rack ? …other constraints. John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

Spare Slides John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

Test System Non Final Electronics Access VME with SBS620 PCI-VME link VME crate PC FT (slave) FT (slave) VME crate FT (slave) J1 Connector FT (master) J2 Connector Merge 96 fibres into 8 ribbons of 12 fibres Simulate Local Trigger Control System Throttle signals from FED to FT Clock & L1As from FT to FED Slink PC (PCI-X slots) J0 Connector Generic PCI Card Slink-Tx Slink Rx LVDS cable FED John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web

6U SLINK Transition Card Carrier for slink transmitter Buffers control and data signals Buffers throttle signals Status 70 manufactured and tested with FEDKit. Of these 35 already at B904 CERN Manufacture of remaining 400 on hold. Awaiting tests with FRL/FMMs FED VME Backplane DAQ – Slink Transmitter Slink data and control signals Throttle signals to Fast Merge Module (FMM) John Coughlan RUWG November 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web