Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
1 CTP DCS luminosity monitoring A. Jusko, R. Lietava, J. Urban.
LKr readout: present and future R. Fantechi 30/8/2012.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
J. Varela, LIP-Lisbon/CERN LEADE WG Meeting CERN, 29 March 2004 Requirements of CMS on the BST J. Varela LIP Lisbon / CERN LHC Experiment Accelerator Data.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
1 CTP offline software status (Offline week,8/4/08) R.Lietava for CTP group.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Status and Performance of the ALICE Trigger Electronics
CLAS12 DAQ & Trigger Status
TPC Commissioning: DAQ, ECS aspects
Luminosity Monitor Status
ALICE Trigger Upgrade CTP and LTU PRR
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
WP02 PRR: Master Oscillator and RF Reference Distribution
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Cabling Lengths and Timing
Commissioning and Testing the LHC Beam Interlock System
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
University of California Los Angeles
M. Krivda for the ALICE trigger project, University of Birmingham, UK
CTP offline meeting 16/03/2009 A.Jusko and R.Lietava
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009

Plan of Talk Introduction Hardware development Firmware development Software development Plans for next few months.

Starting Point Last September, the CTP was ready for the first collisions, and made considerable progress over the short period with circulating beams, even managing alignment of some trigger inputs In November, the CTP was switched off, under the condition that, exceptionally, it could be operated at specific request from a detector during the shutdown period. There have been a few requests, e.g. from TPC, Muon Trigger What else has happened?

Development Programme Hardware Improve optical connection to beam data devices BST1, BST2 in order to extract both clock and data from both Install optical fibre and drivers to transmit scope signals from trigger boards to surface Firmware LO board. Downscaling by dead time. LTU Maximum rate cut (requested by TPC) Upgrade to Switch firmware Software Improvements to offline interface, monitoring software and additions to make use of upgrades described above.

Hardware Installation of required fibres for BST1, BST2 readout In progress. BST2 signal required in two places so needs to be split. Suitable splitter being identified. Transmission of scope signals In progress. Delays with manufacturer in supplying suitably fast optical driver. Is now supplying such driver, but only with wrong optical connector. In order to make progress, adaptor is needed for use with our fibres. This would allow prototype to be made. Schedule now quite tight for having final version installed in time for collisions.

Firmware CTP upgrade New mode of downscaling. Programmable class trigger BUSY time. LTU upgrade. Done. (Rate control plus some minor improvements, mainly affecting those few detectors still using TTCvi.) Switch upgrade. Done. Now needs new software to exploit new features. See below.

Trigger Tests at Point2 status last year

Software 1 CTP Counters data readout Currently under review at trigger meetings organized by Federico Antinori. (see presentation by Anton Jusko April 22nd 2009) 6 counters per class (counts before and after every trigger level applied) saved in OCDB. Needed by offline for cross section calculations. All CTP counters saved in DCS for monitoring purposes – kept for “several months”. 8 values kept per LTU in DCS, again for monitoring purposes. Interaction records are sent to DAQ by DDL for each orbit. DAQ currently stores IRs only for orbits associated with L2a triggers (+/- 2 orbits). What to do with rest of data under discussion.

Software 2 Orbit-Turn checks CTP has an orbit counter (24 bits) that increments by one every time the requisite number of BCs is counted. “Turn” counter available on RF2TTC board, which notes orbit changes as seen by machine (using 32 bit counters) Anton has implemented program to look for jumps in difference between counters. Results indicate difference is stable with TTCmi– does not increase, but can fluctuate by +/- 1 turn Almost certainly not worrying as comparison relies on a network transfer that does not have a definite time. (average 60 microseconds) Increase seen with BST message –under investigation

Software 3 Switch upgrade allows counter readout for all inputs whether in CTP or not. Will be read out and stored to DCS Comparison with CTP counts for relevant counters will be made.

Plans for Next few months For more details see talk by Anton Jusko at run coordination meeting next Tuesday. CTP ON again. May-June Repeat of all commissioning tests with individual detectors as done last year (in conjunction with DAQ). Before August. CTP/ECS/DAQ integration: CTP readout and interaction record; advanced configurations (multiple clusters and classes) Stabilize transfer of.rcfg files to OCDB; recheck synchronization of LTUs; rehearse trigger alignment procedure. Set up calibration triggers Implement required p/f protections for different triggers. August Official cosmic data run September Start of injection tests. Start using alignment tools.

Summary Some important upgrades have been made during shutdown period, which should make very useful improvements to CTP functionality. With possible exception of oscilloscope transmission (dependent on receipt of components) all should be completed well in time. Programme for startup of trigger well advanced. Will be presented on Tuesday.

L1 Spurious Monitoring L1 gated so L1 spurious suppressed New counters introduced on L1 and fanout boards counting glitches before gatin g. Hints at correlation between glitches and VME activity.