1 Project X Proton Driver David Neuffer September 2011.

Slides:



Advertisements
Similar presentations
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
Advertisements

1 Front End rf and Gas Cavities David Neuffer Fermilab f October 2011.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
A 10 GeV, 4 MW, FFAG, Proton Driver at 50 Hz G H Rees, RAL.
Proton Capabilities at Fermilab Steve Holmes Neutrino Summit 21 July 2014.
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
ISIS Accelerator Division
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Fermilab and Muons Booster, Proton Driver (MECO, PRISM/PRIME, …) David Neuffer Fermilab.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Project X: A Multi-MW Proton Source at Fermilab Manfred Wendt & Steve Holmes SPL/ESS Collaboration Meeting Lund June 30, 2010.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Muon Collider Design Workshop, BNL Dec-09112/01/2009 C.W. Linac Options (talk not much different from talk at High Intensity Proton Accelerator Application.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Proton Drivers & Muon Sources at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
PIP-II: Goals, Strategy, and Status Paul Derwent 26 February, 2015.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
UK Neutrino Factory Conceptual Design
Proton Driver Scenarios at RAL and CERN
Towards a Common Proton Driver for a Neutrino Factory
Muon Acceleration using 8 GeV Proton Driver Linac
Progress towards Pulsed Multi-MW CERN Proton Drivers
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

1 Project X Proton Driver David Neuffer September 2011

20utline  Introduction  Proton Driver history  Mission  Project X  Overview  3GeV cw Linac multiple output options  3  8 GeV pulsed linac extension to 4MW for Neutrino Factory/ Muon Collider  3  8 GeV variations  FFAG  Discussion

Introduction  Since ~1995, Fermilab has identified an upgrade for the 8GeV Booster as its next major accelerator project  intensity, reliability, …  Various versions suggested  ~2GeV linac +16 GeV RCS ?  8GeV 800MHz SRF linac ? Foster  1300 MHz (use ILC)  Project X  ICD-1 configuration 8GeV pulsed SRF Linac ~ILC SRF/ Use 8GeV Recycler  Too expensive for DoE? 1MW 8GeV beam ? 3

Sergei Nagaitsev,Univer. 4

5 Project X mission and design (S. Nagaitsev et al.)  Mission goals 1.Provide 8 GeV beam to Main Injector for 2MW+ NUMI/NOvA/DuSEL expts. 2.Provide high-intensity medium-energy beams for fundamental process experiments 3.Provide a platform that can be extended to neutrino factory/muon collider applications (4MW ?) 4.ADS, nuclear physics, …  CD-2  Centerpiece is 3GeV CW linac

Current Design Layout  3 GeV CW linac  650MHz rf  1ma, 3MW  feeds experiments and  3  8 GeV Linac  1300MHz “ILC” cavities  5% duty factor, 10Hz, 0.3MW  feeds Recycler/ Main Injector for DuSEL 6 3 GeV CW Linac 3  8 GeV pulsed Linac

Project X vs. other facilities Sergei Nagaitsev,Univer. of D0, May 5,

Project X 3-GeV beam is cw  Key innovation is cw linac + rf splitter (like CEBAF) to serve many users  To form time structure add chopper at injector  (162.5 MHz RFQ with 5ma H - source ) ~2×10 8 /bunch  arbitrarily kick out individual bunches at 2.5 MeV MHz beam  500MHz in each exp

9 Chopping and splitting for 3-GeV experiments Separation scheme Ion source and RFQ operate at 4.2 mA MHz 75% of bunches are chopped at 2.5 MeV after RFQ Transverse rf splitter 1 MHz pulses 10 MHz pulses 20 MHz pulses 0.75MW 1.5MW 40.6 MHz deflector

Linac Systems overview 10  =0.11  =0.22  =0.4  =0.61  = MHz MeV  = GHz 3-8 GeV 650 MHz GeV SectionFreqEnergy (MeV)Cav/mag/CMType SSR0 (  G =0.11) /18/1SSR, solenoid SSR1 (  G =0.22) /20/ 2SSR, solenoid SSR2 (  G =0.4) /20/4SSR, solenoid LB 650 (  G =0.61) /24/65-cell elliptical, doublet HB 650 (  G =0.9) /40/205-cell elliptical, doublet ILC 1.3 (  G =1.0) /28 /289-cell elliptical, quad CW Pulsed RFQ MHz or MeV

650 MHz cavities,cryomodules MHz: β= MHz: β=0.9

3  8GeV for Main Injector  3  8 GeV pulsed Linac  or RCS (FFAG?)  want 2+ MW at 60/120 GeV/ for DuSEL/ NOvA/…  0.75/1.33s cycles  ~26ms-ma/pulse  too much for stripper?  Inject 6 ~4ms pulses into 8 GeV Recycler  10Hz Linac  0.6s  transfer to Main Injector  ~320 kW maximum output power 12

 /325 MHz must be chopped to fit 50MHz rf for Main Injector  ~3/5 bunches accepted  Injection requires “painting” to reduce foil hits and match into transverse acceptance 13

Upgrade to 4MW (for NF/MC) ?  Upgrade cw Linac to 5ma  15 MW peak power  run at 10% duty cycle  Increase pulsed linac duty cycle to ~10%  8GeV × 5ma × 10% = 4MW  Run at 15 Hz (6.7ms injection/cycle)  matches NF/MC scenarios  Chop at 50% for bunching  source/RFQ  10ma  Need Accumulator,  Compressor to bunch beam 14

Need 15/60 Hz bunches  Add Accumulator and Compressor Rings  ~8GeV rings  Accumulator captures and bunches beam 2×10 14 p, h=4  Compressor: ¼ phase rotate to short bunch (combine onto target for MC)  Challenges  stripping injection: foil melts ?  Lattice design large acceptance, δp/p  FMC lattice (Alexhin)  FFAG ?? 15 ParameterAccumulatorCompressor Circumference300m Transition γ t Slip factor η=1/γ t 2 -1/γ rf voltage V rf 4.0kV120kV bunches (h) 4 4 Accumulator: σ = 6.5m From Linac: σ = 11m Compressor: σ = 0.5m

Current Status  Proposal Development and R&D  SRF development  325 MHz Cavity design, construction tests  650 MHz  MOU with Jlab for 2  =0.6 cavities  Order for six  = 0.9 cavities in industry  partnerships with India  1300 MHz ~ILC cavities and cryomodules  PXIE – Front End test stand  ~First 10 MeV of linac (~40m)  RFQ, Wide band Chopper + initial 325 MHz rf  Workshops for Mission need  Construction status:  Still waiting for CD-0 16

17 3  8 GeV Alternative?  Use 3GeV: ~cw 1ma injector  avoid 5ma upgrade ?  3  8 GeV FFAG  similar to IDS FFAG  Challenge to Workshop : Develop FFAG scenario for project X  Leo Jenner, J. Pasternak will discuss options  Would like scenario that can:  start with driver for Main Injector  upgradeable to 4MW (15/60Hz) with bunch compression for NF/MC  be clearly more affordable than 3  8 GeV Linac + rings + …