1 Project X Proton Driver David Neuffer September 2011
20utline Introduction Proton Driver history Mission Project X Overview 3GeV cw Linac multiple output options 3 8 GeV pulsed linac extension to 4MW for Neutrino Factory/ Muon Collider 3 8 GeV variations FFAG Discussion
Introduction Since ~1995, Fermilab has identified an upgrade for the 8GeV Booster as its next major accelerator project intensity, reliability, … Various versions suggested ~2GeV linac +16 GeV RCS ? 8GeV 800MHz SRF linac ? Foster 1300 MHz (use ILC) Project X ICD-1 configuration 8GeV pulsed SRF Linac ~ILC SRF/ Use 8GeV Recycler Too expensive for DoE? 1MW 8GeV beam ? 3
Sergei Nagaitsev,Univer. 4
5 Project X mission and design (S. Nagaitsev et al.) Mission goals 1.Provide 8 GeV beam to Main Injector for 2MW+ NUMI/NOvA/DuSEL expts. 2.Provide high-intensity medium-energy beams for fundamental process experiments 3.Provide a platform that can be extended to neutrino factory/muon collider applications (4MW ?) 4.ADS, nuclear physics, … CD-2 Centerpiece is 3GeV CW linac
Current Design Layout 3 GeV CW linac 650MHz rf 1ma, 3MW feeds experiments and 3 8 GeV Linac 1300MHz “ILC” cavities 5% duty factor, 10Hz, 0.3MW feeds Recycler/ Main Injector for DuSEL 6 3 GeV CW Linac 3 8 GeV pulsed Linac
Project X vs. other facilities Sergei Nagaitsev,Univer. of D0, May 5,
Project X 3-GeV beam is cw Key innovation is cw linac + rf splitter (like CEBAF) to serve many users To form time structure add chopper at injector (162.5 MHz RFQ with 5ma H - source ) ~2×10 8 /bunch arbitrarily kick out individual bunches at 2.5 MeV MHz beam 500MHz in each exp
9 Chopping and splitting for 3-GeV experiments Separation scheme Ion source and RFQ operate at 4.2 mA MHz 75% of bunches are chopped at 2.5 MeV after RFQ Transverse rf splitter 1 MHz pulses 10 MHz pulses 20 MHz pulses 0.75MW 1.5MW 40.6 MHz deflector
Linac Systems overview 10 =0.11 =0.22 =0.4 =0.61 = MHz MeV = GHz 3-8 GeV 650 MHz GeV SectionFreqEnergy (MeV)Cav/mag/CMType SSR0 ( G =0.11) /18/1SSR, solenoid SSR1 ( G =0.22) /20/ 2SSR, solenoid SSR2 ( G =0.4) /20/4SSR, solenoid LB 650 ( G =0.61) /24/65-cell elliptical, doublet HB 650 ( G =0.9) /40/205-cell elliptical, doublet ILC 1.3 ( G =1.0) /28 /289-cell elliptical, quad CW Pulsed RFQ MHz or MeV
650 MHz cavities,cryomodules MHz: β= MHz: β=0.9
3 8GeV for Main Injector 3 8 GeV pulsed Linac or RCS (FFAG?) want 2+ MW at 60/120 GeV/ for DuSEL/ NOvA/… 0.75/1.33s cycles ~26ms-ma/pulse too much for stripper? Inject 6 ~4ms pulses into 8 GeV Recycler 10Hz Linac 0.6s transfer to Main Injector ~320 kW maximum output power 12
/325 MHz must be chopped to fit 50MHz rf for Main Injector ~3/5 bunches accepted Injection requires “painting” to reduce foil hits and match into transverse acceptance 13
Upgrade to 4MW (for NF/MC) ? Upgrade cw Linac to 5ma 15 MW peak power run at 10% duty cycle Increase pulsed linac duty cycle to ~10% 8GeV × 5ma × 10% = 4MW Run at 15 Hz (6.7ms injection/cycle) matches NF/MC scenarios Chop at 50% for bunching source/RFQ 10ma Need Accumulator, Compressor to bunch beam 14
Need 15/60 Hz bunches Add Accumulator and Compressor Rings ~8GeV rings Accumulator captures and bunches beam 2×10 14 p, h=4 Compressor: ¼ phase rotate to short bunch (combine onto target for MC) Challenges stripping injection: foil melts ? Lattice design large acceptance, δp/p FMC lattice (Alexhin) FFAG ?? 15 ParameterAccumulatorCompressor Circumference300m Transition γ t Slip factor η=1/γ t 2 -1/γ rf voltage V rf 4.0kV120kV bunches (h) 4 4 Accumulator: σ = 6.5m From Linac: σ = 11m Compressor: σ = 0.5m
Current Status Proposal Development and R&D SRF development 325 MHz Cavity design, construction tests 650 MHz MOU with Jlab for 2 =0.6 cavities Order for six = 0.9 cavities in industry partnerships with India 1300 MHz ~ILC cavities and cryomodules PXIE – Front End test stand ~First 10 MeV of linac (~40m) RFQ, Wide band Chopper + initial 325 MHz rf Workshops for Mission need Construction status: Still waiting for CD-0 16
17 3 8 GeV Alternative? Use 3GeV: ~cw 1ma injector avoid 5ma upgrade ? 3 8 GeV FFAG similar to IDS FFAG Challenge to Workshop : Develop FFAG scenario for project X Leo Jenner, J. Pasternak will discuss options Would like scenario that can: start with driver for Main Injector upgradeable to 4MW (15/60Hz) with bunch compression for NF/MC be clearly more affordable than 3 8 GeV Linac + rings + …