2 GridPP2 Budget David Britton, 4/12/03 Imperial College.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Tony Doyle GridPP2 Proposal and Responses to Questions, Grid Steering Committee, Coseners, 28 July 2003.
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Tony Doyle Executive Summary, PPARC, MRC London, 15 May 2003.
Welcome to the 12 th GridPP Collaboration Meeting Introduction Steve Lloyd, Chair of the GridPP Collaboration Board Report on recent meetings of: PPARC.
GridPP Funding Model(s) D. Britton Imperial College 24/5/01 £21m + £5m.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
Tony Doyle GridPP2 Specification Process Grid Steering Committee Meeting, MRC, London, 18 February 2004.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
GridPP4 Oversight Committee Meeting 4th February 2010
1Oxford eSc – 1 st July03 GridPP2: Application Requirement & Developments Nick Brook University of Bristol ALICE Hardware Projections Applications Programme.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
S.L.LloydGridPP9 IntroductionSlide 1 Introduction Welcome to the 9 th GridPP Collaboration Meeting Dissemination Officer GridPP2 Posts Tier-2 Centres Steve.
Joint Information Systems Committee 01/04/2014 | | Slide 1 e-Infrastructure Programme James Farnhill e-Research Programme Manager e-Infrastructure Security.
GridPP Presentation to PPARC Grid Steering Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP24 Collaboration Meeting.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
GridPP Presentation to PPARC e-Science Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Debt Affordability Committee 1 Debt Affordability Committee August 15, 2013.
HE in FE: The Higher Education Academy and its Subject Centres Ian Lindsay Academic Advisor HE in FE.
Break Time Remaining 10:00.
15. Oktober Oktober Oktober 2012.
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
How to commence the IT Modernization Process?
We are learning how to read the 24 hour clock
S.L.LloydGridPP CB 4 December 2003Slide 1 Agenda 1.Minutes of Previous Meeting (19 Feb 2003) 2.Matters Arising 3.Announcements (Steve) 4.GridPP2 Proposal.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Tony Doyle - University of Glasgow PPARC Review Timeline 0. PPARC Call (February 2003) 1.GridPP2 Proposal (30/5/03) 2. Feedback from Reviewers 3. Responses.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GTSC-9 Summary Glenn Parsons, GTSC-9 Chair, ISACC Document No: GSC16-CL-04 Source: GTSC-9 Contact:
The Future of Higher Education in Further Education Colleges Swindon 17 May 2007.
18 th Mar’03Nick Brook – University of Bristol1 GridPP2 bid Nick Brook University of Bristol Timescales Draft outline Envelope What is expected from expts.
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
D. Britton Preliminary Project Plan for GridPP3 David Britton 15/May/06.
D. Britton Project Manager’s Report David Britton 12/Jan/2005.
NI Executive Budget 2010 BRIEFING FOR CAL COMMITTEE.
: 3 00.
5 minutes.
1 OKLAHOMA STATE REGENTS FOR HIGHER EDUCATION Making Place Matter October 29, 2009.
Campus Budget Overview Fall 2010 Kelly Ratliff Budget and Institutional Analysis.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
NI Executive Budget 2010 Pre-Consultation. Outline Background and Context UK Fiscal Position Implications for NI Budget Way Forward Key Questions.
Select a time to count down from the clock above
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
D. Britton Collaboration Board Meeting David Britton 16/Jul/07.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
S.L.LloydGridPP CB 19 February 2003Slide 1 Agenda 1.Minutes of Previous Meeting (29 Oct 2002) 2.Matters Arising 3.GridPP2 Planning 4.EGEE 5.Any Other Business.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Organisation Management and Policy Group (MPG): Responsible for setting and policy decisions and resolving any issues concerning fractional usage, acceptable.
D. Britton Collaboration Board Meeting Draft Response to the PPRP David Britton 25/Oct/06.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
E-Science Research Councils awarded e-Science funds ” science increasingly done through distributed global collaborations enabled by the Internet, using.
Collaboration Board Meeting
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

2 GridPP2 Budget David Britton, 4/12/03 Imperial College

2 Introduction £15.9m September* 2004 – September 2007 Possible additional £1m for LCG-2 3 FTE ring-fenced for non-LHC applications *Some transition spending will be needed from April The GridPP2 project, a continuation of GridPP, will deliver a full-scale production Grid to meet application requirements across the Particle Physics programme. The full deployment of Grid technology will make efficient use of resources to enable the UK to capitalise on investment in the LHC to meet the unprecedented challenges of LHC computing and enhance the discovery potential of UK physicists. Time Line: GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY 07-08

2 Following the PPRP review of the original £23.1m proposal two scenarios were presented to the Grid Steering Committee in July 03:  £17.3m “Reduced Programme” (£2.5m for LCG-2; £14.8m UK)  £19.6m “Regained Programme” (£2.5m for LCG-2; £17.1m UK) ( see With £15.9m we believe that we can still effectively fund the non- LCG part of the Regained Programme by modifying the planning assumptions as follows:  Reduced estimated of average staff costs at CCLRC.  New university appointments at Spine Point 11 rather than 13.  Reduction in the length of many posts (all posts end Sep 07). Overview

2 LCG (Tier-0) The UK contribution to LCG-2 at the 20% pro-rata level would be about £2.5m. Science Committee has presently reserved £1m for which a strong case will have to be made. GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY This buys access to the Tier-0 and the LCG releases on which the UK PPGrid critically depends. An under-funded LCG2 jeopardizes the goals of GridPP2.

2 Tier – 1 The Tier-1 is the only resource completely under the control of GridPP with which international obligations can be met. It needs to be of a high standard. GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY £5.3m, divided roughly equally between staff and hardware, buys a minimal UK Tier-1. This will be complimented by something like £2.7m from EGEE* (for UK support) and CCLRC. * EGEE assumed to be years

2 Tier – 2 The Tier-2s offer potential access to very significant resources but their distributed nature and the need to dove-tail with local policies and non-HEP usage, make them less predictable. GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY £2.3m buys access to the substantial hardware (£3m  £8m) resources at the institutes. Complimented by ~£1.7m from EGEE (for UK support) and in-house contributions.

2 Applications The applications themselves are developed by the respective experiments within their own international context. GridPP provides funding to help interface the applications to the Grid. GridPP strongly encourages joint projects. GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY £3.0m enables the UK groups to take a leading role in interfacing the experiment applications to the Grid. This is complemented by large international efforts and by ~£5m funding from SR2002 to the LHC experiments.

2 Middleware/Security/Networking The GridPP2 proposal identifies 5 areas of involvement that are either mission- critical or capitalize on UK leadership. Many of these areas lever FP VI funding. £3.1m addresses these areas and levers ~£1.7m of FP VI funding. Work Area GridPP1 GridPP2 PPARC funding Other funding PPARC funding Other funding Data and Storage Mngmt Workload Management * Security * Information & Monitoring Network Sector Fabric Management Totals * Funding not established GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY 07-08

2 Operation & Management The number of Managers is reduced in GridPP2 but the new Dissemination officer and Production Manager are also counted here, leading to the apparent increase. GridPP-1GridPP-2 FY FY GridPP-1GridPP-2 FY FY ExploitnGridPP-2Exploitn FY FY Management (£0.9m), travel (£0.8m), and operations (£0.5m) The travel budget for GridPP2 was scaled from GridPP1 by the number of FTE supported but without any inflation compensation.

2 Element Summary EGEE assumed to be years with second phase funding the same as the first. Four EGEE funded posts are assumed to be at the Tier-2 centres, the remaining at Tier-1 GridCC and DAGGR projects assumed to proceed for 2 years in line with the FTE numbers in the tender document. This funding is not yet established. Tier-2 hardware numbers are subject to revision after the MOU information is gathered. CCLRC is assumed to contribute 3 FTE for four years in addition to £1.12m of legacy hardware.

2 Notes We plan to regard 10% of the Tier-1 hardware budget (10% of £2.4m) as contingency (this is a 1.5% contingency on the project.) The staff costs include an inflation factor but a degree of uncertainty remains with respect to to spine point at appointment and no annual increments have been built in. To address this, the staff costs have been inflated by 3% in the current planning. A substantial increase in university indirect costs could not be absorbed. Travel has been scaled from GridPP1 experience but without inflation. This implies a similar number of GridPP collaboration meetings and a similar travel policy but with a possible call on the contingency. GridPP1 has not supported LTA as a cost-effective investment of resources. In GridPP2 any requests for LTA or extended travel would be considered on a case-to-case basis and would require a call on the contingency.

2 Conclusion Using modified planning assumptions we believe we can fund the “Regained Programme” originally presented to the Grid Steering Committee. The CB is asked to approve this plan as presented today.