Frascati, 28 Maggio 2003 Accelerator Physics and Design Working Group Summary 2/2 O. Napoly.

Slides:



Advertisements
Similar presentations
Compression Scenarios for the European XFEL Charge and Bunch Length Scope Igor Zagorodnov 1st Meeting of the European XFEL Accelerator Consortium DESY,
Advertisements

FEL Beam Dynami cs FEL Beam Dynamics T. Limberg Short Bunches at FLASH.
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
08/01/2007Juan Luis Fernandez-Hernando End Station A Measurements on Collimator Wakefields 4th Wakefield Interest Group - CI 05/03/2008 Luis Fernandez-Hernando,
First Results from the ERL Prototype (ALICE) at Daresbury David Holder, on behalf of the ALICE team. LINAC'08 Victoria, BC.
When you see… Find the zeros You think….
A 10 GeV, 4 MW, FFAG, Proton Driver at 50 Hz G H Rees, RAL.
Ursula van Rienen, Universität Rostock, FB Elektrotechnik und Informationstechnik, AG Computational Electrodynamics Scattering Parameter Calculation for.
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
ALPHA Storage Ring Indiana University Xiaoying Pang.
LHeC Test Facility Meeting
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
Low Emittance RF Gun Developments for PAL-XFEL
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Making the ATF into an ERL-FFAG May 27, 2015Stephen Brooks, eRHIC R&D retreat1 In relation to eRHIC risks addressed.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
What did we learn from TTF1 FEL? P. Castro (DESY).
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
Have a chance to operate your own beam at CERN
Large Booster and Collider Ring
Update of CLIC accelerating structure design
Accelerator Layout and Parameters
Bunch Separation with RF Deflectors
The Cornell High Brightness Injector
ERL Main-Linac Cryomodule
Overview Multi Bunch Beam Dynamics at XFEL
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Beam Dynamics in a Spilt SRF-Gun
Electron Source Configuration
LHC (SSC) Byung Yunn CASA.
CW Energy Recovery Linac for Next Generation of XFELs
Beam Position Measurements in TTF Cavities
Superconducting High Brightness RF Photoinjector Design
Start-to-End Simulations for the TESLA LC
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Evgenij Kot XFEL beam dynamics meeting,
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Frascati, 28 Maggio 2003 Accelerator Physics and Design Working Group Summary 2/2 O. Napoly

Frascati, 28 Maggio 2003 CEBAF Energy Recovery Experiment Michael Tiefenback GeV scale Energy Recovery demonstration. – Testing the potential of ERLs –Demonstration of high final-to-injection energy ratios - 20:1 and 50:1 –Optimized beam transport in large scale recirculating linacs (320 SC cavities) - RF steering and skew field compensation for accelerated/decelerated beams 56MeV injection 56MeV /2 phase delay chicane 1L21 2L21 56MeV 556MeV 1056MeV 556MeV 1056MeV 56MeV 556MeV deceleration acceleration deceleration

Frascati, 28 Maggio 2003 CEBAF Energy Recovery Experiment Michael Tiefenback rf power measurement - selected cavity at the end of South Linac Standard arc BPMs go dead with ER beam: - BPM signal at RF fundamental - Decelerated beam is λ/2 delayed from primary beam signals destructively interfere in BPM antennae

Frascati, 28 Maggio 2003 CEBAF Energy Recovery Experiment Michael Tiefenback synchrotron light monitor – accelerated/decelerated beams at 556 MeV Emittance measurements and Halo measurement  Beam quality is essentially preserved (80 µA)

CW Energy Recovery Linac for Next Generation of XFELs General Thoughts based on TESLA XFEL-TDR TJNAF: A. Bogacz INFN: INFN: M. Ferrario, L. Serafini DESY: DESY: D. Proch, J. Sekutowicz, S. Simrock BNL:I. Ben-Zvi LANL:P. Colestock UCLA:J. B. Rosenzweig TESLA_TTF Meeting Frascati, May 26-28, 2003

Frascati, 28 Maggio 2003 RF-Gun ? BC I : 0.14 GeV BC II : 0.50 GeV BC III : 2.50 GeV En = 10÷20 GeV R~150 m 1.8 km ~3 km Dump (0.5 MW) 3xSASE 2xUndulators Possible layout can be very similar to the present pulsed linac energy recovery 95%

Frascati, 28 Maggio 2003 Any combination of the bunch charge and the spacing of bunches giving nominal current is OK Example: 1 mA= 1 spacing 1 µs

Frascati, 28 Maggio 2003 Conclusion Needed R&D : cw RF gun suppression of microphonics more experience with the energy recovery Total cost without experiments should be < 400 MEuros Total AC power for Cryoplant + RF < 10 MW But we will have : 6 x more bunches /s very flexible time structure of the beam.

Frascati, 28 Maggio 2003 * TESLA Meeting - Frascati - 27 May 2003 * Towards a Superconducting High Brightness RF Photoinjector M. Ferrario, J. B. Rosenzweig, J. Sekutowicz, L. Serafini INFN, UCLA, DESY

Frascati, 28 Maggio 2003 Main Questions/Concerns RF Focusing vs Magnetic focusing ? RF Focusing vs Magnetic focusing ? High Peak Field on Cathode ? High Peak Field on Cathode ? Cathode Materials and QE ? Cathode Materials and QE ? Q degradation due to Magnetic Field ? Q degradation due to Magnetic Field ?

Frascati, 28 Maggio 2003 SCRF GUN Measured Limited by the available voltage Measurements at room T on a dedicated DC system Extrapolation to Higher Field

Frascati, 28 Maggio 2003 Splitting Acceleration and Focusing 25 cm 10 cm 50 cm The Solenoid can be placed downstream the cavity The Solenoid can be placed downstream the cavity Switching on the solenoid when the cavity is cold prevent any trapped magnetic field Switching on the solenoid when the cavity is cold prevent any trapped magnetic field

Frascati, 28 Maggio 2003 Q =1 nC R =1.5 mm L =20 ps  th = 0.45 mm-mrad E peak = 60 MV/m (Gun) E acc = 13 MV/m (Cryo1) B = 1.9 kG (Solenoid) I = 50 A E = 120 MeV  n = 0.6 mm-mrad  n [mm-mrad] Z [m] HOMDYN Simulation 6 MeV 3.5 m scaling laws for Q and E peak available

Progress on Helical Undulator for Polarised Positron Production Duncan Scott ASTeC Daresbury Laboratory

Frascati, 28 Maggio 2003 SC Magnet Undulator Prototype Prototype Magnet Design for 14mm period: Beam Stay Clear 4mm Helix Diameter 6mm

Frascati, 28 Maggio 2003 Permanent Magnet Undulator Design 14mm Period, 4mm Bore “Halbach” undulator (Klaus Halbach NIM Vol. 187, No1) Rotate many rings to create Helical Field PPM blocks create Dipole Field

Frascati, 28 Maggio 2003 Vacuum Problems TESLA requirements of ~10 -8 mbar vacuum CO equivalent For the SC magnet : –this can be achieved, as long as the number of photons above 3eV hitting the vessel wall is not greater than s -1 m -1 For the Permanent magnet : –theoretical maximum for a 5 m long 4mm bore vacuum pipe is mBar –A NEG coated vessel is needed, thought to be feasible although no-one has ever NEG coated a 4mm diameter tube Hope to build two ~20 period prototypes (one of each design) to measure the magnetic field this year Progress on Helical Undulator for Polarised Positron Production

TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors D. Alesini, F. Marcellini

Frascati, 28 Maggio 2003 Injection CTF3-LIKE INJECTION/EXTRACTION SCHEME (simple scheme) 1)If the filling time (  F ) of the deflectors is less than  T DR it is possible to inject or extract the bunches without any gap in the DR filling pattern. 2)  should be   * depending on the ring optics and septum position. Considering a single RF frequency    /  MAX =1-cos(2  /F) Extraction LINAC TRAIN Rec. factor

Frascati, 28 Maggio 2003 DEFLECTOR PARAMETERS (  /2) 6 Deflectors (3 inj. + 3 extr.) Defl 1  f RF1 = 433*1/  T L = [MHz] Defl 2  f RF2 = 438*1/  T L = [MHz] Defl 3  f RF3 = 443*1/  T L = [MHz] Total beam deflection = 0.87 [mrad] Deflection defl.1 = 0.29 [mrad] Deflection defl.2 = 0.29 [mrad] Deflection defl.3 = 0.29 [mrad] P = 9 [MW] L = 0.64 [m]  F = 48 [nsec] n. Cells/defl = 11 P = 5.00 [MW] L = 0.86 [m]  F = 64 [nsec] n. Cells/defl = 15  MAX = 69 % 3 Frequencies  maximization of  MAX in the range [430*1/  T L  450*1/  T L ] =1.276  GHz  no bunch length 3 distant freq. case 3 close freq. case 

Frascati, 28 Maggio 2003 FINITE BUNCH LENGTH New optimization procedure: - to increase  1 - (if possible) to reduce the RF slope over the bunch length   z =6 mm, the same 2 freq. optimized in the previous case give:  1 = 9 % Extracted bunch How to avoid the effect of the RF curvature on the extr. bunches

Frascati, 28 Maggio 2003 DEFLECTOR PARAMETERS (  /2) 6 Deflectors (3 inj. + 3 extr.) Defl 1  f RF1 = 444*1/  T L = [MHz] Defl 2  f RF2 = 437*1/  T L = [MHz] Defl 3  f RF3 = 435*1/  T L = [MHz] Total beam deflection = 1.05 [mrad] Deflection defl.1 = 0.35 [mrad] Deflection defl.2 = 0.35 [mrad] Deflection defl.3 = 0.35 [mrad] P = 9 [MW] L = 0.78 [m]  F = 58 [nsec] n. Cells/defl = 13 P = 5.00 [MW] L = 1.04 [m]  F = 77 [nsec] n. Cells/defl = 18 3 Frequencies  1 = 57 %  maximization of  1 in the range [430*1/  T L  450*1/  T L ] =1.276  GHz  bunch length  z =6 mm 3 distant freq. case 3 close freq. case 

Frascati, 28 Maggio 2003 F=100  L DR  2.85 Km  maximization of  1 in the range [430*1/  T L  450*1/  T L ] =1.276  GHz  bunch length  z =2 mm P = 9 [MW] L = 1.6 [m]  F = 119 [nsec] n. Cells/defl = 28 P = 5.00 [MW] L = 2.15 [m]  F = 160 [nsec] n. Cells/defl = 37 DEFLECTOR PARAMETERS (  /2) 6 Deflectors (3 inj. + 3 extr.) Defl 1  f RF1 = 447*1/  T L = [MHz] Defl 2  f RF2 = 440*1/  T L = [MHz] Defl 3  f RF3 = 436*1/  T L = [MHz] Total beam deflection = 2.16 [mrad] Deflection defl.1 = 0.72 [mrad] Deflection defl.2 = 0.72 [mrad] Deflection defl.3 = 0.72 [mrad]  1 = 28 % 3 distant freq.

Frascati, 28 Maggio 2003 OUR EXPERIENCE WITH RF DEFLECTOR FOR CTF3 1. STUDY AND NUMERICAL SIMULATIONS 2. MECHANICAL DRAWING 3. CONSTRUCTION 4. MEASUREMENTS 1 st turn - 1 st bunch train from linac 2 nd turn 3 rd turn 4 th turn

Frascati, 28 Maggio 2003  /2 MODE Deflection = 0.5 mrad f RF = 1.3 GHz Disk thickness = mm Cell length = mm

Frascati, 28 Maggio 2003 Module III Module II OFF q = 3.5 nC f b = 2.25 MHz Tp = 780  s Agilent E8563E spectrum analyser zero span HOM 2 HOM 1 Att 10 dB GPIB Spectrum analyser Beam used as aparametric bandpass filter: –central frequency –resolution bandwidth signals in time domain ON Beam Position Measurements in TTF Cavities using Dipole Higher Order Modes G. Devanz, O. Napoly, CEA, Gif-sur-Yvette A.Gössel, S. Schreiber, M. Wendt, DESY, Hamburg

Frascati, 28 Maggio 2003 Dipole mode measurements 2 positions computed using 2 modes with the same beam High gradient in cavities (~ 20 MV/m)  orbit is expected to cross ACC1 module axis if entering at an offset

Scattering Parameter Calculation for the 2x7 Superstructure TESLA Collaboration Meeting INFN Frascati May 26-28, 2003 Karsten Rothemund, Dirk Hecht, Ulla van Rienen

Frascati, 28 Maggio x7-Superstructure 7 Cell TESLA Cavity HOM-Coupler Input-Coupler Images: I.Ibendorf Radius Adapter

Frascati, 28 Maggio 2003 HOM-Coupler (HOM 2 + HOM 3) HOM 2 HOM 3HOM 1 Input rotate HOM 3 shift planes 27.4 mm

Frascati, 28 Maggio Cell TESLA Cavity f= GHz TE11 TM01 TE21 Plot: MWS, simulation: MAFIA, 2D, time domain f/GHz |S..|/dB f/GHz |S..|/dB

Frascati, 28 Maggio 2003 CSC-Computation Calculation of overall S-matrix open ports: beam pipe, 3x HOM-, 1x Input-coupler 1500 values computed in GHz frequency range shown here: GHz (3 rd dipole passband) 481 frequency-points + interpolation S-values of 7-cell cavity f/GHz |S..|/dB

Frascati, 28 Maggio 2003 Results Coupling between HOM1 and HOM2 to beam pipe modes HOM1 HOM2 downstream beam pipe upstream beam pipe f/GHz |S..|/dB f/GHz |S..|/dB

Frascati, 28 Maggio 2003 Summary S-parameter of 2x7 TESLA-Superstructure have been calculated (an open structure) with CSC 5 modes have been considered in the structure S-parameter of subsections were computed with CST-MicrowaveStudio TM (coupler sections, 3D) MAFIA (TESLA cavity, 2D-rz-geometry) analytically (shifting planes, rotation) some exemplary coupling parameters have been presented computation times for S-parameters of subsections in order of days additional computation times whole structure then in the order of minutes parameter tuning (e.g. rotation angles, distances) possible

Start-to-End Simulations for the TESLA LC A Status Report Nick Walker DESY TESLA collaboration Meeting, Frascati, th May 2003

Frascati, 28 Maggio 2003 Ballistic Alignment 62

Frascati, 28 Maggio 2003 New Simulations using PLACET and MERLIN 14 quads per bin (7 cells,  = 7  /3) RMS Errors: –quad offsets:300  m –cavity offsets:300  m –cavity tilts:300  rad –BPM offsets:200  m –BPM resolution:10  m –CM offsets:200  m –initial beam jitter:1  y (~10  m) New transverse wakefield included (~30% reduction from TDR) [Zagorodnov and Weiland, PAC2003] wrt CM axis

Frascati, 28 Maggio 2003 Ballistic Alignment Less sensitive to model errors beam jitter average over 100 seeds

Frascati, 28 Maggio 2003 Ballistic Alignment average over 100 seeds We can tune out linear  y  and  y’  correlation using bumps or dispersion correction in BDS

Frascati, 28 Maggio 2003 Beam-Beam Issues optimise beam- beam offset and angle OK for ‘static’ effect D. Schulte. PAC03, RPAB004

Frascati, 28 Maggio 2003 Simulating the Dynamic Effect Realistic simulated ‘bunches’ at IP –linac (PLACET, D.Schulte) –BDS (MERLIN, N. Walker) –IP (GUINEAPIG, D. Schulte) –FFBK (SIMULINK, G. White) bunch trains simulated with realistic errors, including ground motion and vibration LINACBDSIRBDSIR IP FFBK All ‘bolted’ together within a MATLAB framework by Glen White (QMC)

Frascati, 28 Maggio 2003 Simulating the Dynamic Effect IP beam angle IP beam offset

Frascati, 28 Maggio 2003 Simulating the Dynamic Effect 2  cm  2 s  1 Only 1 seed: need to run many seeds to gain statistics!

NEW DESIGN OF THE TESLA INTERACTION REGION WITH l * = 5 m O. Napoly, J. Payet CEA/DSM/DAPNIA/SACM Advantages from the detector point-of-view –Larger forward acceptance at low angles –Final doublet moved out of the calorimeter  less e.m. showers in the detector –Lighter Tungsten-mask and simpler support

Frascati, 28 Maggio 2003 NLC-like Optics

Frascati, 28 Maggio 2003 Simulating the Extraction Line Part of the extraction line included in BRAHMS: Shadow: Distance from IP: 45m 2m long 5mm thick 7mm vertical distance from nominal beam (~156 µrad) Copper Septum Blade: Distance from IP: 47m 16m long 5mm thick ~7mm vertical distance from nominal beam Copper

Frascati, 28 Maggio 2003 Realistic Beam Shadow: Average deposited power: ~15 kW Septum blade: Average deposited power: ~80 W