RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.

Slides:



Advertisements
Similar presentations
ASREN Technical Committee Assuming and Building ASREN infrastructure ASREN Launch Meeting, Cairo, 8-9 December 2010 Aouaouche El-Maouhab (CERIST), Algeria.
Advertisements

ARUP ROY CHOUDHURY, CMD-NBCC & CHAIRMAN-SCOPE Affordable Housing ARUP ROY CHOUDHURY, CMD-NBCC & CHAIRMAN-SCOPE Affordable Housing Presentation National.
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
Superintendent Director Pupil Personnel Services Administrative Assistant Director of Curriculum, Instruction, & Assessment Director of Career & Technical.
CERN, 14 May Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
Index Values NATIONAL STATISTICAL COORDINATION BOARD.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Organization chart of the functioning of practicums in the Faculty of Education and Psychology.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
LV and HV status of the RPC system RPC detector and trigger group.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Presidents and Governors Forum Role of Presidents and Past- Presidents in their Section / Branch.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
The Rector – Head teacher. The ‘Convitto’ schools and female boarding schools (total of 45) have their own regulations because they are residential as.
CMS at LNF group activities Davide Piccolo for the LNF CMS group LNF Scientific commettee1.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Progetto CMS RPC: Preventivi 2017
P. Paolucci G. Pugliese M.Tytgat
RPC Barrel HV & LV system Lappeenranta University
Online Epson Printer Customer Service | Support
Electronics for RPC Upscope
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
DLINK TECHNICAL SUPPORT HELPLINE DLINK TECH SUPPORT
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
First Meeting of the SFC on 31/5/2011 at PM
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
Mr. Cleveland Thomas Vice Chairman Working Party 2/3 Study Group 3 ITU-T.
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
مديريت موثر جلسات Running a Meeting that Works
RPC Detector Control System
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
23 Barrel chambers and 12 Endcap chambers
Presentation transcript:

RPC project chart Pigi Paolucci

RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level Run Coordinator & DPG2 0 level Electronic/Tech coordinators2 0 level Upscope SC - Production2 0 level TC – Operation – DPG – Upscope3 0 level 24/3/20102Pierluigi Paolucci - RPC project

Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project Manager Deputy PM Operation Deputy PM Up scope Technical coordination Electronics coordination Run coordination Production Coordinator Operation BranchUp-scope Branch

Operation Gas CalibrationDCSXDAQDQMRun Quality Tech. coordination Gas systemHV-LVDetectorTriggerElectronicsIntegration DPG DCSCAF/Offline toolsData CertificationXDAQCondition DBSimulationDQMAnalysis Upscope GapAssemblyElectronicsInfrastructureServiceCommissioning 24/3/ Pierluigi Paolucci - RPC project

Responsabilità italiane Project ManagerG. Iaselli1 0 level DeputiesA. Colaleo (Ba) 2 0 level ResourceP. Paolucci (Na)2 0 level Run CoordinatorG. Pugliese (Ba)2 0 level DPGD. Piccolo (LNF)2 0 level ElectronicP. Paolucci (Na)2 0 level Tech coord.S. Buontempo (Na)2 0 level DQMA. Cimmino (Na)3 0 level GGMS. Bianco (LNF)3 0 level GasL. Benussi (LNF HV-LVP. Paolucci (Na)3 0 level DetectorA. Dimitrov (Ba) 3 0 level 24/3/2010Pierluigi Paolucci - RPC project5