1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.

Slides:



Advertisements
Similar presentations
Heavy Ion Cancer Therapy
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
EPICS at SSRF/Shaghai in March.2008, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members at Mar.2008.
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
Accelerator R&D FFAGs EMMA, PAMELA, ADSR, etc
1 Project X Proton Driver David Neuffer September 2011.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Chapter 5 Test Review Sections 5-1 through 5-4.
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
25 seconds left…...
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
A 10 GeV, 4 MW, FFAG, Proton Driver at 50 Hz G H Rees, RAL.
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
We will resume in: 25 Minutes.
2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
ISIS Accelerator Division
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
ESS DTL beam commissioning
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
June 20, 2008Shin'ya Fermilab E9061 J-PARC and Dimuon Experiments Shin’ya Sawada KEK (High Energy Accelerator Research Organization, Japan)
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
KEK Plans for J-PARC Particle Physics at J-PARC CERN-KEK Committee March 29, 2010 at KEK Koichiro Nishikawa Institute for Particle and Nuclear Studies,
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Development of the beam loss monitor for beam halo measurement in the J-PARC RCS Masahiro Yoshimoto *, Hiroyuki Harada, Shinidhi Kato, Kota Okabe, Michikazu.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
1 Heavy-Ion Physics at J-PARC Shoji Nagamiya RIKEN / KEK / JAEA January 20, 2016 Tokai 1) Motivation 2) J-PARC vs. FAIR.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
J-PARC Site Visit Summary – 03/09 S. Childress (Accelerator, T2K Primary) J. Hylen (T2K Target Hall, Decay, Absorber & Near Detector)
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
UK Neutrino Factory Conceptual Design
Injection and Extraction in the J-PARC RCS
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
A Superconducting Proton/Electron Linac
RF introduction Anders Sunesson RF group leader
Presentation transcript:

1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam 4.The T2K experiment 5.Possible future experiment 6.Summary IV International Workshop on: “Neutrino Oscillations in Venice” April 18, 2008 Koichiro Nishikawa (KEK)

2 Materials and Life Science Experimental Facility Hadron Beam Facility Nuclear Transmutation J-PARC J-PARC = Japan Proton Accelerator Research Complex Joint Project between KEK and JAEA 3 GeV Synchrotron (25 Hz, 1MW) Linac (350m) 50 GeV Synchrotron (0.75 MW) 500 m Neutrino to Kamiokande Slow Extracted Beam Facility

3 Linac SDTL Ion source, LEBT, RFQ, MEBT(2 choppers, 2 bunchers) Not funded Second phase DTL Front-end part Particle: H - Energy: on day-one181 MeV with ACS400 MeV Peak current: at 181 MeV30 mA at 400 MeV50 mA Repetition:25 Hz Pulse width:0.5 msec Commissioned Jan.2007 upto SDTL ( 181 MeV )

4 Excellent stability of LINAC M. Ikegami, ATAC2008

5 Status of RCS (Commissioned Nov 2007) Collimator section RF section Beam injection section Circumference 348 m Repetition rate25 Hz Injection energy181/400 MeV Extraction energy3 GeV Harmonic number2 RF section from Linac to MLF RCS to MR 1st arc section Two beam transport lines 3NBT:transport line to the MLF 3-50BT: transport line to the MR 3NBT 3-50BT MR MLF Injection section Extraction section

6 QxQx QyQy (6.35,6.47) (6.64,6.25) ~3.8x10^11 /bunch (Peak: 22mA, Macro: 0.05ms, Medium: 112ns, Vrf~420kV) ~1.9x10^12 /bunch (Peak: 22mA, Macro: 0.05ms, Medium: 560ns, Vrf~420kV) ~3.8x10^12 /bunch (Peak: 22mA, Macro: 0.1ms, Medium: 560ns, Vrf~420kV) ~4.6x10^12 /bunch (Peak: 22mA, Macro: 0.12ms, Medium: 560ns, Vrf~440kV) Measured for h=2, 1-bunch op. w/o painting injection ~3.8x10^11 /bunch ~1.9x10^12 /bunch ~3.8x10^12 /bunch ~4.6x10^12 /bunch “~4.6x10 12 /bunch; h=2, 1bunch; 25Hz ” operation Successfully performed !!!!! 5Q y =31? 2Q y =13 2Q x =13 Q x -Q y =0 Q x -2Q y =-6 Q x +Q y =13 corresponding to 100 kW in terms of particles per bunch ~6.5% loss near the injection : ⇒ ~0.42kW (assuming 2-bunch op.) <4kW (collimator limit) Current dependence of the beam loss H. Hotchi, ATAC2008

7 Summary of Linac/RCS status The linac and RCS have been commissioned successfully. The stability of linac beam is sufficiently good for beam commissioning of RCS. For RCS: - The optics measurement and its correction were successfully performed. - The acceleration of 4.6x10 12 particles (h=2, 1bunch) with 25 Hz repetition, corresponding to 100 kW operation in terms of particles per bunch, has been achieved. -The particle loss was almost localized on the collimators. -The RCS is ready for the MR & MLF beam commissioning -NEXT(Now) : Painting in injection

8 MR (slow cycling Main Ring synchrotron) Circumference m Repetition rate~ 0.3 Hz Injection energy3 GeV Extraction energy30 GeV (start) Superperiodicity3 h9 No of bunches8 (6 in 2009) Transition  j 31.7 Transverse emittance At injection~54  mm-mrad At extraction~10  mm-mrad(30 GeV) 598 ns 58 ns 4.2  s (8 bunches) 4x10 13 Protons

9 MR status and commissioning plan Installation of accelerator components and vacuum system completed. Off beam commissioning has been started in Dec Beam commissioning is scheduled from May –1st stage (May-June 2008): 3 GeV DC opetration –2nd stage (Dec Feb. 2008): Acceleration to 30 GeV, abort dump, beam extraction to hadron beamline –3rd stage (April -June 2009): Beam extraction to neutrino beamline –2x10 20 protons on the target by the 2010 summer shutdown. ( T2k can search below CHOOZ limit with e-appearance )

10 Intensity Upgrade

11 Space charge limit Make larger phase space in RCS RF bucket Single bunch operation - longer bucket Cycle time Faster acceleration with more RF power

12 Power Upgrade of Neutrino Beam (8 bunches/pulse) MR 30 GeV LINAC 181MeV Cycle time 3.52 sec P/bunch 0.27MW RCS h=1 Operation Cycle time P/bunch 1MW 0.91MW MR 30 GeV LINAC 400MeV Cycle time 1.92sec P/bunch 1.66MW MR RF Upgrade Cycle time= MW 5% 8% 17% ( MR usage of RCS) LINAC 400MeV 0.45MW

13 Some experiments at ‘slow extracted beam’

14 Slow Extracted Beam Lines Handron Hall Beam Dump K1.8 K1.8BR KL 30~50 GeV primary beam Production target (T1) K1.8 KL

15 E05  Hyper nuclei No.1 priority in nuclear physics 2 MeV FWHM resolution ~6 events/day/MeV for 50 msr, 2g/cm2-thick Pb ~20 days

16 Measurement of K L →   Measurement of K L →  

17 E14 Step 1 –Goal: First observation of the decay –Upgrade KEK E391a detector –New CsI (FNAL) calorimeter –16 0 production angle (small neutron halo) –Beam survey in 2009 ( Step 2: >100 events to measure the BR ) BR Standard Model Step 1 KEK E391a Run2 New Physics

18  -e conversion Feasibility study Extinction factor Fast kicker SC near primary beam Goal : 5x Predictions from SUSY Seesaw Models with upgrade

19 Current result is 3.4 sigma above from the SM value Efforts toward a proposal have started to realize the experiment in the earlier phase of J-PARC –Technical feasibility of bunch sequences and beamline are being explored –Harmonics changes in the MR and kicker design are key issues –KEK designed new inflector for a better muon injection eff. –g-2 ring to be shipped from BNL Muon

20 List of Experiments Many nuclear physics experments

21 T2K Collaboration ~400 members from 12 Countries Canada, France, Germany, Italy, Japan, Korea, Poland, Russia, Spain, Switzerland, UK, US High intensity  beam (~10 2 xK2K) from J-PARC MR Discovery of e appearance  Determine  13 Precision meassurement of  disappearance   23,  m 23 2

22 # 295km

23 Super Kamiokande Rebuilt

<sin 2 2  12 <0.94 sin 2 2    sin 2 2    Lepton mixing pattern ?                % CL allowed values sin 2 2  13 sin 2   sin 2  

25  Target Horns Decay Pipe Super-K.  decay Kinematics OA3° OA0° OA2° OA2.5° Statistics at SK (OAB 2.5 deg, 1 yr, 22.5 kt) ~ 2200  tot ~ 1600  CC e ~0.4% at  peak  Quasi Monochromatic Beam  x 2~3 intense than NBB  Fairly independent on  spectrum dist. Narrow intense beam: Off-axis beam Osci. Prob. @  m 2 =3x10 -3 eV 2  flux 0° 2° 2.5° 3° E (GeV) p  (GeV/c) 5 Anti-neutrinos by reversing Horn current

26 Main features of T2K The distance (295km) and  m 2 (~2.5x10 -3 eV 2 ) 1. Oscillation max. at sub-GeV neutrino energy –sub-GeV means QE dominant Event-by event E  reconstruction –Small high energy tail small BKG in e search and E  reconstruction for oscillation pattern studies E(rec.) requirement on e candidates 2.Analysis of water Cherenkov detector data has accumulated almost twenty years of experience –K2K has demonstrated BG rejection in e search 3.Hadron production measurement (NA61) 4.Neutrino interactions at similar energy region (SciBooNE)

27 Measure  prod. from Graphite target 0-250mrad 0.5-5GeV/c  K ratio First data taking in Oct., 2007 (1month) –Beam: 30GeV proton –Thin target (2cm t 4%int ):~ 500k int. –Replica target (90cm, 80%int): ~180k int. Measurements in 2008 planned CERN-SPS NA61 (SHINE) experiment T2K goal w/ NA61  (N bg ) for e app. 10%<4%  (sin 2 2  23 ) 1%0.5%  (  m 23 2 )[10 -4 eV 2 ] 10.15

28 FNAL (Jun2007~)  cross section at sub GeV (~T2K) Total collected POT: 1. 46E20 : 9.2E19 (goal: 1E20)  : 5.4E19 (goal: 1E20) (from K2K)  CCQE cand Intensive analysis in progres on various modes

29 Beam Monitor Proton beam to Target NA61  K production distribution SciBooNE Neutrino interactions Near detector observables SK observables F near (E) F far (E) Measurements are product of  ’s times  ’s  K production & neutrino/antineutrino interaction model

30 E rec (GeV) Signal+BG BG Sensitivity: e appearance  Discovery of  e appearance ( , m  ) (P e,  e ) E e p e 4 OA2 o 5years m 2 = 3x10 -3 eV 2 sin 2 2 13 = 0.1 CHOOZ 90% >10 times improvement from CHOOZ 90%CL

31 La Thuile 2004 Measurement of sin   ,  m   Measurement of sin   ,  m    disappearance  m 2 = 3.0 x eV 2 Fully contained, 1-ring,  -like sample # of events (arb. unit) w/o osc. 31 Stat. only --68%CL (  ln L=0.5) --90%CL (  ln L=1.36) --99%CL (  ln L=3.32) Goal (sin 2 2  )~0.01 (m  2 )~<1×10 -4 (OA2.5  )  disappearance

32 Neutrino Beam Line and Near Detector

33 The T2K collaboration thanks CERN for allowing us to re-use UA1 magnet

34 Having been transported by lorry to Geneva La Praille and loaded onto freight trains that took them to the port of Antwerp (Belgium), the containers are now aboard container ships bound for Pusan in South Korea, from whence they will sail to the port of Hitachinaka, their point of entry to Japan. Sailing... and has arrived at J-PARC site

35 Status of 280m Near Detectors On-axis detector (INGRID) Iron+Scibar Sandwich In production, ready in Apr.2009 UA1 magnet being shipped Installed in Apr-Jun.2008 Photo-sensor (~60k ch) in productionTPC ECAL FGD All are in production

36 MW Neutrino Beam Line Heating by dEdX –Water cooling and He cooling (where possible) Shock wave and high radiation –Remote handling –Graphite for target and dump core (< 10ppm O 2 ) –Tritium, NOx production –Minimum number of beam windows One piece enclosure from entrance to the target area to beam dump, filled with He

37 p beam horns pions target To decay volume Iron shield Concrete shield He vessel Target Station Installation of the helium vessel(~470ton, 1000m 3 ) finished, passed vacuum test in Nov as scheduled

38 Target and horns 38 p beam 3 horns 320kA) pions target To decay volume Iron shield Concrete shield He vessel 38 1 st Horn 3 rd Horn Graphite target (26mm  x90cm) Day-1 target delivered Helium gas cooling test successful Long term test 320kA Horn1,3 for Day-1 delivered Target inside Ti-alloy capusule

39 The Neutrino Facility in J-PARC 39 Preparation Section SC combined func mags Target-Horn System Target Station Decay Volume Beam Dump Final Focusing Section Muon Monitoring Pit Near Neutrino Detector 295km to Super-Kamiokande 110m Construction: Apr ~ Mar (5yrs)

40 Conceptual Design Engineering Design Real ProductionInstallation Proton Beam monitorFeb.~ Superconducting magnetsFeb~ CryogenicsApr~ Normal Conducting magnets Vacuum system TargetAug.~ HornAug.~ Target Station Beam WindowJul~ Decay Volume Beam DumpAug~ Muon monitor08/09 Summary of Status All components are in production phase Installations are starting as scheduled

41 Beyond T2K 1986 Kamiokande 1996 SuperKamiokande K2K and T2K 2009 – MW neutrino beam New Detector

42  CP Violation in Lepton Sector Two approaches CPV  sin  12 sin  23 sin  13  m 2 12 (L/E) sin  Solar and Atmospheric Second Max.

43 First / Second Maximum and  One of the most dangerous bias:  Energy mis-reconstruction to lower value than real value

44 CPV in neutrino oscillation Depend on the size of   different effects from various systematics –Neutrino-Anti-Neutrino asymmetry Cross section, Detection efficiencies Ratios e   differences Contamination of wrong sign –First vs. Second Maximum Wide band beam (small off-axis beam) E (L) at the second maximum should be sufficiently large to have reasonable cross section (E≈0.5 GeV → L≈500km) E  measurement over large range of energy (efficiency for low energy particles)

45 3  sensitivity for CPV in T2K no BG signal stat only (signal+BG) stat only stat+2%syst. stat+5%syst. stat+10%syst. CHOOZ excluded sin 2 2  13  m 31 2 ~3x10 -3 eV 2 T2K 3  discovery 3  CP sensitivity : |  |>20 o for sin 2 2  13 >0.01 with 2% syst. 2MW, 1Mt 2 yr for  6~7yr for   m 21 2 =6.9x10 -5 eV 2  m 32 2 =2.8x10 -3 eV 2  12 =0.594  23 =  /4

46 Some physics potential studies Presented by NP08 Presented by NP08 100kt Liq Ar 660km/0.8deg, 5yr numu 0.54Mt SK full det sym w/ 5% syst No syst, perfect energy reso.

47Summary In one year J-PARC accelerator complex is being commissioned Construction of T2K beam line is on time and will be commissioned in April 2009 Aiming for first results in 2010 In several years Plan for 1.66MW in 5 years T2K data taking which will provide vital information on  , needed to define next step, Future detector R/D on Mt Water C /~100kt size LiqAr TPC at several candidate sites Future CPV in lepton sector and Proton Decay

48 Thank you for your attention

49

50 Primary proton beam line Superconducting Arc section –28 combined function magnets –D2.6T,Q18.6T/m, L=3.3m Normal conducting Preparation section and Final focusing (FF) section –Installation in progress 50 Tunnel completed (Dec. 2006) 26(/28) mags delivered 11(/14) doubles installed

51 Secondary beam line 51 He vessel (470t,1000m3) completed, passed vac test in Nov Beam dump graphite module being assembled 1/14 part Sep, 2007 Mar. 2008DV under 3NBT installed in FY2005

52 Beta function and dispersion  : measured from the response of the closed orbit for a dipole kick (STM) Injection + Arc Extraction + Arc RF + Arc s(m)  (m) Vertical, w/ kick angle corr. Horizontal, w/ kick angle corr. Good agreement with the design. 181 MeV DC mode s(m)  x (m)  y (m) Design  : Measured from rf-frequency dependence of the closed orbit H. Hotchi, ATAC2008

53 Intensity upgrade plan of the first three years - Requirement from T2K: 2.0E20 protons on the target by the 2010 summer shutdown. - Guideline :Beam loss at each extraction point < W to keep residual radiation level < 1mSv/h.

54 First high enrgy MW fast-ext’ed beam ! cm 1100 o (cf. melting point 1536 o ) 3.3E14 ppp w/ 5  s pulse When this beam hits an iron block, Material heavier than iron would melt. Thermal shock stress (cf. 耐力 ~300 MPa) Material heavier than Ti might be destroyed. Cooling power and radiation shield 12GeV PS x 100 Residual radiation > 1000Sv/h

55 Present Technology limit Temparature rise and thermal shock limit us about 2MW proton beam –Alminum horn –Graphite target beam power –Ti vacuum window number of protons Substantial R/D and experiences needed to go substantially beyond this limit

56 S ij =sin  ij, C ij =cos  ij e appearance probability CP conserving CP solar matter effect  - , a  -a for   e  13 Small numbers S 31 sinΦ 21 ~ 0.03 mass hierarchy

57 Neutrino beam line with MW protons 57 Shock wave Heat generation Various sources including dE/dX 4kW(water), MW (air) magnets and their power water cooling Target Horn TS-DV-BD wall /BD core water cooling Radioactive water and air radioactive water 13GBq / 3weeks (must be diluted <30Bq/cc to dispose)  many tanks, ion exchange filter, backup loop  radioactive He 7GBq / 3 weeks (must be diluted <5mBq/cc to dispose)  Production cross section of Tritium in He is 1/10 of air  He vessel ( need O 2 <10ppm)