© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

EuroCondens SGB E.
Operations Management Maintenance and Reliability Chapter 17
Chapter 6 Elasticity and Demand.
Flexible Budgets, Variances, and Management Control: II
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2002 Pearson Education, Inc. Slide 1.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Cost Behavior, Operating Leverage, and Profitability Analysis
Analysis of Cost, Volume, and Pricing to Increase Profitability
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Operations Management
Operations Management
Supplement 7 Learning Curves
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Cash Flow Estimation Models Estimating Relationships and Problems.
Introduction to Cost Behavior and Cost-Volume Relationships
What Is Cost Control? 1 Controlling Foodservice Costs OH 1-1.
MCQ Chapter 07.
Chapter 11 Strategic Capacity Management
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
Managing Capacity Chapter 6.
Strategic Capacity Planning for Products and Services
Operations as a Competitive Weapon
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Re-Order Point Problems Set 1: General
© 2006 Prentice Hall, Inc.8 – 1 Operations Management Chapter 8 – Location Strategies © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
© 2006 Prentice Hall, Inc.8 – 1 Operations Management Chapter 8 – Location Strategies © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
Squares and Square Root WALK. Solve each problem REVIEW:
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Operations Management
Elasticity of Demand and Supply
When you see… Find the zeros You think….
Chapter 5 Test Review Sections 5-1 through 5-4.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Slippery Slope
Week 1.
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
Dealing with Competition
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
How Cells Obtain Energy from Food
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
Global Manufacturing and Materials Management
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations.
Operations Management
E - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall E E Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
ME - 1© 2014 Pearson Education, Inc. Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
What is Learning Curve Most organizations learn & improve over time. As firms and employees perform a task over and over, they learn how to perform more.
E Learning Curves PowerPoint presentation to accompany
Presentation transcript:

© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 7e Operations Management, 9e

© 2008 Prentice Hall, Inc.E – 2 Outline  Learning Curves in Services and Manufacturing  Applying the Learning Curve  Arithmetic Approach  Logarithmic Approach  Learning-Curve Coefficient Approach  Strategic Implications of Learning Curves  Limitations of Learning Curves

© 2008 Prentice Hall, Inc.E – 3 Learning Objectives When you complete this module you should be able to: 1.Define a learning curve 2.Use the arithmetic concept to estimate times 3.Compute learning curve effects with the logarithmic and learning-curve coefficient approaches 4.Describe the strategic implications of learning curves

© 2008 Prentice Hall, Inc.E – 4 Learning Curves  Based on the premise that people and organizations become better at their tasks as the tasks are repeated  Time to produce a unit decreases as more units are produced  Learning curves typically follow a negative exponential distribution  The rate of improvement decreases over time

© 2008 Prentice Hall, Inc.E – 5 Learning Curve Effect Figure E.1 Cost/time per repetition Number of repetitions (volume) 0

© 2008 Prentice Hall, Inc.E – 6 Learning Curves T x L n = Time required for the n th unit whereT=unit cost or unit time of the first unit L=learning curve rate n=number of times T is doubled First unit takes 10 labor-hours 70% learning curve is present Fourth unit will require doubling twice — 1 to 2 to 4 Hours required for unit 4 = 10 x (.7) 2 = 4.9 hours

© 2008 Prentice Hall, Inc.E – 7 Learning Curve Examples Table E.1 Example Improving Parameters Cumulative Parameter Learning- Curve Slope (%) (%) Model -T Ford production Price Units produced 86 Aircraft assembly Direct labor-hours per unit Units produced 80 Equipment maintenance at GE Average time to replace a group of parts Number of replacements 76 Steel production Production worker labor-hours per unit produced Units produced 79

© 2008 Prentice Hall, Inc.E – 8 Learning Curve Examples Table E.1 Example Improving Parameters Cumulative Parameter Learning- Curve Slope (%) (%) Integrated circuits Average price per unit Units produced 72 Handheld calculator Average factory selling price Units produced 74 Disk memory drives Average price per bit Number of bits 76 Heart transplants 1-year death rates Transplants completed 79

© 2008 Prentice Hall, Inc.E – 9 Uses of Learning Curves Internal:labor forecasting, scheduling, establishing costs and budgets External:supply chain negotiations Strategic:evaluation of company and industry performance, including costs and pricing

© 2008 Prentice Hall, Inc.E – 10 Arithmetic Approach  Simplest approach  Labor cost declines at a constant rate, the learning rate, as production doubles Nth Unit Produced Hours for Nth Unit = (.8 x 100) = (.8 x 80) = (.8 x 64) = (.8 x 51.2)

© 2008 Prentice Hall, Inc.E – 11 Logarithmic Approach Determine labor for any unit, T N, by T N = T 1 (N b ) whereT N =time for the N th unit T 1 =hours to produce the first unit b=(log of the learning rate)/(log 2) =slope of the learning curve

© 2008 Prentice Hall, Inc.E – 12 Logarithmic Approach Determine labor for any unit, T N, by T N = T 1 (N b ) whereT N =time for the N th unit T 1 =hours to produce the first unit b=(log of the learning rate)/(log 2) =slope of the learning curve Learning Rate (%) b 70– – – – –.152 Table E.2

© 2008 Prentice Hall, Inc.E – 13 Logarithmic Example Learning rate = 80% First unit took 100 hours T N =T 1 (N b ) T 3 =(100 hours)(3 b ) =(100)(3 log.8/log 2 ) =(100)(3 –.322 ) =70.2 labor hours

© 2008 Prentice Hall, Inc.E – 14 Coefficient Approach TN=T1CTN=T1CTN=T1CTN=T1C whereT N =number of labor-hours required to produce the N th unit T 1 =jumlah jam kerja yang dibutuhkan untuk memproduksi unit pertama C=Coefficient kurva belajar spt ditampilan di tabel E.3

© 2008 Prentice Hall, Inc.E – 15 Learning-Curve Coefficients Table E.3 70%85% UnitNumber (N)Unit TimeTotal TimeUnit TimeTotal Time

© 2008 Prentice Hall, Inc.E – 16 Learning-Curve Coefficients Table E.3 70%80% UnitNumber (N)Unit TimeTotal TimeUnit TimeTotal Time

© 2008 Prentice Hall, Inc.E – 17 Coefficient Example First boat required 125,000 hours Labor cost = $40/hour Learning factor = 85% T N =T 1 C T 4 =(125,000 hours)(.723) =90,375 hours for the 4 th boat 90,375 hours x $40/hour = $3,615,000 T N =T 1 C T 4 =(125,000 hours)(3.345) =418,125 hours for all four boats

© 2008 Prentice Hall, Inc.E – 18 Coefficient Example Third boat required 100,000 hours Learning factor = 85% 100, = 129,366 hours New estimate for the first boat

© 2008 Prentice Hall, Inc.E – 19 Strategic Implications To pursue a strategy of a steeper curve than the rest of the industry, a firm can: 1.Follow an aggressive pricing policy 2.Focus on continuing cost reduction and productivity improvement 3.Build on shared experience 4.Keep capacity ahead of demand

© 2008 Prentice Hall, Inc.E – 20 Industry and Company Learning Curves Figure E.2 Price per unit (log scale) Accumulated volume (log scale) Gross profit margin Loss (a)(a)(a)(a) (c)(c)(c)(c) (b)(b)(b)(b) Company cost Industry price

© 2008 Prentice Hall, Inc.E – 21 Limitations of Learning Curves  Learning curves differ from company to company as well as industry to industry so estimates should be developed for each organization  Learning curves are often based on time estimates which must be accurate and should be reevaluated when appropriate

© 2008 Prentice Hall, Inc.E – 22 SEKIAN

© 2008 Prentice Hall, Inc.E – 23 Limitations of Learning Curves  Any changes in personnel, design, or procedure can be expected to alter the learning curve  Learning curves do not always apply to indirect labor or material  The culture of the workplace, resource availability, and changes in the process may alter the learning curve

© 2008 Prentice Hall, Inc.E – 24 Dibutuhkan waktu jam untuk menyelesaikan lokomotif kedelapan pada sebuah perusahaan manufaktur. Jika faktor pembelajaran adalah 80% berapa lama yang dibutuhkan untuk memproduksi lokomotif kesepuluh. Dan berapa total biaya untuk memproduksi 10 lokomotif jika upah perjam US$ 20Dibutuhkan waktu jam untuk menyelesaikan lokomotif kedelapan pada sebuah perusahaan manufaktur. Jika faktor pembelajaran adalah 80% berapa lama yang dibutuhkan untuk memproduksi lokomotif kesepuluh. Dan berapa total biaya untuk memproduksi 10 lokomotif jika upah perjam US$ 20