24/7 Systems Mission Integrate, communicate, and analyze PLANT RELIABILITY INFORMATION From multiple plant condition, repair, overhaul, installation, and.

Slides:



Advertisements
Similar presentations
Total Productive Maintenance
Advertisements

RCM-Tool v1.0 Demo Performing Welcome to the RCM-Tool RCM-Tool
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Accel Computerized Maintenance Management System.
Total Productive Maintenance
Corporate Imaging Kathy Mumford Session 2 Room C Tennessees BEST 2005 Tech Tips User Conference.
Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
“The Honeywell Web-based Corrective Action Solution”
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
Quality Improvement and Control System QuIC ILYA NIKANOROV
ValvKeep® via VK-Viewer
©2011 Team Quality International Inc. PO Box , Simi Valley, CA 93094, USA Tel:
Chapter 3 Application Software p. 6.
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
Powerpoint Templates Page 1 Powerpoint Templates Page 2 Something you own that has value There can be assets that gain value over time…. What is an Asset?
BHot-Link 7.0 View and manage corporate files from within Baan and ERP LN. Allows you to access the files on the network from within Baan maintain sessions!
HACCP Manager Software™
SE429 Maintenance Planning and Control.
Computerized Maintenance Management System | May 15, |1 | Computerized Maintenance Management System Presented By [Presenter Name] [Presenter Title]
Ben McCormickPhil Joseph Copyright © 2009 Catavolt, Inc. All rights reserved.
EM Track III Overview EM Track III is a Windows Based Tire Records System Multiple Customers Can be Maintained at Same Time Share Customers Data With.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Computerised Maintenance Management Systems
Structure Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 STRUCTURE COMMANDER Introduction Product Overview.
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
Integrate your people maximize your knowledge Tel SalesBase Customer.
BUSINESS SYSTEMS IMPROVEMENT PROJECT NC Department of Transportation Early 1980’s – Legislative Directive to use a SHARED Fleet Maintenance System SVFMS.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Systems Analysis and Design: The Big Picture
Motor Management Basics What Needs to be Managed Motor Life Cycle Measuring Motor Reliability Managing Condition Information Data Mining for the big Reliability.
Vehicle and Equipment Maintenance Tracking & Cost Program Designed for the Green and Construction Industries For Companies of Any Size EQUIP TRACK.
Systems Development Life Cycle Dirt Sport Custom.
New Tools to Increase Sales And to Enhance The User Experience.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
Copyright (c) 2005 Uruhun, Inc. Complete Contact CRM Your Distribution Business NEEDS Complete Contact Management.
1 Warranty and Repair Management For Infor XA Release 7 WARM Denise Luther – Sr. XA Consultant WARMS Technical Manager CISTECH, Inc. Rod Fortson – Sr.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Reliability & Maintainability Engineering An Introduction Robert Brown Electrical & Computer Engineering Worcester Polytechnic Institute.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
Eric Wagner Mike Taylor Phil Joseph Copyright © 2009 Catavolt, Inc. All rights reserved.
Condor Technology Solutions, Inc. Grace Performance Chemicals HRIS Intranet Project.
Designed for the Telecom Industry and built on a Mobile Computing Platform Asset Tracking & Network Lifecycle Management.
Computerised Maintenance Management Systems
Modern Maintenance. Management
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
CLIENT INFORMATION CENTER BY Steven Phillips & Anthony Williams.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
© 2006 CCI Pope Pty Ltd Best-Practice Condition Monitoring Data Management with… ® ®
Maintenance Management Software SPUDWEB TECHNOLOGIES PRIVATE LIMITED SPUMAINT Presented By :-
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
QuickServe Online Service Training
LubeWatch® Oil Analysis Program
Reliability Analysis & Infor EAM
RCM Turbo SQL Version.
Maintenance Lubrication
MAX Warranty Tracking Vince Stefanetti, Exact MAX Americas Trainer.
FaciliWorks CMMS ®.
Fertilizer Industry Safety Information Analysis and Sharing Program
By Forrest Pardue – President, 24/7 Systems, Inc. &
AV 13 Avantis Capabilities for Effective Asset Management
QuickServe Online Service Training
QuickServe Online Service Training
Presentation transcript:

24/7 Systems Mission Integrate, communicate, and analyze PLANT RELIABILITY INFORMATION From multiple plant condition, repair, overhaul, installation, and inspection data sources

Desktop & Web Software Architecture Tango DB on Web Server Tango Web Services Plant Intranet Reports Via Web Browser Desktop Tango Administrative Users Desktop Software Repair Shop 1 Repair Shop 2 File Transfer Plant LAN Repair Shop 3

Problems with Managing Condition Information Measurement of Success Cost Avoidance/Basic Reliability Improvement Communications Many sources of information need single point for results Focus Selecting correct technologies for criticality Reporting

Problems - Condition Gate keeping work orders at planning meeting

Problems – With Managing Equipment Information How to calculate MTBF, MTBR, MTTR Data not put in system Data on paper in file cabinets Many Documents to find and maintain Root Cause difficult to get Cost of failure

Principles of Equipment Life Cycle Management Elimination of Failures in Service in Assets which disrupt production and cause high maintenance cost Increase operating life period between failures by the systematic elimination of Root Causes of Failure

Tango Equipment Lifecycle Management Functions Manage Equipment Condition Information and Action to Prevent Failures in Service Manage Equipment Life Cycle Information, Reliability Measurement and Improvement metrix Data Mining

Manage Equipment Condition Information and Action to Prevent Failures in Service Condition Entry Integrated Condition Report Condition Assessment Task Management and Subcontractor Management Manage Criticality, Aliases, Documents Rounds logging

Manage Equipment Life Cycle Information, Reliability Measurement and Improvement metrics Vendor Input Repair information Equipment Design Search Rotating Spares Equipment Vs Location Reliability Reliability Metrics

Test and Inspection Task Management Task which require a managed document Subcontractor management

Data Mining Analyze Historical data for Patterns Reliability Measurement Plant Performance

Integrated Condition Report Provides focus & communication Allows Managers to address upcoming reliability problems & measure performance Emphasis on: Which component has problems What is the problem (faults) How severe is problem What should be done (recommendations) Data is secondary & used to help visualize problem

Integrated Condition Report Contd. Browser based, easy to view, & tailored to users area Ability to view by severity or criticality Provides feedback to originator for work performed & requires validation of repair Creates Work Order in CMMS & receives Work Order closure information

Data vs. Information Plants have multiple condition monitoring & analysis systems, each is specialized for a technology. Each technology usually has one or more trained Analyst. Tango is used to gather what an Analyst knows about a problem. Integrate that with what other Analyst from other technologies know about the problem. Tango allows Management & Planners to focus on the problem & make good reliability improvement decisions. Our Customers report that Tangos ability to provide Management focus on condition problems is a major advantage.

ElectricalVibration Thermography Process Oil Ultrasonics

Tango | Integrated Condition Report Pie chart quickly shows how many assets in a users area are in states of problem severity Color coded list shows most severe problems at top of the list Findings from multiple condition monitoring technologies are shown for each asset component Work Order Status shows if work has been initiated by each Condition Entry Case Closure shows that work has been completed and is ready for condition confirmation

Navigate the Integrated Condition Report Double Clicking on Component opens the Tree for fast access to Location, Equipment, and Condition History Reports Double Clicking on Severity opens the Technology Status Reports Clicking on Paper Clip opens Linked Documents such as Analysts Technical Report

Tango Equipment Life Cycle Functions Is Equipment Repair Practical? Scrap NO YES Equipment Failure Equipment Removed From Service Equipment Sent For Repair Shop Ships Equipment Shop Repairs Equipment YES NO Plant Receives Equipment Repair Quote Approved? Equipment Purchased Calculate MTBF Cost of Failure Failure Root Cause Failure Progression Copyright 24/7 Systems, Inc Stores Inspections & Data Logging Task Sheet Management Condition Assessment Equipment Installation In Place Maintenance

Tango Equipment Management Tango Equipment Inventory CMMS Cost of Repair New Purchase Equipment In place Maintenance OLAP Database Data Mining INSTALLEDSPARE OUT FOR REPAIR PURCHASESCRAP In Place Maintenance Test & Inspection Scheduled Replacement Condition Findings/History Trend Data & Observed History Location Documents Store Room Stores Reliability Task Repair Shops Failure Causes & Root Causes Cost Design Information Repaired Documents New Equipment Vendors Design Information Cost

Tango | Equipment History Report Click on the line to unfold equipment design data. Click to provide purchase and design warranty details. Click to view repair shop report. Click on the line to unfold location and cause of failure information. Click paper clip icon to view design attachments. · Drawings · Service bulletins · Manuals

Linked Documents Location Procedures Checklist Photos RCM Analysis Test Reports Inspection Documents Equipment Manuals Service Bulletins Drawings Condition Entry Trends Thermography Images Oil Reports Repairs Shop Repair Reports Shop Test Photographs of Damage Condition Comments Letters To/From Vendors Internal Discussions

Inspection Task 1. Condition Assessment Task Management -Vibration -PdMA Testing-Thermography -Ultrasonics-Oil Analysis-Visual Inspection 2. Rounds Logging Task -Trendable Parameters-Observations 3. Test & Inspection Task Management *Requires management of the document* -Breaker Load Test-Transmitter Calibration -Crane Inspection 3. Maintenance Task - based on time -Roll Replacement-Safety Relief Valve Change & Test -Equipment Removal for Cleaning & Refurbishment

Rounds Logging of Parameters & Observations Measurements Gauge Readings Observations Barcode Point ID

Test & Inspection Task Management Many plant tasks require the completion of an inspection or test document to record results and preserve a record of the inspection. Breaker Testing Crane Inspection Transmitter calibration Thickness testing The Plant CMMS typically will not handle the management of these task documents. Often the plant tracks these items in home grown systems. Tango allows the definition of a Test / Inspection task, its interval, Next / Last Performance date and an Excel spreadsheet to be completed for the task.

Data Mining Using Tango Tango has several predefined data mining reports, which allow you to determine what equipment or locations are the least reliable.

Data Mining Report Listing You can use standard mining reports You can add your own custom mining report You can serve the reports via the web

How do the Equipment Measures Look? Data mining reports are drill down reports. You start at the top of a hierarchy and drill down to the levels which seem interesting.

Pick Out the Interesting Items From this level its easy to see that AC Induction motors have an MTBF of less than 3 years based on a population of over 1000 installations – much less than what is considered the industry standard.

You Can Look at Premature Failures According to the data, 65 motors were installed less than 2 weeks –thats over 6% of installed motors

Do We Have a Lemon? We can see that the piece of equipment with Plant Tag 55 was installed twice for just a single day. At this point we would want to look at the equipment history report for this motor to understand why this motor failed twice so quickly.