Introducing TG20:13 Terry Roberts, CADS

Slides:



Advertisements
Similar presentations
OHS Safe in the Knowledge Contact OHS on: The Compliance Consultancy Health Safety and Environmental Management Delivering the vision An incident.
Advertisements

A Free Resource From The presentation is from Mark Sutton For SAFEHANDS Health & Safety Consultants Ltd A Free Resource From
Enabling you for BIM (Building Information Modelling)
1 Introducing TG20:13. 2 Official launch - 22 nd November 2013 at the NASC AGM, Bristol ‘A comprehensive guide to good practice for tube and fitting scaffolding’
These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being.
H&S Asbestos Regulations the Basics Phil Bloomer MSc BSc PGCE Phil Bloomer MSc BSc PGCE Internal Training Manager Internal Training Manager.
HADI HAMAD AL-HAMMAM GROUP
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
Construction H&S Policy & Procedures 1 Health & Safety Policy & Procedures PRODUCT OVERVIEW.
Services System Design & CAD Drawings Full Installation to British and European Standards Property/Structural Assessments Annual Testing and Maintenance.
Drawings and calculations Belgium Scaffolding of higher than 24 metres (highest work floor), unless the manufacturer of the scaffolding equipment used.
Regulatory Compliant Performance Improvement for Pharmaceutical Plants AIChE New Jersey Section 01/13/2004 Murugan Govindasamy Pfizer Inc.
Proven People, Products & Performance Revalidation Issues Surrounding Cryogenic Storage Tanks Cryo Ops 2014 Paul Rowe Wessington Cryogenics.
East Anglia Construction Safety Group Chris Barrett Training Manager Access.
TG20:13 update September Introduction The NASC is continuing to improve TG20:13, the comprehensive guide to good practice for tube and fitting scaffolding.
Temporary Works – What Needs to be Done
Desktop Publishing Unit 7. Unit Layout Five Assessment Objectives Unit Completion end of January – Allowing 2-3 Months contingency work.
RBNetERP or Enterprise Resource Planning is a software that allows companies to integrate all their operations and resources and manage them through one.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management 1.
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
StaffCV Recruitment Management Solution A New Paradigm In Recruiting StaffCV Recruitment Management Solution A New Paradigm In Recruiting.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
Scaffolding Eric [Baaba Koro] & Pankaj & Ben Group
WARNING! This may void your Manufactures warranty: Dissecting Revit Content with the Pros Jarrod Baumann BIM Manager – Tilden-Coil Constructors, Inc. Joel.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
Chapter 15 Designing Effective Output
WHATEVER YOUR ACCESS NEEDS ARE, FROM STANDARD TOWERS, FOLD-EASY QUICK ERECT BASE UNITS, OR OUR SPECIALISED STAIRDECK TOWER SYSTEM WITH OUR EXTENSIVE.
Health and Safety Executive Health and Safety Executive Electrical Engineering HSE Perspective John Madden CEng FIET Principal Electrical Inspector Team.
G041: Lecture 16 Section B Revision Questions
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Implementing TG20:13 by Simon Hughes, Simian Risk
Construction Site Safety Audit System 1 PRODUCT OVERVIEW.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
Conservation by Design… Skip Intro. Protection … The photograph below illustrates a typical archive, books, documents and artefacts stored on shelving.
© 2012 Autodesk Fabricating Sheet Metal William Graham Inventor Designer.
Optimising Services Delivery in the Water Industry
MSc project report Q&A session. Outline You should all be focusing on your report now Some guidance on the report structure Q&A session.
Registering the care sector – next steps Dr Linda Hutchinson Director, Care Quality Commission National Care Association Conference, 21 October 2010.
Introduction At NWB® we pride ourselves on giving our customers excellent service, which includes : Full technical and design service Scheduling service.
Surveillance is The First Step to Solving the Problem.
Introduction & Overview Company Number , registered in England & Wales. December 2015.
CAG - The influence of CAG Systems on Industry and Society Graphic Communication Knowledge & Understanding.
Pressure Systems: Users Guide Introduction This guidance note summarises the key features of the Pressure Systems Safety Regulations (PSSR). Theses Regulations.
Graphical Detailing in Construction and the Built Environment
SAFE SCAFFOLDING PRESENTATION BY: Bechtel Scaffolding Department.,
The Unique Scaffold Trailer Pack From Molecular Scaffold Sales.
Work at Height The New Regulations. BACKGROUND AND APPLICATION.
BPS3413 CONSTRUCTION SAFETY Lecture 6 : Working at Height.
Rick Statham HAS Dip, CMIOSH (Joint Managing Director) Safety & Access Ltd SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
Tools and equipment are an essential part of many industries, providing the means for individuals to do their jobs accurately and proficiently across.
Year 8 Clock Project Design & Technology Design Brief You are to design & make a 3D clock that is aesthetically pleasing and could be sold to a specific.
Introduction to the CPR. Transition from CPD to CPR, key dates TAIEX Workshop INT MARKET CPR and CE marking, Baku, 23 and 24 February 2015.
Working at Height How to comply with the new Regulations.
understanding of the terms;
Quality Brian Russell.
SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance
Things You Should Know About Cantilever Rack
Session 1 Ladders Health and safety Book Pages
CM1847 Migrating AutoCAD Standards to Revit
Who are we? Snowflake Software Inc … … The Data Exchange Company
Chapter 13 Quality Management
SCAFFOLDING CUBE CHALLENGE
Emergency Change NR/BS/LI/413
Code of Practice for Access & Working Scaffolds
Customer background Vibration testing
So why do I need BIMsafe ? PAS was published in February 2018, setting our obligations for embedding Health and Safety information into 3D models.
British Woodworking Federation
Frank Power Ergonomist (Inspector) Health and Safety Authority
Presentation transcript:

Introducing TG20:13 Terry Roberts, CADS

Introduction Thank you for joining us at the launch of TG20:13, the new good practice guidance for tube and fitting scaffolding from the NASC This presentation summarises the purpose of TG20:13 and how it aims to raise awareness of good practice in scaffolding across the construction industry

About CADS Terry Roberts A global construction services company for 40 years 200+ employees including structural engineers, detailers and software developers. Develop and support software for BIM, structural analysis and design, detailing and scaffolding Revit, AutoCAD, CADS RC, Scia Engineer Customer base of 4000+ consulting engineers, contractors and scaffolders across 70 countries Terry Roberts BSc (Hons) MSc (Oxon) CITP MBCS

What is TG20:13? TG20:13 is a guide to good practice for tube and fitting scaffolding It is supplied in 3 books for contractors, designers and operatives plus an electronic guide TG20:13 is underpinned by structural research and is designed to conform to the European standard for scaffolding: BS EN 12811

A brief history The European standard for scaffolding BS 12811-1:2003 replaced the withdrawn British Standard BS 5973:1993 Unlike BS 5973, BS EN 12811 is a performance document for the design of scaffolding by calculation and not a practical guide NASC developed TG20:05 and then TG20:08 in the style of BS 5973 to ease the transition to the European standard NASC and CADS redeveloped TG20:13 as new guidance for the wider industry to eliminate the need for bespoke scaffolding design for typical projects

Requirements for scaffolding design “Strength and stability calculations for scaffolding shall be carried out unless [...] it is assembled in conformity with a generally recognised standard configuration.” Work at Height Regulations 2005, Schedule 3 Part 2 (Additional Requirements for Scaffolding), Regulation 7 TG20:13 introduces standard configurations of scaffolding recognised by the HSE and designed by strength and stability calculations to BS EN 12811 These are TG20 compliant scaffolds

TG20:13 Operational Guide Guidance for TG20 compliant scaffolds is provided in the new Operational Guide: a full colour 226 page book Its guidance is supported by structural research and calculations Guidance is provided for a wide range of common scaffolding structures, including many that have traditionally required bespoke design

TG20:13 Operational Guide Guidance is provided for independent scaffolding, birdcages, loading bays, ladder- access and free-standing towers, and chimney scaffolds Typical features such as bridges, protection fans, inside board brackets, cantilevered platforms and pavement lifts are included Variations including floor-level lifts and double standards provide flexibility Guidance is provided for the first time for structural transom units

TG20 Compliance Sheets TG20 compliance sheets provide a clear summary of the requirements for TG20:13 scaffolding TG20:13 scaffolding has been designed by structural calculation and does not need further design ‘Basic’ TG20 compliance sheets are provided in the Operational Guide The full set is provided in the TG20 eGuide

TG20:13 User Guide A new pocket User Guide has been written for site operatives It clearly summarises the principal rules for TG20 compliant scaffolding in 26 pages Each page is illustrated in full colour and explained with brief text

Structural research The TG20 compliance sheets are supported by new structural research Bespoke research software was developed to prove that ‘BS 5973 style’ scaffolding is Eurocode compliant, which required an extremely accurate computer model Single-bay façade bracing can be used without plan bracing Structural transoms are not required for unclad and ‘basic’ debris-netted scaffolding Guidance is provided for tying to the inner face of the scaffold Triangulating ties with inside boards only in exceptional circumstances

Wind map research The site wind exposure has a significant effect on the scaffold design Extensive research has been completed to study the wind exposure in the UK This enables a simple treatment of wind exposure to be provided in the guidance that is supported by calculation It also allows an automated wind map to be provided in the TG20 eGuide for a refined wind assessment

Transom unit research The NASC has invested in the testing and structural modelling of prefabricated structural transom units In many cases scaffolding with these transoms can be erected without ledger bracing The NASC has developed a minimum structural performance standard and test specification because an applicable British or European standard is not available Manufacturers and suppliers will be able to certify their transoms as TG20 compliant TG20 compliance sheets are available for scaffolds with TG20 compliant transom units

TG20:13 Design Guide The technical guidance from TG20:08 Volumes 1 and 2 has been combined into the TG20:13 Design Guide It provides straightforward design advice in the style of BS 5973 New tables and calculations have been provided for TG20:13 compliant scaffolds The TG20:13 basis for design is explained

TG20 eGuide The TG20:13 eGuide calculates and prints compliance sheets for TG20 compliant scaffolding It allows TG20 to incorporate a wide range of scaffolding configurations without becoming complicated The eGuide accurately calculates safe heights, tie duties and leg loads for TG20 scaffolding

Industry support

Industry support

Thank you Questions?