B/C Ratio Engr. Faisal-ur-Rehman CED N-W.F.P UET P.

Slides:



Advertisements
Similar presentations
Costs and Benefits.
Advertisements

Executive Session Office of Asset Management
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 1 of 16 Discounted Cash.
Some Practice Questions in Engineering Economics
Cross-Border Infrastructure: A Toolkit Financial Analysis Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed.
Time Value of Money – Part I Economic basis to evaluate engineering projects.
Financial Management Series Number 3 Using Net Present Value To Evaluate The Value of Money Over Time Alan Probst Local Government Specialist Local Government.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
Lecture-1 Financial Decision Making and the Law of one Price
Capital Budgeting Capital Budgeting: How managers plan significant outlays on projects that have long-term implications (such as the purchase of new equipment.
INTRODUCTION TO APPLIED WELFARE ECONOMICS AND BENEFIT-COST ANALYSIS.
Engineering Economy Practice Problems
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
MANAGERIAL ACCOUNTING
Capital Budgeting Decisions
ICS 442 Software Project Management
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Profit, Rent,& Interest. Sources of Economic Profit u u reward for assuming uninsurable risks (for example, unexpected changes in demand or cost conditions)
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
Project Selection Three main categories of methods/approaches:  Strategic approach  Analytical approach  Financial methods.
Discounting Future Cash Flows
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Life Cycle Cost Analysis
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Economic Equivalence Lecture No.3 Professor C. S. Park
Warm-Up Review Time Value of Money Calculation of Future Value
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
FDM9 Capital investment appraisal 1 Capital investment appraisal 1.
Capital Budgeting Decisions Chapter 14. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
Advanced Engineering Economy Contemporary Engineering Economics, 5th edition, © 2010.
1 Teaching Net Present Value (NPV) and Future Value (FV) BUS 401 Name Date Instructor.
The Time Value of Money.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Managerial Finance Net Present Value (NPV) Week 5.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Bridge Engineering Lecture 1 A Planning of Bridges Dr. Shahzad Rahman.
Chapter 4 The Time Value of Money
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Economic Analysis: Applications to Work Zones March 25, 2004.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
Example [1] Time Value of Money
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
Capital Budgeting Decisions
Accounts & Finance Investment Appraisal HL Only. Learning Objectives Understand discounted cash flows and apply and analyse the net present value method.
Introduction to Economic Analysis Part 1 February 10, 2014.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
IB Business and Management
Phoenix Convention Center Phoenix, Arizona Introduction to Life-Cycle Cost Analysis Agency Energy ManagerLife-Cycle Cost Methodology Mike Mills, CPA, BEP.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Financial Project Metrics in Feasibility Study
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
ISU CCEE CE 203 Present Worth Analysis (EEA Chap 5)
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
SOLAR ECONOMIC ANALYSIS
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
Copyright © Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Capital Budgeting and Cost Analysis
Project Feasibility Analysis
Life Cycle Cost Analysis
Contemporary Engineering Economics
By Muhammad Shahid Iqbal
Discounting Future Benefits and Costs
Presentation transcript:

B/C Ratio Engr. Faisal-ur-Rehman CED N-W.F.P UET P

Objective To learn the definition of B/C ratio Carry out B/C ratio Analysis

Bridge Economic Analysis/ Life Cycle Cost Analysis (LCCA) Time Costs Stream Benefits Stream ConstructionStage Project Life Project StartDate Project LifeEnd Date SalvageValue

What is Life Cycle Cost? An economic analysis procedure that uses engineering inputs Compares competing alternatives considering all significant costs Expresses results in equivalent dollars (present worth)

Time Period of Analysis Normally equal for all alternatives Should include at least one major rehabilitation Needed to capture the true economic benefit of each alternative Bridge design today is based on a probabilistic model of 100 years

Bridge Economic Analysis/ Life Cycle Cost Analysis (LCCA) Time Costs Stream Benefits Stream ConstructionStage Project Life ProjectStart Date ProjectLife EndDate SalvageValue Costs and Benefits Change over the life of the Project Amount of Money/Benefit accrued some time in future is worth less in terms of Todays money Same is the case with the benefits accrued over time The Problem now is as to How to find the Worth of a Financial Amount in Future in terms of Todays Money This is accomplished by using the instrument of DISCOUNT RATE Problem:

Bridge Economic Analysis/ Life Cycle Cost Analysis (LCCA) DISCOUNT RATE: The annual effective discount rate is the annual interest divided by the capital including that interest, which is the interest rate divided by 100% plus the interest rate. It is the annual discount factor to be applied to the future cash flow, to find the discount, subtracted from a future value to find the value one year earlier.discount factor For example, suppose there is an investment made of $95 and pays $100 in a year's time. The discount rate according the given definition is: Interest Rate is calculated as $ 95 as Base Interest Rate and Discount Rate are Related as Follows

Discount Rate Thus Discount Rate is that rate which can be used to obtain the Present Value of Money that is spent or collected in future Net Present value of Cost incurred = Co = (1 - d) n Cn In Year n Net Present value of Cost incurred = Bo = (1 - d) n Bn In Year n Time CostsStream BenefitsStream Project Life ProjectStart Date Year n Cn Bn Cost/ Benefit Projected Backward Bo Co

What Discount Rate to Use? A first estimate of appropriate Discount rate can be made as follows: Estimate of Discount Rate = Federal Bank Lending Rate – Average Long-term Inflation Rate Note: By subtracting the Inflation Rate in arriving at a Discount Rate the effect of Inflation can be removed from consideration during Economic Analysis The Discount Rate after subtracting the Inflation Rate is also Referred to as the Real Discount Rate Govt. of Pakistan uses a Discount Rate of 6-7% for economic analysis Asian Development Bank uses a Discount rate of 12% for evaluation of projects Discount Rate is less than the Real interest Rate as Governments do not take a purely commercial view of an infrastructure project

Cost Considerations Maintenance and Inspection Cost Initial Cost Costs Present Worth Years Rehabilitation Cost Salvage Value Salvage Costs

Cost Benefit Ratio Formula for Cost Benefit Ratio Benefit To Cost Ratio = Where L = Life Span of the Project in Years d = Discount Rate Bn = Benefit in year n Cn = Cost incurred in year n

Net Present Worth/ Value Net Present Worth/ Value = NPW or NPV is defined as follows: NPW = NPV = Present Value of Benefits – Present Value of Costs Note: If a Number of alternatives are being compared, the alternative that has the highest Net Present Worth is the preferable one and will also have the higher Benefit to Cost Ratio

Present Worth Factor pwf= Present Worth Factor for discount rate d and year n d= Discount rate n= Number of year when the cost/ benefit will occur

Present Worth Analysis Discounts all future costs and benefits to the present: t=L PW = FC + pwf [MC+IC+FRC+UC] + pwf [S] t=0 PW = Present Worth/ Value of the Project FC = First (Initial) Cost t= Time Period of Analysis (ranges from 0 L) MC = Maintenance Costs IC = Inspection Costs FRC = Future Rehabilitation Costs UC= Users Costs S= Salvage Values or Costs pwf = Present Worth Factor

Time Period of Analysis Normally equal for all alternatives Should include at least one major rehabilitation –Needed to capture the true economic benefit of each alternative Bridge design today is based on a probabilistic model of 100 years

Maintenance Costs Annual cost associated with the upkeep of the structure Information is difficult to obtain for a given project Cost varies on the basis of size of the structure (sqft) Best Guess Values –Frequency - Annual –Concrete0.05 % of Initial Cost –Structural Steel0.05 % of Initial Cost

Inspection Costs Should be taken for all alternatives preferably every two years Cost varies on the basis of size of the structure (sqft) and by construction material Best Guess Values –Frequency - Biannual –Concrete0.15 % of Initial Cost –Structural Steel0.20 % of Initial Cost

Future Painting Costs Only applies to structural steel structures but excludes weathering steel Should occur every 20 years Cost varies on the basis of size of the structure (sqft) Best Guess Values –Frequency – every 20 years –Concrete0.0 % of Initial Cost –Structural Steel7.0 % of Initial Cost

Future Rehabilitation Costs The frequency is not only a function of time but also the growing traffic volume and the structural beam system Cost varies on the basis of size of the structure (sqft) and structural beam system Best Guess Values –Frequency First occurrence – Concrete 40 years First occurrence – Structural Steel 35 years Annual traffic growth rate.75 % (shortens rehab cycles) –Concrete20.0 % of Initial Cost –Structural Steel22.0 % of Initial Cost

Salvage Value/Costs Occurs once at end of life of structure Difference between –Removal cost –Salvage value Best Guess Values –Removal cost 10 % of Initial Cost –Salvage Value – Concrete - 0 % of Initial Cost –Salvage Value – Structural Steel - 2 % of Initial Cost

Benefits from a Bridge Monetizable Benefits Time savings to road users Growth in economic activity Saving of Vehicular wear and tear Reduction of accidents if applicable Other Non-Monetizable Benefits Strategic Benefits