Mezzanine Floor.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Roof Trusses Created By M.S.Martin 11/04, reviewed 11/05, reviewed 11/07.
Sectional Assembly and Installation
Dr. Ruth Collins TrinityHaus
Portal Framed Construction
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Timber Framed Structures
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
Competency: Draw Wall Sections
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Walls Ron Gatepain constructionsite.
ICRA Panel System Installation Instructions
NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
TIMBER WALL FINISHES Timber wall finishes can be generally divided into two main group: Timber wall finishes can be generally divided into two main group:
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
QUINN TRUSS OPEN WEB JOIST SYSTEM TECHNICAL DETAILS.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution.
Residential Framing Prints Unit 14.
Lesson Review Roof Trusses M. S. Martin – Nov
Chapter 20 Cladding with Masonry & Concrete
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
Construction and structures srt 251 major assignment louise milton student number:
After the foundations have been completed the walls are set out and construction commences. wall structures.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Rectangular framed structures
Topic C1 Superstructures - walls
Lesson 2.  Estimating Techniques ◦ Internal finishes.
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
Balloon Frame North-American invention, 1833
Energy Conservation in the roof structure. Energy conservation Conservation of energy within a roof structure can be at two different positions i.e. Ceiling.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
Floor Framing Unit 29.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Garden Sheds. Agenda Overview – Next level – good example to teach construction skills – Includes layout skills – transferable to other projects – Orientation.
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Moment Connection Requires Bolts Outside the Flanges
Chapter 23: Structural Drafting
1 Presentation 15: WALL COMPONENT IDENTIFICATION.
Timber Frame Construction 3A9 Construction Technology Dr S Pavía Dept of Civil Engineering Trinity College Dublin.
House Construction.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Learning Outcome Lesson Objective
APPLICATIONS OF TECHNOLOGY
Learning Outcome Lesson Objective
Building Construction
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Competency: Draw Wall Sections
NOVA DESK RANGE.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Secure Resources – Gyproc Plasterboard
Arch205 building construction wall systems- Steel
International Building Materials and components
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
STRUCTURAL TIMBER FRAMING
Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists.
Competency: Draw Wall Sections
Introduction The Gamma Bracing System
Timber Frame Panel with opening Typical panel comprises a series
Introduction The Gamma Bracing System
Presentation transcript:

Mezzanine Floor

Mezzanine Floor Components Steel square hollow section 250 x 250 C channel bottom plate, 150 x 200 Floor Joists 90 x 200 @ 600 centres

Mezzanine Floor Details: Special connection: Floor joist bolted and then welded to 250 x 250 hollow section. Floor Joist Connection: Plate inserted and bolted with M20 bolts. Welded to then increase rigidness. Bottom Plate Connection: Cut at a 45* angle, plate inserted and bolted temporarily and welded to complete connection.

Detail To Canter lever:

Canter lever Components: Cantilevered section of mezzanine floor is lined with insulation as this will be a very thermal conductive area of the mezzanine building. Outer cladding of building is fixed to C section studs of inner of building; see next slide.

Fixing Of Cladding: C section studs are cut to align with top plate of the first floor building and are welded into place. Note all c sections face the same direction. Galvanised steel panels are fixed to the C section studs with metal screws and are sealed with a poly-urethane sealant at the junction of sheets. Insulation is also placed in-between the studs. Plasterboard lines the inside of the studded wall. The steel panel fixing is shown in the external wall frame detailing.

Order Of Construction: 1: Fix all steel hollow sections into position and fix at ground level. 2: Fix steel C columns onto steel hollow sections. 3: Fix floor joists to C sections.

4: Fix into position studs directly under mezzanine floor 4: Fix into position studs directly under mezzanine floor. (Other studs are fixed into position at stage 3) 5: Fix Galvanised steel panels to each other and studs. Seal the gaps with waterproof ‘mastic’ sealant. 6: Once the mezzanine frame has been assembled, line the inside with tongue and groove floor boards on top of wooden battens 45 x 45. Secret nail and glue to adhere to the timber battens.

Demonstrated Application: Show to the left is a picture taken from the Wool stores building, located in Deakin university, Geelong. Shown is a CAD 3D represented model of the actual application as shown on the left. The represented model shows similar a similar method of cladding with a similar fixing technique as explained earlier. This building can be found along Gheringhap St Geelong. Source: http://www.ab.deakin.edu.au/dotcp-submission/vgallery/project%202/leonard_j_project2/default.htm