Administrator Foundation:

Slides:



Advertisements
Similar presentations
THAI TOKO ENGINEERING CO.,LTD.
Advertisements

Marylands Technology Education Voluntary State Curriculum 2007 Bob Gray Center for the Teaching of Technology & Science (ITEA-CATTS) and the University.
Managing Hardware and Software Assets
Cost Estimation Chapter 5 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Strengthening statistical capacity in support of progress towards the Internationally Agreed Development Goals in countries of South Asia United Nations.
Höchstleistungsrechenzentrum Stuttgart SEGL Parameter Study Slide 1 Science Experimental Grid Laboratory (SEGL) Dynamical Parameter Study in Distributed.
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
ROM reviews Saskia Van Crugten
ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the.
Phytosanitary Risk Analysis – the New Zealand Experience
Technical System Options
Zeki Aydan / / 1 of 19 FIT FOR THE FUTURE ???
How Reliability Impacts Shareholder Value Bruce Hawkins, CMRP Management Resources Group, Inc.
Insert image here © SPEC-Soft SAVINGS AND EXPERTISE FOR YOUR PLANT PFS-Suite Life-cycle Tools For Process Automation PFS-Suite TM.
Software change management
Risk Ranking : An Example Process and Method SI-POWER Nuclear Cable Workshop August 6-7, 2012 Richmond, VA Shane A. McManus Senior.
Effectively applying ISO9001:2000 clauses 6 and 7.
Eco 8, Practical intelligence
Evaluating administrative and institutional capacity building
1 Martin Zralý: ENTERPRISE MANAGEMENT CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University.
Workforce Opportunity Services An Overview 1 Dr Art Langer.
1 Application of a Method for Measuring and Developing the Innovation Potential of Small Regions in Hungary Miskolc – Lillafüred György Kocziszky.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
ERP Applications Selection in a Changing Marketplace Evaluation of Software Providers for Midsize Institutions Bill Reed Director, Special Projects Northern.
How to commence the IT Modernization Process?
5. Monitoring and Analysis of TA Progress  Check on the process and progress of the technical assistance provided according to standards set and offer.
Operations Management
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
SUPPLIER VA/VE SUGGESTION FORM ATTN: ___________________________ SUBMITTED DATE: ____________________________ COMPANY: _______________________________________.
Disaster Recovery Plan By Chanrithy Pol ESA Regional Information System Analyst ITIL Certified / Certified Microsoft Solution Expert Share Point / Infrastructure.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
13-Optimization Assoc.Prof.Dr. Ahmet Zafer Şenalp Mechanical Engineering Department Gebze Technical.
- Recent innovative start-up based in Marseille - -Development of Wesby Patented solution - Important experience in the industry -Start : software to communicate.
Sixth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
COMBINED HEAT AND POWER (CHP) FOCUS ON DISTRIBUTED GENERATION Stevens Institute of Technology Mechanical Engineering Department Prof. Siva Thangam Supported.
1 SYS366 Week 1 - Lecture 2 How Businesses Work. 2 Today How Businesses Work What is a System Types of Systems The Role of the Systems Analyst The Programmer/Analyst.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Introduction to Systems Analysis and Design
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry ME 322 Operation and Management of Power Plants.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
“Advanced sorbent solutions for the environment.” © 2003, all rights reserved Demonstration of Amended Silicates™ for Mercury Control at Miami Fort Unit.
Collaboration and Content Customer solution case study The Yaroslavl region Government creates knowledge base of public authorities of the Yaroslavl region.
Role and Components of Project Evaluation
Server Virtualization: Navy Network Operations Centers
1 Eastern Caribbean Geothermal Development Project: Institutional and juridical guidelines Denis LEVY GROUPE T I T A N E Member of.
BIF703 System Analysis & Design (An Introduction) Text Coverage (Bioinformatics: Software Engineering) Pages
Quality Control Project Management Unit Credit Value : 4 Essential
การนำระบบไปใช้ Implementation อ.พัฒนพงษ์ โพธิปัสสา.
Evaluation of EU Structural Funds information and publicity activities in Lithuania in Implementing recommendations for Dr. Klaudijus.
PLANT DATA MANAGEMENT SYSTEM 1329 Stratford Court Del Mar, California Telephone (619) Facsimile (619) Richard H. Hertzberg Larry.
Managing Market Risk. Board of Directors The Boards defines –Market risk –Management policies –Procedures –Prudential risk limits –Review mechanisms –Reporting.
Network design Topic 6 Testing and documentation.
Master thesis Analysis and implementation of monitoring systems of active network equipment. Scientific advisor: Univ. Prof., Dr. Hab., Pavel TOPALA Master.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
SAP GRC(Governance Risk and Compliance)/SECURITY ONLINE TRAINING  Magnific Name : SAP GRC/SECURITY 24*7 Technical support  faculty : Real time Experience.
Road Investment Decision Framework
Submitted by: - Debasis Samantaray 7 th semester, Mechanical Engineering Regd. No: Ajay Binay Institute of Technology 1.
Chapter 6: Database Project Management
Initiating systems development
Clinical Engineering Lecture (3).
Across the entire value chain
Infra program Project outline Helsinki University of Technology
مهارات التدريس الفعال.
EC Strategy, Globalization, and SMEs
SCOPE Commissioned to Build Data Analytics Program
Performance Monitoring of IEC Industrial Gas Turbines
Presentation transcript:

DESIGN AND APPLICATION OF THE POWER PLANT PERFORMANCE MONITORING AND EVALUATION SYSTEM (PERİDSİS)

Administrator Foundation: Customer Foundation: ELECTRICITY GENERATION COMPANY (EÜAŞ) Administrator Foundation: YILDIZ TECHNICAL UNIVERSITY (YTU) Executive Foundations: TUBITAK-MAM

Support Program : TUBITAK 1007 Public Institutions Research Funding Program Start date 01.03.2011 Ending date 01.03.2013 Project duration 24 Months Project budget 2.636.627 TL

WHAT IS PERFORMANCE MONITORING SYSTEM? Performance monitoring system of power plant states evaluation of plant production capacity and efficiency with measured data at that time. Performance monitoring is a system which shows decrease of plant’s and equipment performances to the operator. Performans artışı = Verim, Güç ve Emreamadelikte artış

AIM OF THE PROJECT Aim of this project is to design of a power plant performance monitoring and evaluation system and to implement it to a plant. Power plant performance monitoring and evaluation system monitors mechanical, hydraulic and thermodynamic parameters, which are measured and affects of them to the plant’s performance. System also compares the real performance of the plant with the reference performance criterias.

AIM OF THE PROJECT To inform the operator about the real performance levels of the equipments by using the data taken from monitoring and evaluation system of the plant’s .

AIM OF THE PROJECT To diagnose the problems about the power plant performance. To determine the parameters that cause degradation of the performance. To represent fast, easy and human independent solutions to the operator. To help the operator for generating a planned maintenance program on the equipment basis.

AIM OF THE PROJECT To determine the causes of possible boiler pipe deformations and to increase the power production ability of the plant. Projenin müşteri ihtiyaçlarını karşılamaya yönelik temel amaçları sıralanmalıdır

AIM OF THE PROJECT To create an infrastructure for designing of local power plant monitoring system that is possible to apply for all plants. To maintain a local performance monitoring system which will be installed by Turkish companies.

SCOPE OF THE PROJECT To design a local monitoring and evaluation system for Ambarlı Combined Cycle and Yatağan Coal Fired Power Plants. To implement this system to Ambarlı Combined Cycle Power Plant.

SCOPE OF THE PROJECT Investigating of available performance monitoring systems all over the world. Investigating the relevant standards. Preparing the simulations of the power plants. Determining the equipment which affect the performance and their effect levels. YBT OBT ABT Kazan Ara Kızdırma

SCOPE OF THE PROJECT Determining the performance of equipment at different working conditions Developing an economic model which calculates the cost of the degradation of equipment and all plant. Investigating the existing measurement devices and their locations, and determining the need of new measurement tools. Determining the locations of new measurement tools and planning of their installations. Projenin sınırları çizilmeli, projeye nelerin dahil olduğu ve özellikle nelerin dahil olmadığı vurgulanmalıdır

SCOPE OF THE PROJECT Investigating the causes of the boiler pipe failures and increasing the power production ability of the plant. Preparing a software that will help the operator. This software will; show and compare the expected performance of equipment and overall plant. show the reasons, effects and possible solutions that causes degradation of the equipment. calculate the cost of degradations. Installing, testing, calibrating and submitting of the developed performance monitoring system to the Ambarlı Combined Cycle Power Plant.

OUTPUTS OF THE PROJECT Outputs of the projects: Design of the power plant performance monitoring and evaluation system Software of the power plant performance monitoring and evaluation system Application of the power plant performance monitoring and evaluation system The essential specification for the installation of the system Design guide and algorithms of the monitoring system List of the parameters that affect the plant performance and their impact analyses. Economic analysis for performance degradation of the equipment. Deformation analysis of boiler pipes.

OUTPUTS OF THE PROJECT Designed system will; monitor of the power plant with real time graphics. maintain possibility of performance monitoring on the basis of equipment to the operator. compare the existing performance with expected performance. Diagnose and give the solution offers before the problems come into existence in the plant.

CONTACT: Assoc. Prof. Dr. Hasan Hüseyin ERDEM YILDIZ TECHNICAL UNIVERSITY DEPARTMENT OF MECHANICAL ENGINEERING Beşiktaş/İSTANBUL Tel: +90 212 3832907 e-mail: herdem@yildiz.edu.tr