1 © 2009 APQC. ALL RIGHTS RESERVED. Measurement Assessment Tool to Connect Questions to Measures u Based on “Tree Diagram” format u Can start at different.

Slides:



Advertisements
Similar presentations
My AmeriCorps State and National Reports as an Information Tool
Advertisements

1 Copyright © 2009, Oracle. All rights reserved. B Table Descriptions.
1 UN Coherence: High level monitoring and evaluation approach.
Business Improvement Review Knowledge Understanding Action.
A Process Definition Tool
© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.
3.1D.1 Building the Mitigation Arrangements for the Mitigation Assessment CGE TRAINING MATERIALS - MITIGATION ASSESSMENT MODULE G.
1 © 2009 APQC. ALL RIGHTS RESERVED. PSIOC Name of Process Goes Here SuppliersInputsOutputsCustomer Insert suppliers here Insert inputs here Insert outputs.
Presentation Instructions
Lean Six Sigma Green Belt Training
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 3 SUPPLEMENT Process Mapping and Analysis McGraw-Hill/Irwin.
A GOAL-BASED FRAMEWORK FOR SOFTWARE MEASUREMENT
Indistar® Flag to Re-Assess. Flag to Re-assess Flag to Re-assess is a feature that will tag… indicators initially assessed as fully implemented, indicators.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Measured Quality in Testing Roman Civin, Moravia Worldwide QASight Business Unit LRC-X Conference, Limerick September 14, 2005.
Progress report from work of GECES Sub-group on Social Impact Measurement – 6 June 2013 Rapporteur: Lisa Hehenberger Research Director, European Venture.
Write to Learn K-3 Partner Share With your partner discuss your current understanding and use of writing to learn.
Practice Access Improvement Tools and the introduction of National Practice Access Improvement and Innovation Network Susan Bishop and Jennifer Wilson.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Agenda Teams Responsibilities Timeline Homework and next steps.
RUP Implementation and Testing
Analyze Opportunity Part 1
Project Title Team Leadname Team MembersMember names Process Ownername Championname Insert your company logo here.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
Lean Six Sigma: Yellow Belt Advanced © Max Zornada (2012) Process Objective: Establish current/baseline performance or process and quantify customer requirement.
Participatory Decision Making
C A P A C I T Y Dr. Dewi Nusraningrum, M.Si. CAPACITY PLANNING - Capacity is the maximum rate of output for a facility. - Capacity planning is central.
Africa RISING Programme West Africa – Ghana and Mali East and Southern Africa – Tanzania, Malawi and Zambia Ethiopian Highlands – Tigray – Amhara – SNNPR.
Working Groups on Course Project. Reminder: Project Report Assignment Written text should be 7-10 pages, including the following sections: Introduction.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Measurement Systems. Development of Information Information is necessary for both control and improvement Information derives from analysis of data Data,
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
SOFTWARE PROJECT MANAGEMENT
1 Process Stability Training. Objective Objective: By the end of this lesson, you will be able to use two Process Stability tools for the purpose of determining.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
QOS_ISO/ TS_20021 BSC Balanced ScoreCard QOS Quality Operating System.
INFORMATION X INFO425: Systems Design Systems Design Project Deliverable 1.
Overview of Pre-Connectathon Testing Lynn Felhofer – IHE NA Connectathon Manager.
PCB Take-Aways. Take-Aways  Learn and apply systematic approach for assessing and improving process capability using such tools (Minitab and Excel) as:
“ ” “ ” “ ” Christman, et al., 2009 “ ”
Chapter details to learn: What is natural vegetation? What are deciduous trees?
© 2013 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. The Value Review.
Chapter 11 Data Input and Output. Input Data Capture Forms Data can be collected using a data capture form or questionnaire that is printed on a piece.
© 2013, KDE and KASA. All rights reserved. FOUNDATIONS OF STUDENT GROWTH GOAL SETTING: DETERMINING STUDENT NEEDS SETTING A BASELINE What do my students.
EQ – What is a square root and how are they evaluated? Assessment – Students will write a summary and perform square root operations. Warm Up.
Benchmarking yield Why:  Guidance on crop performance over time cf to potential  Give indication of possible soils constraint  Support better understanding.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
“All measurement is approximate” -- National Math Panel.
MGT 311 Week 1 DQ 2 What type of assessments and evaluations might you use to determine the characteristics of your employees? Does the type of tool used.
EDL 525 Week 4 Individual Traditional Test Rubric Design a rubric that can be used to evaluate the format of a traditional test. Use information from Chapter.
EDU 372 Week 5 DQ 2 To Test or Not to Test To purchase this material click below link ASH/EDU-372-Week-5-DQ-2-To-Test-or-Not-to-Test.
ISCOM 472 Week 5 Learning Team Business Process Improvement Plan and Metrics Paper and Presentation Resources: Need for a Lean Initiatives Paper, As-Is.
LDR 531 Week 3 DQ /LDR-531-Week-3-DQ-2 LDR 531 Week 3 DQ 2 Evaluate how a company structures or uses groups or.
ACC 546 Complete Class ACC 546 Week 1 Individual Assignment Auditing Introduction Letter ACC 546 Week 2 Individual Assignment Beginning the Audit Report.
SQA project process standards IEEE software engineering standards
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
SQA project process standards IEEE software engineering standards
<Project Name> <Name> SOLUTIONS / COUNTERMEASURES
Improvement Methods Overview
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Notes Over 2.1 Function {- 3, - 1, 1, 2 } { 0, 2, 5 }
C++ Productivity Improvements
The new way of IT – Maturity levels
Metrics for process and Projects
Evaluation.
© All Rights Reserved.
The new IT Roadmap planning tool
Creative Programme Design:
For More Details:
Presentation transcript:

1 © 2009 APQC. ALL RIGHTS RESERVED. Measurement Assessment Tool to Connect Questions to Measures u Based on “Tree Diagram” format u Can start at different levels u Use to validate need for measure and set priorities u Shows links between key questions and detailed measures

2 © 2009 APQC. ALL RIGHTS RESERVED. Measurement Assessment: Example

3 © 2009 APQC. ALL RIGHTS RESERVED. Measurement Assessment Key Steps 1.Fill in the Output Y you are evaluating (Option: Start with Step 2 and then identify the Y) 2.Fill in the key questions you have about the process that relate to the Output Y 3.List out all the levels and ways you can look at the data in order to determine specific areas of concern 4.Create specific metrics for each subgroup or stratification factor 5.Review each of the metrics (included in the Y measure) and determine whether or not current data exists. 6.Discuss with the team whether or not these metrics will help to predict the output Y.

4 © 2009 APQC. ALL RIGHTS RESERVED. Measurement Assessment