MR1 Consulting ltd Collaborating for Business Performance

Slides:



Advertisements
Similar presentations
Developing a Decommissioning Acquisition Strategy for
Advertisements

EU BETTER REGULATION Maria Carim, 10 February 2009.
Steve True, Finance Director Sapa Profiles UK 7 th November 2006.
Project Quality Plans Gillian Sandilands Director of Quality
BioEnergy Sustaining The Future (BESTF) SET Plan Conference 8 th May 2013 Dr Megan Cooper, BESTF co-ordinator Joint European Actions In Support of the.
DIPECHO Meetings November 19, 2009 DIPECHO - 2 nd Regional Consultative Meeting for Disaster Risk Reduction in Central Asia : Achievements and GAPs in.
Business Resource Efficiency and Waste (BREW) Programme Mark Atherton Head of Sustainable Development Northwest Regional Development Agency Nick Storer.
Mini-Grant Application: Quality Improvement in the Area of Immunizations Catherine Shoults, M.P.H., Kansas Health Institute Kansas Public Health Conference.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Health and Safety Executive Health and Safety Executive The Health and Safety Executive and Construction Priority Programme.
Christine Pasquire, Nick Blismas, Alistair Gibb
World class services for a world class city London Procurement Strategy Ken Cole Commercial and Procurement Advisor 9 th September.
NATIONAL EVALUATION OF THE SUPPORT FOR EXCELLENCE (SfE) PROGRAMME HOST Policy Research, PO Box 144, Horsham, West Sussex, RH12 1YS Telephone: ;
Hussey Fraser Solicitors
Building Information Management (BIM)
Government Construction Strategy (for England)
Contract CloseOut.
ISACA All rights reserved. Unlocking the Value of Technology Investments Speaker Name/Title Date.
Regions as the driving forces of European competitiveness: From theory to practice Interregional Seminar and Partnership Fair Enhancing university-business.
Strategies for Employer Engagement
CIC Scope of Services Frances Paterson & Tony Broomhead.
Coast2capital.org.uk European Structural and Investment Funds Coast to Capital Shadow ESIF Committee 1 st Meeting, December 5 th 2014.
Construction Industry Council Economic Forum Stephen Dance UNCLASSIFIED.
BIM Management – A Strategic Approach
NATASHA JOLOB Tendering and procurement – Social Firms UK 2 July 2010.
BIM Sarah Birchall and Jo Harris 25 th September 2014.
Road development in an age of austerity Graham Dalton Chief Executive, Highways Agency CIC February 2012.
CLAW/CEW BIM Toolkit for Clients Client Training and
A Prototyping Lifecycle. The Waterefall Model and Prototyping 4 As early as the 1980’s the classic “Waterfall model” of software development was criticised.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
The countdown to 2016: Your action list to be ready
Dan Rossiter BIM Team, BRE Wales 26th of September, 2014
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
ISO Energy Management System Certification
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
BIM Execution Planning (BEP)
The BIM Project Execution Planning Procedure
What was BIM4Real? The Project.
Construction Category Management Planning Version 1.1 (May 2015)
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
The BIM Toolkit Stephen Hamil – March 2015 – v2.0.
2 ND EDITION ROD JONES Copyright © Pearson Australia (a division of Pearson Australia Group Pty Ltd) 2010 PowerPoint presentation to accompany.
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
Trevor Kerr,Business Development Executive Sustainable Development Team Derry City Council 15 th March 2012 Sustainable Development Support
Building Hotel reservation System !!! The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Individual, Interpersonal, and Group Process Approaches
Creating the Government property assets of the future Making sense of a public estates strategy with real local control Andrew Smith, Chief Executive Hampshire.
Hyder BIM Sharing Stephen Xia - Hyder. BIM Definition According to Hong Kong BIM Standards (draft): Building Information Modelling is the process of generating.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Designing products, services, and processes that satisfy both client.
Commissioned review of capacity and capability Q Scope: 1.Understand what workforce shortages are currently affecting operations. 2.Identify solutions.
Good morning, my name is Daniel Agutter,
10.30 Alastair Brown Valtech Val Jonas Risk Decisions Group Paul Bamforth Asta Development Plc 1.30 Kelvin Kirby EPM Consulting Group 2.30.
1 | Nick Nisbet COBie in the UK Federated Building Information Modelling HMG BIM Working Group Technical Coordinator, buildingSMART UKI.
UN Collaborative Programme on Reducing Emissions from Deforestation and Forest Degradation in Developing Countries FAO-UNDP-UNEP April 2008.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Level A System of Systems Agenda Euan Clifford Head of Programme Engineering, Digital Railway Programme.
BIM Terminology Explained BIM Masterclass & Technical Workshop 2015.
Phil Ellis Capacity & Capability Programme Manager Nov 2016
Organization Development and Change
2017 MHA Annual Event - Celebrations and Aspirations
Organization Development and Change
How do we address the skills crisis?
WaterHUB People Worksteam Update 10 July 2018.
Bringing technology and leadership together.
Michelle Papayannakos
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
MER and Decommissioning
Project Overview.
Presented by: Ian Massey
Presentation transcript:

MR1 Consulting ltd Collaborating for Business Performance BS1192:2007 & PAS 1192-2 MR1 Consulting ltd Collaborating for Business Performance

BS1192 The BS was developed and published from practical application of the processes known as Avanti. It has been implemented on a number of projects of various value and the savings of 10% have been sustained on all projects. This is 50% of the target set by the BIM Strategy.

Waste 1976 Building Research Establishment A discrepancy of 10mm in one dimension cost £3,000 and seriously affected the contractors programme. Lack of coordination demonstrates Waste at 10-20%

Waste The UK Government construction total expenditure per annum is £80bn. (2005) Possible min £20bn of waste The European Construction Institute 2003 stated that non-quality in European construction represents E80bn of waste per annum.

Waste The Client buys risk every time he Slide shows the overlay of the architectural construction drawings (Blue) and the structural engineers Construction drawings (Red). Both documents had been checked and signed off as complete and fit for construction. Project measured by third party QS (DLE). The slide demonstrates the problems that needed to be overcome by collaboration The Client buys risk every time he accepts non quality information from his supply teams

Waste The BIM Strategy has set its target at 20-25% of construction cost that is generated because information for construction is: Inaccurate Incomplete And Ambiguous The use of CAD solutions has perpetuated the problem even though it had the capacity to solve the problem.

Level 2 Maturity for BIM

PAS 1192-2

The CPIx Protocol PIP Project Implementation Plan Assess your IT and your Resource capability to deliver the employers requirements

CPIx Execution Plan Building Information Model and Management (BIM(M))   Building Information Model and Management (BIM(M)) Agreed Supply Chain Execution Plan(SCEP) Produce you delivery plan and agree with your supply chain and the second and third tiers

CIC Scope of works:2012 Alignment of the Industry Institutional deliverables . Levels of Model Detail appropriate for the purpose NOT high detail because we can. Levels of Information appropriate to the scope stages and the Employers Information Requirements (EIR).

Supply Chain- Client

Questions