HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,

Slides:



Advertisements
Similar presentations
Clock and Control Status Matt Warren, on behalf of Martin Postranecky.
Advertisements

XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
XFEL C+C HARDWARE : REQUIREMENTS 1) To receive, process and store Timing Signals from TR ( Timing Receiver ) in same crate : - 5 MHz Bunch CLOCK - Bunch.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 22 October 2009 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL Meeting, RAL 20 January 2011 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
Bart Hommels for the CALICE-UK groups Data acquisition systems for future calorimetry at the International Linear Collider Introduction DAQ.
Off-detector & Software development of DAQ System for the EUDET calorimeters Tao Wu On behalf of CALICE-UK Collaboration.
GCT Source Card Status John Jones Imperial College London
Clock & Control Card Status 31 March 2009 Martin Postranecky / Matt Warren.
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea Status of the Data Concentrator.
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
ESODAC Study for a new ESO Detector Array Controller.
11 May 2007UK DAQ Status1 Status of UK Work on FE and Off-Detector DAQ Paul Dauncey For the CALICE-UK DAQ groups: Cambridge, Manchester, Royal Holloway,
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
CALICE - DAQ communication & DAQ software V. Bartsch (UCL) for the CALICE DAQ UK group outline: options for network / switching clock control: SEUs DAQ.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
Update on the Data Acquisition System development in the UK Valeria Bartsch, on behalf of CALICE-UK Collaboration.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
DOOCS DAQ software for the EUDET prototype Valeria Bartsch (UCL) Andrzej Misiejuk (RHUL) Tao Wu (RHUL)
5 Feb 2002Alternative Ideas for the CALICE Backend System 1 Alternative Ideas for the CALICE Back-End System Matthew Warren and Gordon Crone University.
7 th March 2007M. Noy. Imperial College London CALICE MAPS DAQ Project Summary.
Bart Hommels for the UK-DAQ group Status of DIF, DAQ for SiW Ecal DIF status LDA status DAQ (ODR & software) status CALICE / EUDET DAQ – DESY.
Development of the DAQ software for the technical prototype: Status & Outlook Valeria Bartsch UCL.
Status of CCC CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
Data Acquisition Systems for Future Calorimetry at the International Linear Collider Matt Warren, on behalf of CALICE-UK Collaboration.
Engineering & Instrumentation Department, ESDG, Rob Halsall, 24th February 2005CFI/Confidential CFI - Opto DAQ - Status 24th February 2005.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Future DAQ Directions David Bailey for the CALICE DAQ Group.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
JRA3 DAQ Overview Matt Warren, on behalf of EUDET JRA3 DAQ Groups. Please see the following talks from the JRA3 Parallel Session for more detail: DAQ and.
David Bailey University of Manchester. Overview Aim to develop a generic system –Maximise use of off-the-shelf commercial components Reduce as far as.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
11-13th Sept 2007 Calice 1 LDA Protoype Board A Xilinx Spartan board. Will be the basis of a prototype LDA using additional IO boards to interface.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
Marc Kelly, Maurice Goodrick, Bart Hommels CALICE / EUDET DAQ – DESY CALICE (ECAL) / EUDET DAQ: DIF and LDA Status.
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
DAQ PC CALICE DAQ architecture Detector Unit : ASICs DIF : Detector InterFace connects Generic DAQ and services LDA : Link / Data Aggregator – fanout /
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
Maurice Goodrick, Bart Hommels CALICE DAQ, UCL DIF & intermediate board Intermediate board: Power distribution (& pulsing?!)‏ Clock fanout Level.
CALICE Readout Board Front End FPGA
CALICE DAQ Developments
Status of the ODR and System Integration 31 March 2009 Matt Warren Valeria Bartsch, Veronique Boisvert, Maurice Goodrick, Barry Green, Bart Hommels,
C. de La Taille IN2P3/LAL Orsay
Valeria Bartsch UCL David Decotigny LLR Tao Wu RHUL
CALICE/EUDET Electronics in 2007
UK ECAL Hardware Status
State of developments on Readout interface of European DHCAL
Clock & Control Timing and Link 29 July 2008 Matt Warren Maurice Goodrick, Bart Hommels, Marc Kelly, ABSTRACT: A data acquisition system is described.
Clock & Control Timing and Link 29 July 2008 Matt Warren Maurice Goodrick, Bart Hommels, Marc Kelly, ABSTRACT: A data acquisition system is described.
Presentation transcript:

HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren, UCL Matthew Warren, UCL 22 March 2007 EUDET/CALICE DAQ Overview

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 2 PC/s Ideal DAQ Structural Overview Detector ASICs on e.g. ECAL slabDetector ASICs on e.g. ECAL slab Front-End (FE)Front-End (FE) -FE-Interface (DIF): Detector specific -FE Link/Data Aggregator (LDA): Generic Data-link (FE to Off-Detector Receiver)Data-link (FE to Off-Detector Receiver) CCC-link (Clock+Control+Config to FE)CCC-link (Clock+Control+Config to FE) DAQ PCDAQ PC -Off-Detector Receiver/s (ODR) -Drives CCC-link -Data Store LDA CCC-link ODR Store Data-link DIF ASICs FE DIF ASICs DIF ASICs …

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 3 FE Structure Detail We have 2+ types of detector to readout. Divide the FE into a 2 part, tiered system 1) Detector Interface module (DIF) 1) Detector Interface module (DIF) -Detector specific interface -Includes power connectors -‘Local’ systems (e.g. stand-alone clock) -Debug connectors 2) Link/Data Aggregator module 2) Link/Data Aggregator module (LDA) (LDA) -Collects data from many ‘DIF’s -Drives data Off detector link -Receives and distributes C+C -FPGA Development board -BUT: We would might like to read-out slabs individually first… Link/ Data Aggregator PC ECALSlab ECAL DIF Link/ Data Aggregator PC HCALLayer HCAL DIF HCALLayer ECALSlab ECAL DIF C+C Fanout

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 4 Data-link (+CCC) Use most common networking fibre-optics:Use most common networking fibre-optics: -Multimode with LC connectors -SFP (mini-GBIC) interfaces -1Gbit rate (maybe tuned to multiple of machine freq.) -Ethernet Control up-link NOT via fibre, initially.Control up-link NOT via fibre, initially.

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 5 Off-Detector Receiver (ODR) PCI Express CardPCI Express Card Virtex 4, FX100 FPGA (big!)Virtex 4, FX100 FPGA (big!) Hosts opto-linksHosts opto-links -2xSFP, 2xHSSDC2 on board Source of C+C (Control link)Source of C+C (Control link) -Initially copper (LVDS) -Later fibre Will use external clock and sync signals for multi-board synchronous operationWill use external clock and sync signals for multi-board synchronous operation

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 6 ODR(2) - Status Firmware AND software well underway: PCIe interface DONEPCIe interface DONE Register read/write DONERegister read/write DONE DMA access DONEDMA access DONE Ethernet InterfaceEthernet Interface IN-PROGRESS IN-PROGRESS DDR2 Interface IN-PROGRESSDDR2 Interface IN-PROGRESS Linux driver DONELinux driver DONE Optimised Disk StoreOptimised Disk Store IN-PROGRESS IN-PROGRESS Manager Software IN-PROGRESS IN-PROGRESS Performance profilingPerformance profiling IN-PROGRESS IN-PROGRESS Clock and Control UplinkClock and Control Uplink NOT-STARTED NOT-STARTED Ethernet Interface DDR2 Interface PCIe Interface Control/ Status Reg. Block Internal RAM Test Data Gen Arbiter Driver Manager Software Firmware

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 7 Detector Interface (Cam, IC) -Spec + hardware DIF to Link/Data Aggregator (Cam/Man) -Spec + hardware Data aggregate, format (Man) -Hardware + firmware LDA to ODR opto-link (Man, UCL) -Hardware + firmware ODR (RHUL, UCL, Cam) -firmware ODR to disk (RHUL) -Driver software Local Software DAQ (RHUL) Full blown Software DAQ (RHUL, UCL, [IC]) LDA PC ECALSlab DIF ODR Driver Opto Opto UK Read-out work (ECAL FE)

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 8 Clock + Control, Integration Keep it simple! -System synchronising signals distributed -All data tagged with common ‘timestamp’ Clock Control (Train- start, Sync) PC ODR PC ODR Fanout (TLU?) LDA Config Slab Config LDA Slab Slave outMaster In

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 9 ‘TLU’ Requirements Lets assume 32 ‘Slabs’. -Each Slab needs: Clk; Train, (Trigger?) But could use LDA here. At 8 slabs/LDA = 4 LDAs With minimum 1 LDA/ODR = 4 ODRs -Each ODR needs: same + Fast Control(data)  4 Signals Clock, Train, Trigger, Control  Fanout of 32 slabs + 4 LDA + 4 ODE =40, OR more likely 4 LDA + 4 ODR = 8. OR more likely 4 LDA + 4 ODR = 8. -TLU acts as Master or Slave for signalling -TLU generates signals stand-alone -We presume to use LVDS everywhere. ?? Do we try to use the TLU for fanout, or just as a ‘machine’ interface?

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 10 Extra: Optical Switch

HEP UCL 22-Mar-2007EUDET/CALICE DAQ Overview 11 Optical (Layer-1) Switching Part of the UK CALICE is to evaluate the use of a “layer-1” switch. 1) DAQ PC failover - Redirect data to spare unused DAQ PC on the fly 2) “Router” - Can change data destination per bunch-train. Regulate load by sending data directly to free resources 3) Programmable optical patch panel (large installation) Manufacturers offering similar products, in same price range e.g. Glimmerglass, Polatis - difficult to differentiate between them Decided on PolatisDecided on Polatis -can switch dark fibre (i.e. not MEMS based) -Multimode fibre capable -Fastest switching time (20ms) 16x16 array with 50 μ m multimode LC connectors16x16 array with 50 μ m multimode LC connectors