The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

COST EFFECTIVE MASS HOUSING TECHNOLOGY
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
CONSTRUCTION DEFECT RECOVERY FROM SURETY: THE SINKING BUILDING TALE PRESENTATION AT DES CLIENT WORKSHOP OCTOBER 8, 2014 BOB BOURG, DES CLAIMS AND DISPUTES.
Above Ground Storage Tanks &
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Architectural CAD I – IM230
WESLEYAN P BID PACKAGE #19
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Common Architecture Terms. Fenestration The design and placement of windows in a building.
Objectives : ANALYZE home maintenance techniques.
1 New Water Intrusion Prevention and Wind Resistant Construction Mercedes Homes A presentation by Stuart McDonald Corporate Vice President.
Framed Building Structure Lectured By: Ms. Noorhidayah Sunarti 15/4/2010.
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
Unit A3-12 Insulating Agricultural Structures Problem Area 3 Construction Systems.
The Ariel Assembly Instruction By Laser Dollhouse Designs.
Curb Appeal: Small Investments with Attractive Returns August 21,2014.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
R2000 Houses Energy Saving Features. High Performance Windows Advanced Wall Systems Integrated Heating.
November 19, 2010 To contact the ‘publisher’ or to receive an copy of this update, please write to John Matranga at Volume 48,
Walls of Structure Decreasing the Amount of Heat Exchange.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Objective 9.01: EXPLAIN the benefits of interior home care.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Coil Construction File name 18vessel. Making slip n Viscosity n Water.
Introduction Joshua Castillo Construction Management Center for Creative and Performing Arts High School (CAPA High School) Pittsburgh, Pennsylvania.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
The four basic types of structures are :
High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Drafting 2 (Arch) Quiz Review #5
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Exterior Maintenance and Cleaning
White Pigeon Community Schools
OSHA’s NEW Walking-Working Surfaces
Woodland Public Schools
Foundations of Technology Construction
Major Steps In Building a SFR
Approaches to Historic Bridge Rehabilitation Case Study #3
External Walls Carl James.
UT House Medics 2017 About the House – Mrs
Objectives : ANALYZE home maintenance techniques
Unit 1 Weather Resistance
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
“Planning and Scheduling a SIMPLIFIED Construction Project” BCT458 September 27, 2009 Group Signatures Taggart.
RISER PROJECT L, m, l/m kitchen.
G kitchen What makes you special!
Details These are drawings of specific elements where the designer wants to provide more detailed information than can be seen in the larger drawings.
J bathroom/ hi bedroom/ I kitchen
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Foundations of Technology Construction
n/o back to back kitchens
RISER PROJECT F bathroom.
C bathroom/AB and B Kitchens
Minuteman Vocational Technical Regional High School Progress
Exterior Maintenance and Cleaning
Minuteman Vocational Technical Regional High School Progress
Mount Vernon Community School
Community Practice Asset Management.
Presentation transcript:

The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)

Work Completed High priority repairs to structural beams Tuck pointed brick mortar & replaced sealants. Balcony rails replaced Applied traffic bearing coating to balcony concrete slabs and painted soffits Penthouse Window Replaced

Structural Beams Removed bricks necessary to access beams identified as high priority in overall building evaluation Removed & addressed any corrosion Repaired the beams as per Construction Insight Engineering specifications Replaced bricks

Tuck Pointing & Building Sealants Removed and replaced brick mortar Repaired and replaced the necessary through wall flashing Removed and replaced building sealants such as caulking and glazing

Balcony Rails Instead of repairing and repainting the existing rails, the Board was able to achieve the replacement of all balcony rails with new weather and fade resistant railings. This was done without exceeding the original budget for the project.

Balconies A traffic bearing, non-slip coating was applied to the concrete slabs of each balcony All soffits (the underside of each balcony) was scraped, primed and painted A drip edge was added to the bottom of each balcony to prevent water run off from entering the balcony below

Penthouse Window Replacement All windows on the penthouse level have been replaced with windows similar to those that will be used in the units.

Completed Work – Final Costs Concrete Protection (Plus 3 Change Orders) $486, Construction Insight $49, Advanced Window (Penthouse): $29, Total Completed: $564,870.56

Upcoming Work Window and Slider Installation Schedule and Approach Resident/Owner Responsibilities Budget

Window and Slider installation All windows and sliders for each unit will be removed and replaced with commercial grade, high efficiency windows and sliders This includes the entire window and slider systems – panes, frames and sealants

Schedule & Approach Work will begin in March with a generalized installation schedule posted Individual unit notices will be provided approximately two weeks in advance of the units start date Installation will be conducted one floor at a time beginning with the 6 th floor and the front of the building

Schedule & Approach Approximately units will be accessed at a time Any installation started will be completed the same workday No openings will be left exposed overnight

Schedule & Approach Each unit will be video taped to document the contents and condition of the unit before and after the work is completed Video tapes will be retained for a short period of time in a secure location All video tapes will be destroyed after the project is complete

Schedule & Approach Construction Insight Engineers will be present for the entire duration of the project with Advanced Windows being the contractor A notice will be posted in the building for the Association to hire a temporary employee to observe and monitor the window installation on behalf of the Board.

Resident/Owner Responsibilities Prior to installation each unit resident must: clear a 3 foot path from the entry door to each window and slider Clear an area of 3 feet around each window and slider Remove all items from the balcony Remove all window treatments and hardware (blinds, curtains, hardware etc)

Budget Advanced Windows: $528, Construction Insight: $52, Total: $581,762.50