Presented by Glenn Tate IAPMO R&T Oceana Pty. Ltd.1.

Slides:



Advertisements
Similar presentations
McLeods Breakfast Forum 2 October 2013
Advertisements

DEFINITION Insurance policy is an evidence of insurance issued to the insured by the insurer, an evidence of lodging and accepting a claim and an important.
Subcontractor Electrical Safety & NFPA 70E
Orthogonal Projection
Events occurring after the end of the reporting period
Author: Graeme C. Simsion and Graham C. Witt Chapter 4 Subtypes & Supertypes.
Presented to By. 2 3Terms and definitions 3.7 competence ability to apply knowledge and skills to achieve intended results.
1 Welcome Safety Regulatory Function Handbook April 2006.
International Organization
Conformity Assessment Practices of the Trinidad and Tobago Bureau of Standards (TTBS) Mr Terrence Awai Head, Certification Division TTBS.
THE CERTIFYING AUTHORITY
NPA WG : Single and multiple releases
05 July 2007Cologne NPA WG66.009: Type and Group Ratings Juan Anton.
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
International Telecommunication Union Geneva, July THE CERTIFICATION AND APPROVAL REGULATION FROM ANATEL - BRAZIL Julio Cesar Fonseca Technical.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
0 - 0.
Supporting further and higher education JISC VRE Programme Quality Planning 12/01/05.
An Introduction to Quality Assurance in Analytical Science
COBIT® 5 for Assurance Introduction
Lesson Two – Classification of Buildings and Acceptable Construction
Effectively applying ISO9001:2000 clauses 6 and 7.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
AS9102 First Article Inspection Report
Comparison GHTF/SG5/N5:2012 vs. MEDDEV 2.7/3:2010
TRAINING FOR THE WEIGHTS AND MEASURES OFFICIAL COURSE CURRICULUM MODULE 1Introduction MODULE 2Laws & Regulations MODULE 3Enforcement Procedures MODULE.
Test plans. Test Plans A test plan states: What the items to be tested are At what level they will be tested What sequence they are to be tested in How.
FAA Office of Airports Airport Fuel Storage and Handling
Alternate Material and Code Reports. This module will highlight the history of the model codes How the building codes treat alternative materials Alternative.
HEADING size 54 Arial TEXT size no small than 28 Arial SUB-HEADING size 44 Arial AS/NZS 4020 Testing of products for use in contact with drinking water.
Internal Control–Integrated Framework
FSC Chain-of-Custody & Controlled Wood Update for Audits November 2007.
Test B, 100 Subtraction Facts
Modular Urban Transport Safety and Security Analysis 1 SiT - Safety in Transportation 2012.
Installation Requirements Paperwork Trail Difficulties
1 Permits and Certificates CITES Secretariat. 2 Overview Permits and certificates Normal procedures.
The International Security Standard
Australian Guidance Document Number xx Cathy Thomas Professional Representation OT Australia WA.
Julian Vollans – The Noberne Group September 20 th 2012 DOORSETS + 3 RD PARTY ACCREDITATION = THE SAFE SOLUTION.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
EQUIPMENT VALIDATION.
Third Party Certification & The Q-Mark Scheme. What is third party certification? Independent process of certifying that a manufacturer continues to comply.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
Introduction to PPDs Regulatory requirements and rationale.
How ISO Standards Relates to Usability:. INTRODUCTION/ Before we can relate the ISO standards to usability, first we need to know what the meaning of.
1 Conformity Assessment Schemes Presented by Andrew Kwan ITU Consultant Conformity and Interoperability Training for ARB Region on Type Approval Testing.
How to pass the test Stephen Shorrocks David Starr.
Regulation 16B As referenced in Approved Document B 2006.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Codes, Standards & Conformity Assessment GP Russ Chaney CEO, The IAPMO Group
Partners in Compliance Local Authority Building Standards Scotland Bob Renton FRICS Consultant to LABSS Honorary President LABSS.
Detail and Assembly Drawing
WHY CONFORMITY ASSESSMENT?. What is conformity assessment?  Conformity assessment is the name given to processes that are used to demonstrate that a.
© Siemens AG 2014 Alle Rechte vorbehalten.siemens.com/lowvoltage New Legislative Framework (NLF) Sektor Infrastructure & Cities | Division Low and Medium.
FOURTH EUROPEAN QUALITY ASSURANCE FORUM "CREATIVITY AND DIVERSITY: CHALLENGES FOR QUALITY ASSURANCE BEYOND 2010", COPENHAGEN, NOVEMBER IV FORUM-
SECTION 8 WATER STORAGE TANKS 8.1 SCOPE OF SECTION. This section specifies requirements for the storage of water. 8.4 TANK DESIGN Water storage tanks.
Plumbing & Pools Presenters: Phil Denman. I need a plumbing approval for? -any work on new buildings -any work associated with trade waste -plumbing and.
WATERMARK CERTIFICATION -THE “PROCESS” 1 BPAA Conference Friday 31 July / Saturday 1 August.
SAFETY AND INFRASTRUCTURE REQUIREMENTS FOR TEL-2 INSTALLATION IN THE LAB Paolo Magagnin (BE-BI-ML) 24 – April
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Cross Connection Survey Training
2017 National Backflow Prevention Conference
IECEx Certification Scheme BUXTON - England Industry Seminar 5th October, 2005 IEC Ex in Australia & Asia - an Industry Perspective.
BS EN 10204:2004 Metallic Products – Types of inspection documents
BS EN 10204:2004 Metallic Products – Types of inspection documents
Presentation transcript:

Presented by Glenn Tate IAPMO R&T Oceana Pty. Ltd.1

2

3

4

5

PART A2 ACCEPTANCE OF DESIGN AND CONSTRUCTION  A2.1 Suitability of materials and products  (a) Every part of a plumbing or drainage installation must be constructed in an appropriate manner to achieve the requirements of the PCA, using materials and products that are fit for the purpose for which they are intended.  (b) Materials or products listed in Table A2.1 which are used in plumbing or drainage installations must be certified and authorised.  (c) Product certification and authorisation must comply with the procedures set out in Part G1.  (d) Materials and products intended for use in contact with drinking water must comply with AS/NZS  (e) Any new or innovative material or product must be assessed, certified and authorised, if required, in accordance with Part G1 prior to their use in a plumbing or drainage installation. IAPMO R&T Oceana Pty. Ltd.6

7

G1.4 Authorisation A material or product that is listed on the WaterMark Product Database and is marked in accordance with the WaterMark Certification Scheme is recognised by authorities having jurisdiction as being authorised for use in a plumbing or drainage installation. IAPMO R&T Oceana Pty. Ltd.8

9

G Materials and products with a consequence score of more than 4 (Certification Level 1)  For materials and products with a consequence score of more than 4 to achieve certification to WaterMark, they must be certified as fully complying with an approved specification through product testing.  Full product testing for Certification Level 1 must be certified as having been carried out in a recognised testing laboratory by the WMCAB.  The manufacture of the material or product must be certified by the WMCAB as having been carried out in accordance with a Full Quality Assurance Program (as set out in ISO/IEC Guide 67) appropriate for the material or product.  In addition, the approved user must comply with the conditions of the WaterMark licence.  The material or product is granted certification to use the WaterMark if all of the above requirements are met. IAPMO R&T Oceana Pty. Ltd.10

There are two (2) levels of Certification. WaterMark Level 1 – Requires that products comply with a specific Australian or International Standard or other suitable published document and are certified under a program in accordance with the principles of ISO/IEC Guide 67, System 5. WaterMark Level 2 – Requires that products comply with a specific Australian or International Standard or other suitable published document and are certified under a program in accordance with the ISO/IEC Guide 67, System 1b. IAPMO R&T Oceana Pty. Ltd.11

IAPMO R&T Oceana Pty. Ltd.12

IAPMO R&T Oceana Pty. Ltd.13 NOTES: 2. The microbial test is undertaken for products that contain non-metallic wetted components. Testing of the products is usually conducted at 30ºC and covers products that operate at less than 40ºC (see Appendix E)

B1 REQUIREMENT FOR CERTIFICATION MARKING Plumbing and drainage products used in Australia and supplied under the WMCS should bear the WaterMark once they have been certified by the CAB. Applying the WaterMark to the product provides evidence that the product is - (a) manufactured under a nationally recognized certification scheme and certified by a CAB; (b) supplied and warranted by the manufacturer as complying with the appropriate Specification; and (c) easily recognized by the regulator, tradesmen, distributors and retailers as being certified. The application of a WaterMark on a plumbing and drainage product is a requirement under various Australian State regulations. For most applications, the shape and styles of the WaterMark are shown in Figure B1. IAPMO R&T Oceana Pty. Ltd.14

Due to the complexity of products, there are many different ways of positioning the certification mark on products (see Figure B2). Wherever possible, the CAB will provide guidance and consider any proposals put forward. Some of the main criteria in positioning the WaterMark are as follows: (a) The WaterMark shall be clearly visible on the finished product so the installer is aware that the product is certified. (b) The positioning of the WaterMark shall not mislead the product user to believe the product is certified for other than the applicable Standard/Specification. (c) Where components are combined, the WaterMark shall be positioned to clearly indicate that the complete assembly is certified. (d) Marked components should not be incorporated or combined in such a manner as to misrepresent certification of another product. IAPMO R&T Oceana Pty. Ltd.15

IAPMO R&T Oceana Pty. Ltd.16 ATS C of C 9999 ATS C of C 9999 Figure B1 NORMAL AND SPECIAL PRESENTATIONS

 3.1 GENERAL This Section specifies requirements for the design and manufacture of backflow prevention devices.  3.2 EFFECTS ON WATER Backflow Prevention devices shall comply with AS/NZS A sealing factor of 0.01 shall be applied for devices DN 100 and above and 0.05 for devices <DN 100, except for HCVB and BDDC devices which shall be tested as end-of-line fittings IAPMO R&T Oceana Pty. Ltd.17

A1 SCOPE This Appendix sets out the means by which compliance of each device with this Standard has to be determined by a manufacturer under the WaterMark product certification scheme. A2 RELEVANCE The long-term performance of plumbing systems is critical to durability of building infrastructure, protection of public health and safety, and protection of the environment. A3 PRODUCT CERTIFICATION The Purpose of product certification is to provide independent assurance of the claim by the manufacturer that products comply with this Appendix. The certification scheme serves to indicate that the products consistently conform to the requirements of this Appendix and the sampling plans of each device. The frequency of the sampling and testing plan is detailed in Paragraph A5, shall be used by the Conformity Assessment Body. Where a batch release testing program is required, it shall be carried out by the manufacturer as detailed in this Appendix for sampling and frequency plans. IAPMO R&T Oceana Pty. Ltd.18

IAPMO R&T Oceana Pty. Ltd.19 TABLE A17 MINIMUM SAMPLING AND TESING FREQUENCY PLAN – TYPE TESTS REDUCED PRESSURE ZONE DEVICE (RPZD)

IAPMO R&T Oceana Pty. Ltd.20

IAPMO R&T Oceana Pty. Ltd.21

IAPMO R&T Oceana Pty. Ltd.22

IAPMO R&T Oceana Pty. Ltd.23

IAPMO R&T Oceana Pty. Ltd.24

IAPMO R&T Oceana Pty. Ltd.25

IAPMO R&T Oceana Pty. Ltd.26

IAPMO R&T Oceana Pty. Ltd.27

IAPMO R&T Oceana Pty. Ltd.28

IAPMO R&T Oceana Pty. Ltd.29