A Step Ahead ( into HFO Generation)

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
Advertisements

APPA CEO Roundtable Phoenix, AZ March 15, 2011
INVESTMENTS IN POWER SECTOR
Operations Management Maintenance and Reliability Chapter 17
Flexible Budgets, Variances, and Management Control: II
Successful small and medium scale wood heating Key stakeholders Workshop New Forest, England, 9-10 March, 2011 Jyrki Raitila VTT Technical Research Centre.
Concession Agreement Tirana International Airport Nene Tereza
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Demand Response May 9, United States 40 Million People 8 States Canada 10 Million People 7 Provinces Cost $6.0 to 10.0 Billion.
Mestek Overview Founded in Westfield, MA in 1946 as Sterling Radiator by John E. Reed 4 employees in a rented garage Produced only hydronic finned-tube.
“What do you do, when you are ahead of the rest?”
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
An Impact Analysis of Electrifying Florida’s Public Buses
March, 2010 OVERVIEW April, Scrap / Recycling Steel Mills Downstream Gerdau Ameristeel | Efficient vertical integration.
Capitalizing on Past To meet Future Growth
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
A Path breaking Technology for Network Maintenance and Optimization
1 © GDC Group Heat Solutions. Source; House Hold budget survey (2004/2005) Irish Heating Market.
Solutions for Flaring Reduction Dual-Fuel & Gas Engines
An Application of Linear Programming Lesson 12 The Transportation Model.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Capacity Planning For Products and Services
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
LIFETIME RESPONSIVE DESIGN Towards design and building technologies for development of structures following progressing technological innovation, changing.
Jordan Renewable Energy Law & Energy Efficiency Fund
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Capacity to Customers (C 2 C)- Review of Standards – Accommodating Responsive Demand in ER P2/6 24 th January 2013.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Fujitsu Siemens Computers at a glance Georgios Nikolopoulos Sales Manager November 2008.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
Power Generation In Singapore Presented By CHAN Y K Commercial Specialist Commercial Service, Singapore.
Caterpillar Global Petroleum MaK Product Introduction
Energy Efficiency Lighting Sponsor: Presentation by: Allan Grant, VP Business Development, Corvus Energy Topic:Advanced Energy Storage Solutions as a Key.
Content of the Presentation
MBA (Trimester) Term V Module Title : Project Finance and Management
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Business Plan Presentation. Mission “To deliver a revolutionary new energy system by producing a unique pump that makes the most efficient use possible.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Municipal Solid Waste Power Plant Project DL ENT Co., Ltd.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
SCOPE OF THERMAL POWER PLANTS IN INDIA SUBMITTED BY GUIDED BY SURENDRA KUMAR AHIRWAR R.L. SHREE MALI.
歐洲復興開發銀行採購商機 台灣歐銀業務發展辦事處 楊雅雯經理. 3,468 Projects 59.4 billion EURO – private sector 15.8 billion EURO – public sector 33 countries of operations.
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS
Uniper Energy Services
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
MUKALLA IRON & STEEL PP 3D-VIEWS
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Your partner with over 70 years of experience
Presentation transcript:

A Step Ahead ( into HFO Generation)

Site Location MUKALLA REPUBLIC OF YEMEN

Power Plant Site (Google Layout)

Project Set Up From Feasibility /Load /Site study – To Customized Engineering Turnkey Project Execution …….

Table of Contents Brief Project Description Stakeholders Few Site Progress Photos Current Site Progress Report

Brief Project Description Hadhramout Investment Power Company Limited (“HIPC”) is a public limited company principally sponsored by Sabson Group (75% of shareholding), Al-Rehab Group and Arab Fund together (25% shareholding) (“Sponsors”) for undertaking power generation projects in the Republic of Yemen. The Total Cost envisaged for the entire Project is 90 Million Euro. The total power plant capacity under installation is 75 MW of gross electrical power at Al-Mukalla – Industrial District in the Republic of Yemen ,heavy furnace oil fired based fuel. The Construction activities for 52.5 MW comprising of 7 engines is under way in full swing and further extension by another 22.5 MW (3 more engines) is envisioned for April 2010. The envisaged project will supply electricity to the national grid & partly to Sabson Groups’ – Integrated Steel Plant (currently in progress) under contractual agreements. The Engines are identical of Wartsila Make , Finland, Type 18 V 32 , Quantity 10 Nos. Electrical Power Guarantee at Site Conditions is 7500 kWe (75 MW) Minimum Electrical Power guaranteed by Wartsila at Generator Terminals is 7125 kWe (71.25 MW). 3 % can be considered for Ancillary Power Usage (Designed at Site Ambient conditions of 40 deg cent). Wartsila is solely responsible for ensuring its scope of supply comprises all Equipment within the specified battery limits that is patently indispensible for a complete operating power plant in accordance with Wartsila standards.

continued The main Supply of Engine and its associated Systems & Auxiliaries is Wartsila Scope of Supply. The BOP along with Installation is entrusted to Hideleco, Egyptian Construction Company, the Contractors for this Project. The Consultants chosen for this Project is Dastur Engineering International GmbH, Germany having its office in India. Operation & Maintenance will be managed by the OEM ( Engine Supplier), hence yielding high consistency in the long run. High Reliability, Maintainability & Availability of Electric Power at all times. Conformity with environmental requirements.

Plant Master Layout

Plant 3D View (Storage tank area)

Plant 3D View (Pipe Bridge)

Plant 3D View (Stacks)

Plant 3D View (Engine Hall)

Plant 3D View (Engine Hall, Internal View)

Plant 3D View (Engine Hall, Internal View)

Stakeholders (Sponsors) Sabson Group (“Sabson”) : HIPC is backed by Sabson Group, one of the oldest business houses in Yemen with an operating history of over 100 years. Sabson Group is engaged in various manufacturing, trading and other activities catering to the needs of the local demands and requirements. The group is managed by Bajersh family. The Group is one of the most industrious business groups in the Hadhramout Region. Al-Rehab Group: Al-Rehab Group is one of the most reputed business houses engaged in infrastructure projects i.e. big and medium sized turn-key industrial and residential projects and other related activities in the Republic of Yemen. They are also engaged in various other activities as industrial and engineering services, real estate development, Information Technology and IT enabled services. The group is managed by Ahmad Sofan who is the ex-minister for planning and currently a member of parliament and holds minority shareholding in HIPC.

Continued Arab Fund: The Arab Fund for Economic and Social Development (AFESD) is an autonomous regional Pan-Arab development finance organization. Its membership consists of all states who are members of the League of Arab States. The Fund’s function is to assist the economic and social development of Arab countries through Financing development projects, with preference given to overall Arab development and to joint Arab projects; Encouraging the investment of private and public funds in Arab projects; and Providing technical assistance services for Arab economic and social development.

Stakeholders (Contractors) Wärtsilä Finland OY (“Wartsila”): Wartsila is a global leader in complete lifecycle power solutions for the marine and energy markets. By emphasizing technological innovation and total efficiency, Wärtsilä maximizes the environmental and economic performance of the vessels and power plants of its customers. In 2008, Wartsila's net sales totaled EUR 4.6 billion with 19,000 employees. The company has operations in 160 locations in 70 countries around the world. Wartsila has been contracted to provide Ten W18V32 Diesel Generator Sets (“DG Sets”) to HIPC and the associated & common auxiliaries. High Dam Electrical & Industrial Projects Co. (“Hideleco”) Hideleco, formed in July 1971 is involved in installation of the hydro-electric power station (12x175 MW) and the extra high voltage substations and overhead transmission lines of 500, 220 & 132 KV.

Continued Hideleco has successfully undertaken a)Loading, transportation and unloading of heavy equipment up to 300 tons and 180 meters length using heavy trucks and trailers with truck mounted cranes up to 150 tons; b) Customs clearance for equipment; and c) Testing and operation trials. Dastur Engineering International GMBH (“Dastur”): Dastur specializes in project planning and appraisal; economic evaluation; design and detailed engineering, procurement assistance services, project management and supervision of construction and erection; environmental engineering and pollution control; energy management and optimization; human resources development; marketing and management consultancy. Dastur also specializes in business consulting; integrated information technology strategy; automation and control strategy; simulation & modeling and optimization; and program management services. Dastur is internationally recognized as one of the largest independent consulting engineering organizations in the world.

Few Progress Photos

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued

Continued (HFO Tank 1 & LFO Tank)

Continued (Fuel unloading station floor under construction)

Continued (Fuel unloading station floor casting)

Continued (Fire Water Tank Foundation)

Continued (Engine Hall Ventilation Unit & Exhaust Duct Support Foundation)

Continued(Encased Cable Conduits from Utility Block to Step Up Transformers)

Continued(Day Tanks)

Continued (Day Tanks Area)

Continued (Day Tanks Area View)

Continued (Boiler Foundation & Engine Hall)

Continued(Boiler & Exhaust Duct Support Foundations)

Continued (Wartsila Consignment from India)

Continued (View of Tank Farm Area)

Continued (View of Engine Hall)

Continued(View of DG Sets 1-4)

Continued (View of Boiler & Exhaust Duct Support Foundations)

Continued (Utility Block Under Construction)

Continued(Utility Block Building Under Construction)

Continued(Shuttering & Reinforcement Work for Aux Container Foundation)

Continued (Shuttering & Reinforcement Work for Dyke Wall in Tank Farm Area)

Continued (Mud mat for Station Transformers & Utility Block , Backside)

Current Status of the Project The Project’s progress for the month as at 30th November 2009 & till 16th of December 09 month is summarized below: Subsequent to receipt of first four (4) DG sets at site, second Shipment comprising of compact booster unit, exhaust gas module, engine auxiliary module, HFO/LFO unloading unit / LFO transfer unit & boiler washing water pump unit have reached site. After taking the decision to extend the Utility Block by around 5.5 M, foundation work for utility block extension is under progress. Construction work for Fuel treatment House has been completed. Foundations for the Radiator & Fire Water Tank have been completed. In the Tank Farm Area , foundations for all (3) Storage Tanks have been completed. Column foundations & flooring for Engine Hall building has been completed & foundation work of utility block side cable end is under progress. Major flooring for Engine side ventilation unit has been completed.

Progress of Work as on 30.11.2009 S Curve weight age Description Scheduled (Nov ’09) Actual (Nov ’09) Procurement 47.30% 51.50% Engineering 85.36% 64.0 % Construction 19.89% 21.11% Overall Progress 39.15% 39.54%

Continued Erection work of Shell plates & Base plate has been virtually completed for LFO storage tank. Erection work for HFO Storage tankNo.2 in Tank farm area is under progress. Base Plate for HFO Storage tank no. 1 has been placed on foundation. Erection of all tanks in Day tank area is under progress & fabrication work for 100 Cu M LFO tank is under progress. Raft has been cast for extension portion of Utility Block building (approx. concrete quantity 22 m3) Encasing done for cable conduits from Utility Block towards Step-up transformers Mud mat laid for four (4) Nos. boiler foundations Mud mat laid for ten (10)Nos. exhaust duct support foundations. Concreting done for balance five (5) Nos. (total 10 Nos.) exhaust duct support foundations. (approx. conc. qty 11 m3). Concreting done for floor of generator side ventilation unit of Engine Hall (approx. conc. qty. 26 m3).  Concreting done for four (4) Nos. Boiler foundations (approx. conc. qty. 45 m3). Concreting done for floor of Unloading station at Tank Farm Area (approx. conc. qty. 30 m3).