Managing Service Projects. Learning Objectives zDescribe the nature of project management. zIllustrate the use of a Gantt chart. zConstruct a project.

Slides:



Advertisements
Similar presentations
Chapter 3 Managing the Information Systems Project
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
3 Project Management PowerPoint presentation to accompany
1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6 Scheduling. 222 Learning Objectives Estimate the duration for each activity Establish the estimated start time and required completion time.
Chapter 10 Project Scheduling: PERT/CPM
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
Chapter 7 Project Management
Chapter 6: Developing a Project Plan
Project Management 6e..
Project Management from Simple to Complex
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling: PERT-CPM
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
Developing the Project Plan
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Time Management
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Finding the Critical Path
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Developing a Project Plan
SE503 Advanced Project Management
Project Scheduling: Lagging, Crashing, and Activity Networks
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Chapter 3 Project Management.
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
25 seconds left…...
PSSA Preparation.
Introduction to Management Science
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
ISM 270 Service Engineering and Management Lecture 6: Forecasting.
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Managing Projects Chapter 10. What is a Project? A project has a unique purpose A project is temporary A project requires resources A project should have.
1 Ch. 15 Managing Service Projects. 2 常見的專案問題 1. 畢專:開學前完成計畫書( Gantt 圖) 2. 畢旅,或系學會規劃運管營及交通盃 3. 借鏡:訪談本系主辦運輸年會之經驗,老 師提國科會計畫案 4. 包括哪些 activity ? Critical.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Project Management McGraw Hill “Service Management” by Fitzsimmons.
Project Planning and Budgeting
Managing Service Projects
Exercise – A small building.
Importance of Project Schedules
Presentation transcript:

Managing Service Projects

Learning Objectives zDescribe the nature of project management. zIllustrate the use of a Gantt chart. zConstruct a project network. zPerform critical path analysis on a project network. zAllocate limited resources to a project. zCrash activities to reduce the project completion time. zAnalyze a project with uncertain activity times. zUse the earned value chart to monitor a project. zDiscuss the reasons why projects fail to meet performance, time, and cost objectives.

The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process: planning (work breakdown structure), scheduling, and controlling. zSelecting the Project Manager: credibility, sensitivity, ability to handle stress, and leadership. zBuilding the Project Team: Forming, Storming, Norming, and Performing. zPrinciples of Effective Project Management: direct people individually and as a team, reinforce excitement, keep everyone informed, manage healthy conflict, empower team, encourage risk taking and creativity. zProject Metrics: Cost, Time, Performance

Work Breakdown Structure 1.0 Move the hospital (Project) 1.1 Move patients (Task) Arrange for ambulance (Subtask) Prepare patients for move Box patients personnel effects 1.2 Move furniture Contract with moving company

Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be scheduled to begin and end? zWhich activities are critical to completing the project on time? zWhat is the probability of meeting the project completion due date? zHow should resources be allocated to activities?

Tennis Tournament Activities ID Activity Description Network Immediate Duration Node Predecessor (days) 1 Negotiate for Location A Contact Seeded Players B Plan Promotion C Locate Officials D Send RSVP Invitations E Sign Player Contracts F 2,3 4 7 Purchase Balls and Trophies G Negotiate Catering H 5,6 1 9 Prepare Location I 5, Tournament J 8,9 2

Notation for Critical Path Analysis Item Symbol Definition Activity duration t The expected duration of an activity Early start ES The earliest time an activity can begin if all previous activities are begun at their earliest times Early finish EF The earliest time an activity can be completed if it is started at its early start time Late start LS The latest time an activity can begin without delaying the completion of the project Late finish LF The latest time an activity can be completed if it is started at its latest start time Total slack TS The amount of time an activity can be delayed without delaying the completion of the project

Scheduling Formulas ES = EFpredecessor (max) (1) EF = ES + t (2) LF = LSsuccessor (min) (3) LS = LF - t (4) TS = LF - EF (5) TS = LS - ES (6) or

Tennis Tournament Activity on Node Diagram J2J2 B8B8 START A2A2 C3C3 D2D2 G4G4 E 10 I3I3 F4F4 H1H1 TS ESEF LSLF

Early Start Gantt Chart for Tennis Tournament ID Activity Days Day of Project Schedule A Negotiate for 2 Location B Contact Seeded 8 Players C Plan Promotion 3 D Locate Officials 2 E Send RSVP 10 Invitations F Sign Player 4 Contracts G Purchase Balls 4 and Trophies H Negotiate 1 Catering I Prepare Location 3 J Tournament 2 Personnel Required Critical Path Activities Activities with Slack

Resource Leveled Schedule for Tennis Tournament ID Activity Days Day of Project Schedule A Negotiate for 2 Location B Contact Seeded 8 Players C Plan Promotion 3 D Locate Officials 2 E Send RSVP 10 Invitations F Sign Player 4 Contracts G Purchase Balls 4 and Trophies H Negotiate 1 Catering I Prepare Location 3 J Tournament 2 Personnel Required Critical Path Activities Activities with Slack

Incorporating Uncertainty in Activity times A M D B F(D) P(D<A) =.01 P(D>B) =.01 optimistic most pessimistic likely TIME

Formulas for Beta Distribution of Activity Duration Expected Duration Variance Note: (B - A )= Range or

Activity Means and Variances for Tennis Tournament Activity A M B D V A B C D E F G H I J 2 2 2

Uncertainly Analysis Assumptions 1. Use of Beta Distribution and Formulas For D and V 2. Activities Statistically Independent 3. Central Limit Theorem Applies ( Use “student t” if less than 30 activities on CP) 4. Use of Critical Path Activities Leading Into Event Node Result Project Completion Time Distribution is Normal With: For Critical Path Activities

Completion Time Distribution for Tennis Tournament Critical Path Activities D V A 2 4/36 C 3 4/36 E /36 I 3 36/36 J 2 0 = /36 = 5.2 =

Question What is the probability of an overrun if a 24 day completion time is promised? 24 P (Time > 24) = =.04 or 4% Days

Costs for Hypothetical Project Cost (0,0) Schedule with Minimum Total Cost Duration of Project Total Cost Indirect Cost Opportunity Cost Direct Cost

Activity Cost-time Tradeoff C C*C* D*D* D Activity Duration (Days) Normal Crash Slope is cost to expedite per day Cost

Cost-Time Estimates for Tennis Tournament Time Estimate Direct Cost Expedite Cost Activity Normal Crash Normal Crash Slope A B C D E F G H I J Total 115

Progressive Crashing Project Activity Direct Indirect Opportunity Total Duration Crashed Cost Cost Cost Cost 20 Normal Normal Duration After Crashing Activity Project Paths Duration A-C-D-G-I-J 16 A-C-E-I-J 20 A-C-E-H-J 18 A-C-F-H-J 12 B-F-H-J 15

Applying Theory of Constraints to Project Management zWhy does activity safety time exist and is subsequently lost? 1. The “student syndrome” procrastination phenomena. 2. Multi-tasking muddles priorities. 3. Dependencies between activities cause delays to accumulate. zThe “Critical Chain” is the longest sequence of dependent activities and common (contended) resources. zMeasure Project Progress as % of Critical Chain completed. z Replacing safety time with buffers - Feeding buffer (FB) protects the critical chain from delays. - Project buffer (PB) is a safety time added to the end of the critical chain to protect the project completion date. - Resource buffer (RB) ensures that resources (e.g. rental equipment) are available to perform critical chain activities.

Accounting for Resource Contention Using Feeding Buffer J2J2 B8B8 START A2A2 C3C3 D2D2 G4G4 E 10 I3I3 F4F4 H1H1 FB=7 FB=5 NOTE: E and G cannot be performed simultaneously (same person) Set feeding buffer (FB) to allow one day total slack Project duration based on Critical Chain = 24 days

Incorporating Project Buffer J2J2 B4B4 START A2A2 C3C3 D2D2 G2G2 E5E5 I3I3 F2F2 H1H1 FB=2 FB=3 NOTE: Reduce by ½ all activity durations > 3 days to eliminate safety time Redefine Critical Chain = 17 days Reset feeding buffer (FB) values Project buffer (PB) = ½ (Original Critical Chain-Redefined Critical Chain) PB=4

Sources of Unexpected Problems

Earned Value Chart

Topics for Discussion zGive an example that demonstrates trade-off inherent in projects among cost, time, and performance. zIllustrate the four stages of team building from your own experience. zAre Gantt charts still viable project management tools? Explain. zExplain why the PERT estimate of expected project duration is always optimistic. zWhat purpose does a project history report serve? zDiscuss the differences among time variance, cost variance, and schedule variance.

Interactive Exercise Prepare a work breakdown structure (WBS) for a homecoming dance.