Blast Site Edge Protection

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Risk Assessment. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and.
Nick Higginson Risk Assessment In The Workplace. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for.
Height Aware Campaign. Background Work at height Who the campaign is for What will happen Work at Height Regulations 2005.
Accident and Incident Investigation
Work at Height Regulations 2005
Safe working on or near roofs
The Post-Blast Inspection
OH&S IN THE MUSIC INDUSTRY – WK 2, SEMESTER Why do we need it? Due to injuries within the workplace, and the increase of litigation and responsibilities.
Fall Prevention on Highwalls Practices Near a Safe Practices Near a Highwall Crest.
The Safe Use of Work Equipment. Overview This training tool is dedicated to work equipment and their associated hazards. Work equipment means any machinery,
Positioning a shotfiring shelter
Replacing Face Top Edge Protection. Whatley Quarry Whatley Nr. Frome Somerset BA112EU.
Safe Job Analysis The objective of this procedure is to prevent accidents by operating a systematic procedure for: Identification of hazards associated.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
By Danielle.  The provision and use of work equipment regulations was first introduced in 1992 but was replaced by a more update version in The.
Risk Assessment S afe W ork at H eight O peration In Pakistan recorded worker fatalities from falls from height average 80 people each year Over 42% of.
1 Out of Site, Out of Mind! Mark Mallen Group Health and Safety Manager.
WHS Management Plans.
WELLINGTON COUNTY CONFINED SPACE. Learning Outcomes The participant will:  Assess hazards associated with Confined Space Entry  Identify a Confined.
The Provision and Use of Work Equipment Regulations 1998 By John Johnston AIIRSM Health and Safety for Beginners
Review Quiz 1. OHS Legislation 4. Incident Response Introduction 2. Hazards & Controls 3. OHS Communication EASY GUIDES Australia.
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
1 Falls Module 3. 2 DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health Administration, U.S. Department.
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
Slide 1 of 12 Fires on Explosives Vehicles Guidance on what steps to take in the event of a fire on a vehicle that is either carrying explosives or materials.
Health and Safety Policy
A guide to… Maintenance Safety. Aim There is a legal requirement for regular and effective maintenance, inspection and testing of work equipment. This.
Merchant Shipping (Code of Safe Working Practices) Regulations Statutory Instrument 1998 No
Fall Protection.
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
Danger Zone Control and the Duties of Sentries Guidance on how to ensure control of the danger zone and what is expected from sentries. Quarries Working.
Thunderstorms – Risks and Actions Guidance on what steps to take if a thunderstorm approaches during the blasting process. Quarries Working towards a safe.
Defining the Danger Zone for Blasting Guidance on what to consider when determining the danger zone for quarry blasting Quarries Working towards a safe.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
Work at Height The New Regulations. BACKGROUND AND APPLICATION.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
A Health and safety law training programme for employers This programme has been set up to guide employers on some of the basic H&S legislation in the.
Rick Statham HAS Dip, CMIOSH (Joint Managing Director) Safety & Access Ltd SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
SCOTTISH BORDERS SAFETY FORUM WORKING SAFELY WITH WORK EQUIPMENT Compiled by Donald A Mackay Mainetti UK Ltd.
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
Slide 1 of 8 Post-Blast Fumes Guidance on post-blast fumes and what steps to take to avoid exposure to them. Drilling and Blasting Toolbox Talk : 16 Target.
Toolbox presentation: Approaches to hazard identification.
Slide 1 of 13 Don’t be a Dummy with Explosives A reminder of the power of detonators and explosives. Drilling and Blasting Toolbox Talk : 17 Target Audience.
The Georgia Tech Safety & Health Consultation Program presents 2016 Safety & Health Free Seminar Series Did you know that Georgia Tech has a free Safety.
Onsite traffic management and pedestrian safety. Aim of this session Discuss why traffic management is a priority issue for us. Consult with our workers.
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
A Toolbox Talk for Pedestrian Safety In Quarries and Surface Mining
Defining the Danger Zone for Blasting
Ranjan kumar Assistant Manager CCL,Ranchi
Lock Out & Tag Out.
The Provision and Use of Work Equipment Regulations 1998
OVERVIEW Control Of Hazardous Energy.
Drilling and Blasting Toolbox Talk : 17 Updated October 2015
SCOTTISH BORDERS SAFETY FORUM
Emergency Action Plans
Drilling and Blasting Toolbox Talk : 03 Updated Aug 2014
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
Drilling and Blasting Toolbox Talk : 10 Updated Aug 2014
Target Audience Anybody involved in the blasting process.
Drilling and Blasting Toolbox Talk : 07 Updated Oct 2015
Drilling and Blasting Toolbox Talk : 06 Updated Apr 2019
Target Audience Shotfirers and Explosives Supervisors.
Target Audience Shotfirers and Explosive Supervisors.
Drilling and Blasting Toolbox Talk : 16 Updated Oct 2015
Drilling and Blasting Toolbox Talk : 17 Updated October 2015
Target Audience All quarry personnel.
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

Blast Site Edge Protection Drilling and Blasting Toolbox Talk : 03 Blast Site Edge Protection Information on the use of edge protection systems in the blasting area Target Audience Any person likely to be working in the blasting area and those supervising such operations. Quarries Working towards a safe and healthy quarrying industry National Joint Employers Advisory Employees Committee Health and Safety Executive This publication may be freely reproduced except for advertising, endorsement or commercial purposes. The information is current at February 2009. Please acknowledge ‘QNJAC’ as the source  Updated September 2009

Blast site edge protection 1 : Introduction Lives have been lost in the past through falls from quarry faces. Thankfully this is now very rare mainly due to control measures introduced to prevent it. This toolbox talk is designed to help the industry to reduce further the likelihood of these incidents. In deciding what are the most suitable control measures for any particular circumstance, account needs to be taken of both The Quarries Regulations 1999 and the Work at Height Regulations 2005.

Blast site edge protection 2 : Managing the Risk The Operator is responsible for Health and Safety on site including all drilling and blasting activities This includes the design, construction and provision of blast site edge protection Blast site activities include Surveying, marking out, drilling, loading and firing It is therefore very important to carry out a site specific risk assessment including all the personnel likely to be involved in the blasting operation For Example Driller, Shotfirer, Explosives Supervisor, Quarry Manager Bulk explosive supplier, Geotechnical Consultant

Blast site edge protection 2 : Managing the Risk The following topics should be considered as a minimum in a risk assessment Prevention of personnel and equipment from falling over the edge The site geology and stability of the face. Access to the blast site for drill rig, delivery of stemming, explosives delivery vehicles, bulk explosive trucks and emergency vehicles. Blast design parameters Such as spacing, burden, etc Profiling and surveying operations Weather conditions

Blast site edge protection 2 : Managing the Risk The Work at Height hierarchy should be followed in selecting the method used:- Collective measures should be given priority over personal protective measures. Physical barriers such as the safety bund and post and strap should be considered first Where the use of physical barriers creates an unacceptable risk then other measures such as delineation of the danger zone or harnesses should be considered The Quarry operator should be able to show that they have considered how a fall from an open edge will be prevented for that particular shot.

Blast site edge protection 3 : Protection Methods Safety Bund Advantages Provides protection for people Does not need removing before blast Disadvantages Can cover up bad edge conditions A safe system of work needs to be established detailing how such bunds put in place Requires the movement of mobile plant close to the crest

Blast site edge protection 3 : Protection Methods Safety Bund How high do the bunds need to be ? People only on the blast area Not less than 1m In this case a second bund will be required behind the blast to prevent vehicles from encroaching Vehicles operating on the blast area A minimum of 1.5m or the radius of the largest vehicle wheel

Blast site edge protection 3 : Protection Methods (continued) Post and Strap Designed to prevent personnel from accidentally approaching the edge Advantages Acts as a physical barrier to prevent personnel from falling over face Disadvantages Barrier will not prevent machinery from falling over face Requires a drill rig to approach the edge to drill post holes Placing and removal of system requires personnel to approach the edge Normally this will require the use of an additional fall prevention system Removal of system can result in the initiation system being disturbed with the potential for misfires

Blast site edge protection 3 : Protection Methods (continued) Post and Strap – Bad Practice Only a single strap has been used ! Worse than useless as the protection has been placed such that the face edge comes inside the protection

Blast site edge protection 3 : Protection Methods (continued) Post and Strap – Good Practice Two straps have been used Straps are tensioned Line of protection is positioned just in front of the first row of holes

Blast site edge protection 3 : Protection Methods (continued) Stand-off Distance In this case workers may not approach within a specified distance to an unprotected edge The distance needs to be well delineated with some form of barrier Good example is when used with cones and rope This system needs to be well supervised Advantages No need for the drill rig to approach the bench edge Can easily be removed before the blast Disadvantages Does not prevent either people or equipment from falling over face

Blast site edge protection 3 : Protection Methods (continued) Example of Stand-off Distance In the photograph this system is used on a site that employs a stand-off distance of 3m. A cone and rope system has been used to indicate the stand-off distance from the edge of the face Note also that in this case a bund has been positioned to prevent equipment such as bulk explosive trucks from coming on the blast area

Blast site edge protection 3 : Protection Methods (continued) Fall Prevention Systems Should only be used as a last resort Should be installed so as to prevent personnel reaching the crest and falling over the face Requires that personnel are also trained in emergency recovery procedures. Many sites require the use of such system when removing the post and strap system previously described

Blast Site Edge Protection 4 : Key Points Edge protection is required for all blast areas Each blast should be separately assessed to determine suitable protection measures for that location A single edge protection system may not be universally appropriate If you think the edge protection is inadequate STOP WORK and inform your supervisor