IT Project Management Course Overview. Time Schedule (1) Minggu Ke-Kelas AKelas B Materi (Tentative)Group Task 1 Monday, February 09, 2009 Saturday, February.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Advanced Piloting Cruise Plot.
Our library has two forms of encyclopedias: Hard copy and electronic versions. The first is simply the old-fashioned "book on the shelf" type of encyclopedia.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Days Months January Monday February Tuesday March Wednesday April
Working with MS-ACCESS IS 240 – Database Management Lecture #2 – Assoc. Prof. M. E. Kabay, PhD, CISSP Norwich University
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Fractions VI Simplifying Fractions
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Reducing Fractions. Factor A number that is multiplied by another number to find a product. Factors of 24 are (1,2, 3, 4, 6, 8, 12, 24).
0 - 0.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
We are learning how to read the 24 hour clock
CMPT 275 Software Engineering
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Slide 1 of 29 Community news Slide 2 of 29 Nouvelles de la communauté…
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

IT Project Management Course Overview

Time Schedule (1) Minggu Ke-Kelas AKelas B Materi (Tentative)Group Task 1 Monday, February 09, 2009 Saturday, February 14, 2009Intro, Case, GroupGroup Member 2 Monday, February 16, 2009 Saturday, February 21, 2009 Organization, Life Cycle Case Description (TOR) 3 Monday, February 23, 2009 Saturday, February 28, 2009Process GroupTender (pres.) 4 Monday, March 02, 2009 Saturday, March 07, 2009Project IntegrationProject Charter 5 Monday, March 09, 2009 Saturday, March 14, 2009Project Scope Project Requirements 6 Monday, March 16, 2009 Saturday, March 21, 2009Project TimeTime Management 7 Monday, March 23, 2009 Saturday, March 28, 2009Project CostCost Management 8 Monday, March 30, 2009 Saturday, April 04, 2009Kuis Besar UTS April 2009 UTS

Time Schedule (2) Minggu Ke-Kelas AKelas B Materi (Tentative)Group Task 9 Monday, April 20, 2009 Saturday, April 25, 2009 Project Quality Quality Management 10 Monday, April 27, 2009 Saturday, May 02, 2009 Project Human Resources 11 Monday, May 04, 2009 Saturday, May 09, 2009 Project Communication Communication Management 12 Monday, May 11, 2009 Saturday, May 16, 2009Project RiskRisk Management 13 Monday, May 18, 2009 Saturday, May 23, 2009 Project Procurement 14 Monday, May 25, 2009 Saturday, May 30, 2009 Group PresentationDemo Product 15 Monday, June 01, 2009 Saturday, June 06, 2009 Kuis Besar UAS Final Report (Cumulative) June 2009 UAS

Special Class Schedule Kelas AKelas B PenggantiFriday, March 13, 2009Friday, April 24, 2009 Friday, May 08, 2009 Time?

Materials (1) Information Technology Project Management Kathy Schwalbe (3 rd ed), ISBN Thomson Course Technology, mis/ schwalbe/index.cfm Introduction to Information Systems Project Management, David L. Olson (2 nd ed), McGraw-Hill, 2003

Materials (2) Diktat Proyek Manajemen Articles, web sites, etc – Project Management Body of Knowledge 2000 – ISO 9126 Software Product Evaluation – Microsoft Project Manual – IT Project Management Cases (a lot out there!)

Point Distribution KAT30% Kuis, Diskusi, PR, Tugas, dll = 10 * 1% 10% Laporan Pertemuan = 10 * 2% 20% UTS30% Formal20% Laporan Antara10% UAS40% Formal20% Presentasi = 1 * 10%10% Laporan Akhir= 1 *10%10%

Class Agreement 10 minutes time over  class will be locked Ringing HP  entertainment the class No phone in the class Group 3-5 members

Sharing Time What is a project ? What is the main aim of a project ? Why IT projects are special ? What is the role of a project manager ?

Group Task Search the Internet for the terms: Project management Project management careers Project portofolio management Information technology project management – Write down the page for each 3 hits – Find at least 3 websites that provide interesting information about on one of the above topics – In a one or two page paper, summarize key information about the websites