Digital Highways Digital Highways What are they? Why do we need them? How do we get there? Ron Singh, PLS Chief of Surveys/Geometronics Manager Oregon.

Slides:



Advertisements
Similar presentations
Alter – Information Systems 4th e d. © 2002 Prentice Hall 1 Moving Towards E-Business As Usual.
Advertisements

Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Board of Early Education and Care Retreat June 30,
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Negative Numbers What do you understand by this?.
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
1 Aberdeen City Probationer Teacher Induction Programme.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
© Tarek Hegazy – 1 Basics of Asset Management Prof. Tarek Hegazy.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
3D Laser Scanning Beyond the Project
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
Green Eggs and Ham.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Name Convolutional codes Tomashevich Victor. Name- 2 - Introduction Convolutional codes map information to code bits sequentially by convolving a sequence.
Template V.24, 1-Mar-2007 Creating Value with the Infor MES & QM Jay Melville Sr. Manufacturing Consultant Mike LeRoy Business Unit Manager, May 30, 2007.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
DB analyzer utility An overview 1. DB Analyzer An application used to track discrepancies and other reports in Sanchay Post Constantly updated by SDC.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Using one or more of your senses to gather information.
Subtraction: Adding UP
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Educator Evaluation: A Protocol for Developing S.M.A.R.T. Goal Statements.
GEOGRAPHICAL INFORMATION SYSTEM
Presentation transcript:

Digital Highways Digital Highways What are they? Why do we need them? How do we get there? Ron Singh, PLS Chief of Surveys/Geometronics Manager Oregon Department of Transportation ODOT Surveyors Conference Salem, Oregon 1 April, 2014

Maps Purpose - Visualize a representation of a (physical) real world area Evolution ◦Crude sketches (2D) ◦1:x Scale drawings (2D) ◦1:1 Scale drawings (2D and 2 ½D) ◦True 3D (varying levels) Virtual world 2

Design Workflow - PAST Referenced to alignment (“P” line, etc.) Site represented by 2D Base Map Terrain represented by Cross Sections Grade represented by Profiles Blind between data points 2D design Paper plans and specifications Wet signatures 3

Design Workflow - TODAY Geospatially referenced Coordinates projected to plane Site represented by 2 ½ D Base Map Terrain represented by Digital Terrain Model (DTM) Blind between data points – albeit closer 3D roadway prism design flattened to 2D Paper plans and specifications Wet or Digital signatures 4

Design Workflow - FUTURE Truly Geospatially referenced 3D coordinate system – No projections Site/Terrain represented by virtual world Full 3D design Digital signatures 3D data utilized for construction Hierarchy – Data primary, plans secondary 5

Traditional As-built Plans Documents changes to plans Red lines on hardcopy plans Now on CAD drawings Low priority compared to construction Very dependent on inspector Made from rough measurements Not sealed by engineer or surveyor 6

Traditional As-built Plans 2D Unreliable Not useful for subsequent engineering 7

Future Engineering data life cycle As-built 3D model Utilize for maintenance, operation, asset management and future engineering Engineering accuracy Low distortion coordinates Post Construction Survey Sealed by licensed surveyor 8

Post Construction Survey Performed during and post construction Final Horizontal and Vertical Control Right-of-Way boundary Roadway prism information and DTM Underground utilities and features On-ground features Above ground features 9

For Intelligent Decisions… We need knowledge Knowledge: Acquaintance with facts, truths, or principles, as from study, investigation or information. 10

Knowledge of… Our transportation system -- what we have It’s condition The load on it Areas of concern Public’s need Gaps Priorities Resources Funding 11 VISION for the future PLAN for the future!

Safer, smarter, less disruptive surveying 3D Design – advanced visualization, clash and problem detection Automated machine guidance and intelligent construction systems Sophisticated asset management for informed decisions Efficient operation of our highway system Digital Highways Future backbone of highway information system enabling: 12 … and the inevitable transition to partial and fully autonomous vehicles.

Highway Lifecycle Data Digital Highways – entire state system Visual – image based, solid models Created by existing feature data capture Interspersed by 3D Engineered Models ◦Engineering centerline alignment ◦Right-of-way boundary ◦Design/As-built ◦Asset inventory w/attributes ◦Performance data 13

Operational Needs See ◦Above, on and below the surface Measure ◦Location (geospatial), distance, area, volume Evaluate ◦Age, condition, performance Find/Query ◦Locate, tally, report Relate ◦ Planer, Linear Referencing, adjoiners 14

Operational Needs Manage Performance ◦Safety, traffic volume, weather impacts, Track History ◦Design, construction, documents Understand Geometry ◦Design, as-built, survey, professionals of record Retrieve Documents ◦Contracts, inter-governmental agreements, plan sets, technical reports 15

Operational Needs Monitor ◦Movement, deformation, degradation Simulate ◦Traffic, oversize routing Overlay ◦Live traffic, micro weather 16

Today 17

Point Clouds Enables the development of Digital Highways A means to an end Created, certified, and managed by expert qualified personnel Black Box Simplified for end user 18

Point Clouds (for projects) Full Utilization of Information Rich Point Clouds From “2½D BaseMap” to “Virtual World” No Traditional (Triangulated) DTM Critical 3D Objects: ◦Mathematically Modeled (geometric solid object) ◦Mesh Modeled (reality, imperfect, discreet objects) 3D Feature Extraction ONLY Where Necessary for Design Certified by Professional of Record 19

Point Clouds (as an asset) Virtual Highway Corridors ◦Information Rich Point Clouds ◦Aerial and Oblique Imagery Accuracy ◦Low for entire system ◦Engineering/Quality in certain areas Programmatic Approach (statewide, cyclic) Updated by Project As-Built Post Construction Surveys 20

Point Clouds (as an asset) Integrated w/GIS ◦Engineering Alignments ◦Right-of-Way Boundaries ◦Asset Inventory ◦Pavement Conditions Replacement for Digital Video Log Safety Analysis Accident Reconstruction Survey (streamline) Oversize Vehicle Routing 21

22 Proactive Data-centric Approach Proactive Data-centric Approach

23 Project Development Survey Virtual Site 3D Design Construction Staking Digitally Signed Data 20% Machine Control Digitally Signed Engineering Data Archive 80% Digitally Signed Future Post Construction Survey

Tomorrow 24

Recent Example of Operational Use of LiDAR 25

26 Sanpoil

27

28

29

30

31

32

33

34

Thank You! 35 Ron Singh, PLS Chief of Surveys/Geometronics Manager Oregon Department of Transportation Ron Singh, PLS Chief of Surveys/Geometronics Manager Oregon Department of Transportation