Www.piralu.com PIRALU Pre-Insulated aluminium panels www.poliuretanos.com Poliuretanos, s.a. -Wy: Dynamic derivation CHAPTER 006-i.

Slides:



Advertisements
Similar presentations
Instructions To use this template:
Advertisements

Created by Terri Street; inspired by the work of Jennifer Wagner; revisions courtesy of Stephanie Novack. © 2000, 2009 Background images courtesy of abc.com.
Discovering Area of a Circle.
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
TORONTO PUBLIC LIBRARY THORNCLIFFE BRANCH. PHOTOGRAPHS Interior view of library from entrance area……………………………………………………………………………………………… 3 Interior view.
Mathematical Treasure-hunt: Sequences
You will need some paper!
0 - 0.
Addition Facts
Literacy Instructions Thursday 7 th January 2010 Making a pop up card.
From : Michel MATHIEU to : Luis HERVAS CABLING sub-D 37 M for trigger cables 1- strip the cable cutting off the external gaine on a length of about 7cm.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Sectional Assembly and Installation
Problem # Problem #
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Offset: S CHAPTER 008-i.
BUILDING TRADES: BUILDING BASIC CABINETS Copyright © Texas Education Agency, All rights reserved.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Rosa Murillo Mixed Media and Collage Journal Cover
The Insulation Choice Made Easy High Performance Insulation.
001-i CHAPTER -The pre-insulated air ducting panels
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Time for the body. 1. Go back to the top view, and draw tub (start from the center point of the hood)
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
The Unit Circle PreCalculus.
LEARN THE RULER FRACTIONS OF 4 TH, 8 TH, & 16 TH Different types of rulers.
Start with a sheet of A4 paper size FOLD the paper on all lines then open up. 2 2.
::Manual of Construction::. MENU OF THE MANUAL 03 Cutting the panels 07 Straight duct 08 Elbow 10 End cap 01 Bases of the system 04 Type of strips 05.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Hangers & Supports -Handling unit connection -Dampers, Grilles.
Solar Bake Off. PROCEDURE 1.1 st person traces a flap in the top of the box. Use the ruler and marker to measure a 1½” border around the lid, on the.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Round Elbow CHAPTER 003-i -Bend of the panels.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Square Elbow with turning vanes CHAPTER 009-i.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Take off: Tee branch CHAPTER 007-i -Plenum to Grilles & Diffusers.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Reinforcements -Access doors CHAPTER 010-i.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -End cap CHAPTER 005-i.
SHED CONSTRUCTION A Visual Guide. C.A.D. Example.
1 WALL FRAMING. 2 Interior & exterior walls l basic wall components –bottom plate –studs –top plates –headers –bracing –sheathing –finishing materials.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Making a Home Made Estes Rocket By Roberto & Stefano Barbier.
Hot Air Balloons Watch Hot Air Balloon construction dvd.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Straight Duct CHAPTER 002-I.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Reduction or transition CHAPTER 004-i.
Year 9Dice. Select “New” Select “Metric” Standard (mm).ipt 1 2.
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a.. -Tool formed by four pieces with those which they can be.
Ch. 6 Geometry Lab 6-9b Tessellations Lab 6-9b Tessellations.
SLAB CLAY TECHNIQUE. Overview of steps Day 1: Intro, planning (brainstorm and thumbnail sketch), adapt (if necessary) and cut out templates.
History Foldables Mr. Harpine. Step Book - Timeline  Fold 2 sheets of paper in ½ the short way  Make a fold in the first piece 3 ½ inches from the edge.
LED Flashlight.
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
CHAPTER 1 -The pre-insulated air ducting panels
Sheet Metal Development
WE SEE YOUR DREAMS Leaders Containers Trading FZE
site: 5 CHAPTER -End cap Kingdom of Saudi Arabia. P.O Box: 62676, Riyadh Tel: Fax:
ARISSat-1 Solar Panel Covers
Step-by-step assembly instructions
Science - Year 3/4A Spring 2
Fold Your Own Bank Activity
Making a Pyramid Booklet
Inside angles theorem.
Correcting Assignment #24 (6, 7, 11-15, 19-24, 27, 29, 31-32)
Isosceles Triangles. Isosceles Triangles Base Angles If 2 angles in a triangle are congruent, then the sides opposite them are congruent.
Isosceles Triangles. Isosceles Triangles Base Angles If 2 angles in a triangle are congruent, then the sides opposite them are congruent.
Exterior Angle Theorem
2/
Presentation transcript:

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Wy: Dynamic derivation CHAPTER 006-i

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Wye 1 Cover bottomCover top Radius 150mm 1:7 W+200mm 3.000mm Aluminium tape Draw the template of the cover bottom and cut toward “EXTERNAL”.

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 2 Cover top Cover bottom 3.000mm Copy the template and to cut on the contrary: toward the “INTERIOR”. Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 3 =3.000mm Cut the walls and make the female before of to glue. Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Detail of the internal deflector. 4 Aluminium tape Bent Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 5 Glue Glue all the sides cut at 45º Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 6 Aluminium tape Exterior face Unite the four sides with aluminum tape for the exterior. Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 7 Interior face Rotate the duct in position with the interior face up. Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Close the piece follow the order Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Place the wall of the deflector. 9 Internal deflector 3 Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Adapt the internal deflector in the correct position. 10 Position internal deflector Internal deflector 4 Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Place the external wall of the elbow part Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Finish off of the internal deflector. 12 Triangle clips panel Glue Aluminium tape Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 13 Place the internal wall of the elbow part. 6 Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. 14 Aluminium tape Pressing Silicon inside To press, to tape, to clip and to make the male. Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. Samples of application: wye of “SHORT ENTRANCE” (1) 3.000mm Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a mm Samples of application: wye of “LONG ENTRANCE” (1) Wye

PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a mm Samples of application: wye of “LONG ENTRANCE” (2) Wye