Traditional Construction Locally established actions of construction project organizations.

Slides:



Advertisements
Similar presentations
Chapter nine Value Chain Management: Functional Strategies for Competitive Advantage McGraw-Hill/Irwin Contemporary Management, 5/e Copyright © 2008 The.
Advertisements

Chapter 24 Quality Management.
How important is it to you that: (percent) Total very or somewhat important Very important Somewhat important You have one place/doctor responsible for.
CASE STUDY RESEARCH INTO AUSTRALIAN MECHANICAL ENGINEER ATTRIBUTES Clive Ferguson Deakin University Australia.
What we do Production of high specification critical component parts and assemblies to our customers requirements.
Birdfield Building Services is an institution that has an experience as commercial building contractor, specializing in construction, property maintenance.
Supply & Install SHARJAH, UNITED ARAB EMIRATES. Our professional & Reliable Work Brochure ….
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
5.2 Costs and Revenues IBBM.
HOUSING SOUND INSULATION & SUSTAINABLE DEVELOPMENT Dr Sean Smith Building Performance Centre Napier University Scottish Executive – Victoria Quay BPC.
ENGINEERING CONSULTING SERVICES COMPANY
Introduction When you choose a restaurant for a meal, are you concerned with: The price of the meal How long you have to wait to be seated The quality.
Refurbishing an Existing Research Facility - Recent Experiences Jon Green VP Business Operations.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Manufacturing and Service Technologies
Design Build. Customer employs design build company Defined new facility Specified completion date Agreed price.
1 Making buildings better Building Tight Chris Knights.
1 Functional Strategy – IS & IT Geoff Leese November 2006, revised July 2007, September 2008, August 2009.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management.
Lecture 5: Requirements Engineering
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
MANAGEMENT OF SMALL/MEDIUM FIRM Paweł Bilski Piotr Mazur Paulina Wawryca.
NATURE OF CONSTRUCTION BUSINESS Aleš Tomek Faculty of Civil Engineering Department of Economics and Management CZECH TECHNICAL UNIVERSITY IN PRAGUE.
Selecting A Contractor - Types Of Tendering. Requirements of the Contractor Has experience with the type of project to be developed. Is able to cope with.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Contract strategy Traditional ApproachIncreasing Traditional ApproachIncreasing Accelerated Traditionalintegration Accelerated Traditionalintegration.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management 1.
A Facility Manager’s Perspective Jeremy Bowler MIE Aust. MIHE (Ret’d) 1.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
The operations function is fashionable!
Construction Management Practice Implications of the Theory of Construction Management.
Construction Management Research. Theory of Construction Management Effective theory comprises tested propositions.
Design & Layout of Foodservice Facilities
Construction Industry. Salisbury Cathedral Taj Mahal.
CONSTRUCTION IT ALLIANCE CITA: ADDRESSING THE ICT CHALLENGES OF THE IRISH CONSTRUCTION INDUSTRY IN IRELAND Dr.Alan V. Hore Lecturer in Dublin Institute.
CS 4310: Software Engineering
Total Construction Service. A construction company offers customers products including a range of clearly defined options a range of financial options.
1 There are a number of organization designs, including many combinations or hybrids of models. Seven designs are shown below: Process Centered Front End.
Ben Craig, Operations Director 25 April 2013 DECC Fuel Poverty Project The Delivery Experience.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Production and Efficiency. Content Specialisation Division of labour Exchange Production and productivity Economies of Scale Economic Efficiency.
Feedback from the Built Environment Professionals L R Sampson From discussions with Bill Schutz, representative for the Established Consultancy Employers.
CE 726 STRATEGIC CAPABILITY. ASSESSMENT OF STRATEGIC CAPABILITY.
Partnering. The West’s response to Japan’s greater efficiency in major manufacturing industries Japan’s approach is based on cooperative, long term relationships.
Information System Project Management Lecture three Chapter one
TOPIC-9- PROJECT ORGANIZATION
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Management Approaches. Construction Management Customer appoints Design team and Management team.
Architectural Design of Large Hotel and Energy Used for Internal Space Thermal Control by Dr Bin Su School of Architecture and Landscape Architecture UNITEC,
OPERATIONS MANAGEMENT. OPERATIONS MANAGEMENT 1  Where to produce? What is the best location for the business? In the case of manufacturing, this may.
Unit 210: How to communicate with others
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 29 PowerPoint presentation Types of organisation,
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Roles and responsibilities PM
The Design Team Carl James.
Sustainability and the Built Environment
Chapter Outline Innovation, Technological Change, and Competition
RIBA Plan of Work 2013.
Pre-Contract Cost Control
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Pre-contract Planning and Practice
Introduction to building contract
Spire Hospital, Dunedin
Value of contract: Length of contract: Contract start date:
R-2000 Houses State of the Art Ventilation System
RIBA Plan of Work 2013.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Traditional Construction Locally established actions of construction project organizations

Fundamental Traditional Construction Customer employs craft teams to construct a building Some customers also employ an architect

Fundamental Traditional Construction CUSTOMER TRADE CONTRACTOR CUSTOMER TRADE CONTRACTOR ARCHITECT

Fundamental Traditional Construction Depends on locally established technologies being used in ways expected and understood by craft teams Has produced many fine buildings Fails if designs require craft teams to go beyond the limits of their established technologies

Pantheon in Rome

Salisbury Cathedral

Fundamental Traditional Construction Unable to cope with new technologies or customers demanding greater efficiency

New Technologies Structural engineering Services engineering Research and development Manufactured products Leading to large numbers of specialised construction teams

Demanding Customers Fast construction Firm completion date Reliable quality No defects Good value Fixed costs

Developed Traditional Construction The industry’s response to new technologies and demanding customers

Developed Traditional Construction CUSTOMER GENERAL CONTRACTOR DESIGN CONSULTANT TRADE CONTRACTOR OTHER CONSULTANTS SPECIALIST DESIGNERS

Developed Traditional Construction Strengths Works well when customer provides a clear brief Designer relies on technologies within the competence of local general contractors Competent teams undertake manufacturing, production and commissioning Teams complete their own work and do not leave problems for others

Developed Traditional Construction Weaknesses CONSTRUCTION TEAM CONSTRUCTION TEAM DESIGN AND PRODUCTION FAILURES BOUNDARY RELATIONSHIP INHERENT DIFFICULTY

Project using Developed Traditional Construction The project is to construct a new hotel on a virgin site. The hotel has 300 guest rooms and the other spaces expected in a 5* hotel The building is 10 stories high with a steel structural frame, concrete beam floors and roofs, and high quality, pre-fabricated external cladding.

TeamsTeam-days Brief180 Design18730 Plan 3200 Procurement14750 Manufacturing5150 Production Commissioning7140 TOTALS

For a project with 115 teams (N=115) Possible relationships = 115 x 114/2 = of these do not occur Actual relationships = 2909

Largest number of teams in one time interval is 47 in 21 st time interval They are constructing the external envelope, service cores, risers and main plant, the main entrance and vertical circulation Externally there is landscaping and external services are being installed The work is supervised by design teams 47 x 46/2 = 1081 possible relationships

During the 21 st time interval the following teams work simultaneously 3 out of 6 external envelope teams 5 out of 6 service core teams 5 out of 5 risers and main plant teams 4 out of 12 entrance and vertical circulation teams 2 out of 6 landscaping and external services teams 2 out of 3 contracts and payment system teams 2 out of 4 general contractor’s plan and control teams This gives a total of 23 teams with 253 relationships

Established Relationships 2 Structure with 3 External envelope teams 6 Service core with 5 Risers and plant teams This is 65 established relationships Established Relationships Indicator E R =65/2909=0.022

The relationship fluctuation indicator F E = There is an overwhelming influence of boundary relationships throughout the project because of the small number of established relationships This is common with Traditional Construction Particularly when teams are provided by the lowest bidders

Relationship Quality Indicator for established relationships ranges from 0.01 to 0.85 Total Relationship Quality Indicator 28.85/2909= The few high values for individual relationships are hardly significant because there are only 65 established relationships out of 2909 actual relationships

The project organisation is not overly complex There are 29 time intervals out of a potential maximum of 229 This is balanced by the congestion in the 21 st time interval when 23 teams are working Relationships configuration complexity indicator = 0.88

The past performance of the 115 teams over their previous 10 projects provides team Performance Variability Indicators which range from 0.10 to 0.50 Performance Variability Indicator Rp=0.24

Historical records for projects using Developed Traditional Construction gives External Interference Indicator = 0.45

Established Relationships E R =0.022 Relationship Fluctuation F E =0.985 Relationship Quality Q R = Relationship Configuration C R =0.88 Performance Variability R p =0.24 External Interference I=0.45 Developed Traditional Construction

Varieties of Developed Traditional Construction UK Architect design USA Specialist contractor design European Architect and Engineer design

UK Architect Design Design stage CUSTOMERARCHITECT STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST VENTILATION SPECIALIST CLADDING SPECIALIST

UK Architect Design Production stage CUSTOMER ARCHITECT STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST VENTILATION SPECIALIST CLADDING SPECIALIST GENERAL CONTRACTOR

UK Architect Design Architect control of complete design Nominated subcontractors Quantity Surveyor role Bills of Quantities Cost control Innovative design but inefficient projects

USA Specialist Contractor Design - Design stage CUSTOMER ARCHITECT STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST VENTILATION SPECIALIST CLADDING SPECIALIST GENERAL CONTRACTOR

USA Specialist Contractor Design – Production stage CUSTOMER ARCHITECT STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST VENTILATION SPECIALIST CLADDING SPECIALIST GENERAL CONTRACTOR

USA Specialist Contractor Design Overall design by architect Detail design by specialists Specialists sort out problems quickly Stylish building spoilt by awkward junctions between technologies Poor at dealing with innovative designs

European Architect and Engineer Design - Design stage CUSTOMER ARCHITECT STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST VENTILATION SPECIALIST CLADDING SPECIALIST GENERAL CONTRACTOR

European Architect and Engineer Design - Production stage CUSTOMER ARCHITECT STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST VENTILATION SPECIALIST CLADDING SPECIALIST GENERAL CONTRACTOR

European Architect and Engineer Design Scheme design by Architect Engineer contractor selects specialist contractors Detail design by specialist contractors Clashes between architect’s and specialist contractors’ designs

Developed Traditional Construction Works well if customers and construction companies use well established technologies and contractors have effective coordination systems This is difficult to achieve so developed traditional construction often fails and is being replaced by more developed approaches