Leveraging GIS for Effective Groundwater Monitoring in a Cost Constrained Environment Joshua Cimera 1 ; John Mansfield 1 ; Dale Prewett 1 ; Peter King.

Slides:



Advertisements
Similar presentations
Mobile GIS.
Advertisements

Mobile Computing: Trials and Tribulations This presentation follows the concept to current state timeline of mobile computing at Fidelity E&P. Trials,
Partnership Acknowledgment
Our Vision Healthy, resilient and increasingly productive landscapes supporting vibrant communities Integration of the Farm Water Program with the Goulburn.
Facilitating a Dialog between the NSDI and Utility Companies J. Peter Gomez Manager, Information Requirements, Xcel Energy.
Web Enabled Enterprise Integration Insert Product Photograph Here.
What’s New in ArcGIS Desktop
June 11, 2008West Virginia GIS Conference 2008 Integration of Mobile GIS Technologies in the West Virginia Department of Environmental Protection Bond.
Middle Verde Geospatial Database Project Rob Ross and Abe Springer Arizona Water Institute Geospatial Research and Information Laboratory Northern Arizona.
Functions of GIS 30/04/2010. Major Functions of GIS 1. Data Capture Data used in GIS often come from many different sources, are of many types, and are.
Graffiti Reporting A partnership of Local and State Government; My Local Services App enhancements.
Food and Agriculture Organization of the United Nations Land and Water Division AQUASTAT FAO’s global information system.
Progress Report : Design and Creation of a Geodatabase on the Colorado River Refuge Owned by Pines and Prairies Land Trust Arma-Geo Products Geography.
Monitoring SHLAA Smart Sustainability appraisal employment retail GIS housing start date 2 no. 3 bedrooms 2.57 ha 34 dwellings remaining outline planning.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Oregon GIS Utility & Hazard Surveys Webex Session.
1 Tonight’s Topic Outline Overview of Business Units & Use Cases Overview of Business Units & Use Cases Sample Schemas and Models Sample Schemas and Models.
NatStats ‘08 Conference “The importance of water data for National Water Reform” Ken Matthews Chairman and CEO National Water Commission Friday, 21 November.
A Decision Support System For Civil Protection Prof. Thanasis Ziliaskopoulos University of Thessaly Hellenic Institute of Transport International Conference.
U.S. Department of the Interior U.S. Geological Survey USGS National Hydrography Dataset Stewardship in West Virginia George Heleine USGS NHD POC Region.
How GIS and Land Surveying at Created by: Riley Lindsay Created by: Riley Lindsay can help local government?
High-Level Assessment Month Year
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
Intro. To GIS Lecture 4 Data: data storage, creation & editing
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California Configuring ArcGIS.
E X P E R I E N C E Y O U R A M E R I C A National Park Service U.S. Department of the Interior Cape Hatteras National Seashore Threatened bird tracking.
Prepared by: Jennifer McKee With support from: in partnership with: Introduction to ArcPad NSF DUE
IAL Conference, June 2012 Irrigation Modernisation: A Partnership Approach in the SA Murray-Darling Basin Region Brenton Fenwick 1 and Michael Cutting.
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California ArcGIS for Local Government.
Introduction to ArcGIS for Environmental Sciences Day 2 – Fundamentals Module 8 Creating & Editing Data Creating Metadata.
Technical Workshops | Esri International User Conference San Diego, California ArcGIS for Local Government’s Address Maps and Apps Scott Oppmann Allison.
GEOGRAPHICAL INFORMATION SYSTEM (GIS)
material assembled from the web pages at
Nationally Significant Databases and Collections Providers’ Group Emma Kelly Environmental Information Advisor Environmental Monitoring and Reporting Team.
GIS Business Case and Geodatabase Review Solid Waste Authority April 2, 2008.
ArcGIS for Local Government’s Capital Project Planning Maps and Apps Scott Oppmann.
IAL Conference 2012 Farm Water Program Presented by Carl Walters (for Megan McFarlane) Goulburn Broken CMA 26 th of June 2012.
Didymo Samples Database - a web-based tool www. didymosamplesdb. org
Address Maps and Apps for State and Local Governments
The Non-tidal Water Quality Monitoring Network: past, present and future opportunities Katie Foreman Water Quality Analyst, UMCES-CBPO MASC Non-tidal Water.
An Exploratory Approach to Geographic Multimedia Data Management for Bond Forfeiture Program in West Virginia Yueming Wu, Ph.D., GISP Sarah Clapham West.
Utilizing Handheld GIS Technology Wisconsin Land Information Association Annual Conference.
ArcGIS Data Reviewer: An Introduction
Modernisation Implementation Lessons An Operational Viewpoint Geoffrey Enever Head of Customer Service Goulburn Murray Water DM#
Richard Taylor, Thomas Civil & Environmental Consultants h PWC’15 - September 2015 Challenges to Asset Management in the Pacific.
Esri UC 2014 | Technical Workshop | ArcGIS for Windows Mobile - An Introduction Sunee Puckdee, Rui Ge, Morgan Zhang.
New Zealand Department for Courts Case Management System.
MURRUMBIDGEE CATCHMENT MANAGEMENT AUTHORITY Presentation to UNESCO HELP Meeting 4 March 2005 Lee O’Brien - Chairperson Murrumbidgee Catchment Management.
Our Catchments Our Communities Integrated Catchment Management in Victoria Consultation draft.
FAST Budget and Forecasting Rob McMicking
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Post Falls Empowers the Water Dept. with GIS and Spatial IM.
Nexus XP Death Care Management Software for Tomorrow.
Future needs and plans for ocean observing in the Arctic AOOS Arctic Town Hall Futur Zdenka Willis Integrated Ocean Observing System National Program Office.
David McPhee & John Cameron Victorian Regional Water Monitoring Partnership Coordinators.
Mobile GIS in Local Government to enhance Service Delivery Total Geo-spatial Information Solutions Johann Engelbrecht Director.
Introduction to FFI: Why and how FFI was developed Introduction to FFI: Why and how FFI was developed 04/02/2013.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
TASMANIAN JURISDICTIONAL UPDATE DCDB National Workshop28-30 July 2010 Andrew Tomes Manager - Spatial Data & Julian Gill Program Leader - Cadastral & Transport.
Esri UC 2014 | Technical Workshop | Address Maps and Apps for State and Local Government Allison Muise Nikki Golding Scott Oppmann.
EsdToolkit CLG - Supporting Local Information Systems Wendy Chong – Regeneration Performance and Digital Inclusion 12 June, 2008.
Mobilize Your Workforce Overview of Maximo Anywhere & Everyplace Steven Shull Projetech Solution Architect/Development Lead Gina Adkins Leonard IBM Maximo.
General process of discussion
National Hydrology Project
Integration of Mobile GIS Technologies in the West Virginia Department of Environmental Protection Bond Forfeiture Program Sarah Clapham and Yueming.
Business Environment Dr. Aravind Banakar –
Business Environment
Business Environment
Tracking and Traceability for Pipes, Fittings, and Fusions
Groundwater Sustainability
ArcGIS for Local Government’s Address Maps and Apps
Presentation transcript:

Leveraging GIS for Effective Groundwater Monitoring in a Cost Constrained Environment Joshua Cimera 1 ; John Mansfield 1 ; Dale Prewett 1 ; Peter King 1 ; Carl Walters 2 Goulburn Murray Water 1 ; Goulburn Broken CMA 2

Partnership Acknowledgment This project is funded as part of the Goulburn Broken Catchment Management Authority Regional Catchment Strategy in the Shepparton Irrigation Region and is provided with support and funding from the Australian Government and Victorian Government. This project is delivered primarily through partnerships between the Department of Environment and Primary Industries, Goulburn-Murray Water, the Goulburn Broken Catchment Management Authority and other bodies.

Background Previous Approach New Approach Indicative Cost Savings Role of GIS Future Work Presentation Outline

Groundwater Monitoring Program jointly funded –Goulburn Broken CMA (50%) –Goulburn Murray Water (50%) Funding constraints have required the program to be reviewed Background

Previous Approach Identified Problems: - the purpose for which the data was collected was not clear; - a lot of data was being collected for the “common good” without contribution from other beneficiaries; - due to the number of bores, maintenance was being neglected.

New Approach Identified that there were four purposes for which data was required Identified it was feasible to have only one program with four sub-programs aligned with each purpose. The four purposes/subprograms: –Environmental –Public Pump Operation –Adaptive Management –Watertable Mapping

Why are we even monitoring groundwater?

9 Public Pump Operation

Role of GIS Desktop Assessment Field Verification Mobile Mapping

Desktop Bore Assessment GIS used to collate existing information and assign to each monitoring bore –Depth, screen intervals, etc –Monitoring history – reliable data source? Ability to interrogate bore info with other datasets –Roads –Public or private land –GMW assets (ie Salinity Control Pumps) –Environmental Assets

Field Verification ArcGIS for Windows Mobile deployed on a GPS enabled Motion Tablet Drop down menus for standardised responses Allowance for some general comments that aren’t covered by drop down answers Bore locations able to be updated in the field by operator Enables disconnected data editing

Bore Assessment

Mobile Mapping

Update coordinates

Menu

Drop Down Menus

Date Entry

Waterlevel Entry

Data Sync to Corporate Spatial Database

Deployed Tablets 3G Network Corporate Spatial Database Public Pump Operation Watertable Maps

Indicative Cost Savings Saving of $6,000 per month

Next Steps Finalise the monitoring program based on field assessments Fully integrate the monitoring program with GMW’s asset management system, Maximo Add track feature to record the ‘way-in’ to difficult to find bores Automate some of the manual transfer of data between GMW corporate systems Upgrading of key monitoring bores

Questions?? Before After