Doc.: IEEE 802.11-09/0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) P802.11u Report to EC on Conditional Approval to go.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0715r0 Submission July 2009 Stephen McCann (RIM) Slide 1 P802.11u Report to EC on Approval to go to Sponsor Ballot Date: Authors:
Advertisements

Doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0715r9 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) P802.11u Report to EC on Conditional Approval to go.
Doc.: 11-10/895r3 Submission July 2010 Dee Denteneer (Philips), Bruce Kraemer (Marvell) Slide 1 P802.11s Report to EC on Conditional Approval to go to.
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11u Report to EC on Conditional Approval to.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
Presentation transcript:

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot Authors: NameAffiliationAddressPhone Stephen McCann Research in Motion 200 Bath Road, Slough, Berks, SL1 3XE, UK Bruce KraemerMarvell 5488 Marvell Lane, Santa Clara, CA (321) Slide 1

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Introduction This document contains an updated report to the IEEE 802 Executive Committee completing conditional approval to send the IEEE P802.11u Draft to Sponsor Ballot. Revision 5 of this document ( r5) was approved during the closing plenary session of the working group on 17 July –Passed in the Task Group yes 14, no 1, abstain 0 –Passed in the Working Group yes, no, abstain Slide 2

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) September 2009 status after LB156 Recirculation ballot LB156 was completed on 18 August 2009 according to the schedule presented on slide #12 The approval percentage from LB156 is 93%. September 2009 Slide 3

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) LB156 required comments resolution There was 1 new valid DISAPPROVE vote with 1 required comment (CID 8001), but the voter then changed his required comment to not required on 22 nd September 2009 (slide #5). There were 4 new required comments (CIDs 8015, 8016, 8013, 8014) from 1 existing DISAPPROVE voter, but the voter then changed these to not required on 22 nd September 2009 (slide #6). September 2009 Slide 4

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) -----Original Message----- From: Liwen CHU Sent: 22 September :14 To: Stephen McCann Subject: RE: LB156 - IEEE u Draft 8.0 Comments Hi Stephen, Yes, I can change my comment to "T". Best Regards Liwen -----Original Message----- From: Stephen McCann Sent: Monday, September 21, :47 PM To: Subject: LB156 - IEEE u Draft 8.0 Comments Liwen, TGu is currently addressing comments from LB156 and notes that you have 1 technical required "TR" comment. TGu currently has 4 "TR" comments and 1 "ER" comment. To allow TGu to progress to sponsor ballot, would you be willing to change your comment to "T", so that it is no longer a "TR". Thanks September 2009 Slide 5

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) -----Original Message----- From: Sent: 22 September :28 To: Stephen McCann Subject: Re: LB156 - IEEE u Draft 8.0 comments Yes I am okay with this. Alastair Malarky -----Original Message----- "Stephen McCann" 09/21/ :51 PM To Subject LB156 - IEEE u Draft 8.0 comments Alastair, TGu is currently addressing comments from LB156 and notes that you have 3 technical required "TR" comment and 1 editorial required "ER" comment. In total TGu currently has 4 "TR" comments and 1 "ER" comment. To allow TGu to progress to sponsor ballot, would you be willing to change your comments to "T" and "E", so they are no longer "required?" Thanks September 2009 Slide 6

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) WG Letter Ballot Results – P802.11u Ballo t ID Ballot Close Date TitleBallotTypePoolReturn%Rtn Abstai n %AbsApprove Disa ppr ove %Approve July 2008 Technical Letter Ballot for IEEE u_D3.0 Technical October 2008 Recirculation Letter Ballot for IEEE u_D4.0 Recirculation February 2009 Recirculation Letter Ballot for IEEE u_D5.0 Recirculation April 2009 Recirculation Letter Ballot for IEEE u_D6.0 Recirculation June 2009 Recirculation Letter Ballot for IEEE u_D7.0 Recirculation Aug 2009 Recirculation Letter Ballot for IEEE u_D8.0 Recirculation Slide 7

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) WG Letter Ballot Comments – P802.11u Ballot ID Ballot Close Date TitleBallot Type Number of Comments received July 2008 Technical Letter Ballot for TGu Draft 3.0 Technical944 (525 T, 419 E) 1378 Oct 2008 Recirculation Letter Ballot for TGu Draft 4.0 Recirculation871 (487 T, 384 E) Feb 2009 Second Recirculation Ballot for TGu Draft 5.0 Recirculation241 (35 T, 206 E) April 2009 Third Recirculation Ballot for TGu Draft 6.0 Recirculation229 (125 T, 104 E) Jun 2009 Fourth Recirculation Ballot for TGu Draft 7.0 Recirculation225 (118 T, 107 E) Aug 2009 Fifth Recirculation Ballot for TGu Draft 8.0 Recirculation68 (24 T, 44 E) Slide 8

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Unsatisfied comments by commenter Voter1LB132LB137LB142LB148LB152 Total Gabor Bajko15 Clint Chaplin12021 Peter Ecclesine44 Darwin Engwer22 Tom Kolze Alastair Malarky88 Henry Ptasinski Richard Roy66 Dorothy Stanley Alexander Tolpin11 George Vlantis223 Qi Wang66 Total Slide 9

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Unsatisfied Comments – Topics Topic#Comments Interworking15 Generic Advertisement Service44 Subscription Provider Interface15 Emergency Services11 Editorial28 Other10 Total121 Slide 10

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. Slide 11

doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) TGu Timeline OpenClose Third recirculation (TGu draft 8.0)26-Jul-0910-Aug-09 Clean recirculation (TGu draft 8.0)28-Sep-0913-Oct-09 Pool formation15-Aug-0929-Sep-09 First sponsor ballot21-Oct-0920-Nov-09 Second sponsor ballot31-Jan-1015-Feb-10 Third sponsor ballot17-Mar-102-Apr-10 Fourth sponsor ballot1-May-1016-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Sep-10 Slide 12