doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot Authors: NameAffiliationAddressPhone Stephen McCann Research in Motion 200 Bath Road, Slough, Berks, SL1 3XE, UK Bruce KraemerMarvell 5488 Marvell Lane, Santa Clara, CA (321) Slide 1
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Introduction This document contains an updated report to the IEEE 802 Executive Committee completing conditional approval to send the IEEE P802.11u Draft to Sponsor Ballot. Revision 5 of this document ( r5) was approved during the closing plenary session of the working group on 17 July –Passed in the Task Group yes 14, no 1, abstain 0 –Passed in the Working Group yes, no, abstain Slide 2
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) September 2009 status after LB156 Recirculation ballot LB156 was completed on 18 August 2009 according to the schedule presented on slide #12 The approval percentage from LB156 is 93%. September 2009 Slide 3
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) LB156 required comments resolution There was 1 new valid DISAPPROVE vote with 1 required comment (CID 8001), but the voter then changed his required comment to not required on 22 nd September 2009 (slide #5). There were 4 new required comments (CIDs 8015, 8016, 8013, 8014) from 1 existing DISAPPROVE voter, but the voter then changed these to not required on 22 nd September 2009 (slide #6). September 2009 Slide 4
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) -----Original Message----- From: Liwen CHU Sent: 22 September :14 To: Stephen McCann Subject: RE: LB156 - IEEE u Draft 8.0 Comments Hi Stephen, Yes, I can change my comment to "T". Best Regards Liwen -----Original Message----- From: Stephen McCann Sent: Monday, September 21, :47 PM To: Subject: LB156 - IEEE u Draft 8.0 Comments Liwen, TGu is currently addressing comments from LB156 and notes that you have 1 technical required "TR" comment. TGu currently has 4 "TR" comments and 1 "ER" comment. To allow TGu to progress to sponsor ballot, would you be willing to change your comment to "T", so that it is no longer a "TR". Thanks September 2009 Slide 5
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) -----Original Message----- From: Sent: 22 September :28 To: Stephen McCann Subject: Re: LB156 - IEEE u Draft 8.0 comments Yes I am okay with this. Alastair Malarky -----Original Message----- "Stephen McCann" 09/21/ :51 PM To Subject LB156 - IEEE u Draft 8.0 comments Alastair, TGu is currently addressing comments from LB156 and notes that you have 3 technical required "TR" comment and 1 editorial required "ER" comment. In total TGu currently has 4 "TR" comments and 1 "ER" comment. To allow TGu to progress to sponsor ballot, would you be willing to change your comments to "T" and "E", so they are no longer "required?" Thanks September 2009 Slide 6
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) WG Letter Ballot Results – P802.11u Ballo t ID Ballot Close Date TitleBallotTypePoolReturn%Rtn Abstai n %AbsApprove Disa ppr ove %Approve July 2008 Technical Letter Ballot for IEEE u_D3.0 Technical October 2008 Recirculation Letter Ballot for IEEE u_D4.0 Recirculation February 2009 Recirculation Letter Ballot for IEEE u_D5.0 Recirculation April 2009 Recirculation Letter Ballot for IEEE u_D6.0 Recirculation June 2009 Recirculation Letter Ballot for IEEE u_D7.0 Recirculation Aug 2009 Recirculation Letter Ballot for IEEE u_D8.0 Recirculation Slide 7
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) WG Letter Ballot Comments – P802.11u Ballot ID Ballot Close Date TitleBallot Type Number of Comments received July 2008 Technical Letter Ballot for TGu Draft 3.0 Technical944 (525 T, 419 E) 1378 Oct 2008 Recirculation Letter Ballot for TGu Draft 4.0 Recirculation871 (487 T, 384 E) Feb 2009 Second Recirculation Ballot for TGu Draft 5.0 Recirculation241 (35 T, 206 E) April 2009 Third Recirculation Ballot for TGu Draft 6.0 Recirculation229 (125 T, 104 E) Jun 2009 Fourth Recirculation Ballot for TGu Draft 7.0 Recirculation225 (118 T, 107 E) Aug 2009 Fifth Recirculation Ballot for TGu Draft 8.0 Recirculation68 (24 T, 44 E) Slide 8
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Unsatisfied comments by commenter Voter1LB132LB137LB142LB148LB152 Total Gabor Bajko15 Clint Chaplin12021 Peter Ecclesine44 Darwin Engwer22 Tom Kolze Alastair Malarky88 Henry Ptasinski Richard Roy66 Dorothy Stanley Alexander Tolpin11 George Vlantis223 Qi Wang66 Total Slide 9
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Unsatisfied Comments – Topics Topic#Comments Interworking15 Generic Advertisement Service44 Subscription Provider Interface15 Emergency Services11 Editorial28 Other10 Total121 Slide 10
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. Slide 11
doc.: IEEE /0715r7 Submission September 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) TGu Timeline OpenClose Third recirculation (TGu draft 8.0)26-Jul-0910-Aug-09 Clean recirculation (TGu draft 8.0)28-Sep-0913-Oct-09 Pool formation15-Aug-0929-Sep-09 First sponsor ballot21-Oct-0920-Nov-09 Second sponsor ballot31-Jan-1015-Feb-10 Third sponsor ballot17-Mar-102-Apr-10 Fourth sponsor ballot1-May-1016-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Sep-10 Slide 12