Omniran-14-0020-00-ecsg 1 OmniRAN EC SG March 2014 Opening Report Chair: Max Riegel (NSN)

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Emergency Services EC SG Report to 802 EC Geoff Thompson/Interdigital Study Group Chair (as appointed by 802 chair) 802 Executive Committee Friday Session.
Doc.: _SEC_Motions_Jul06 Submission July Motion to SEC Motion by: LynchSeconded by: Agenda: 9.02 Date: 07/21/2006 Time: 3:20.
Project Planning Adhoc: WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0022 Date Submitted:
Doc.: IEEE /0943r0 Agenda September 2013 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc September 2013 Agenda Date: Authors:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Page 1 Agenda and General Information IEEE > >, >
VOORBLAD.
Doc.: IEEE /0144r3 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Doc.: IEEE OmniRAN-14/0008r0 Submission January 2014 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE OmniRAN-13/0092r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE /1442r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Submission doc.: IEEE 802-EC-13/0033r0 July 2013 Jon Rosdahl, CSRSlide 1 ExSec Agenda Items July 2013 Plenary Date: Authors:
Omniran ecsg 1 OmniRAN EC SG November 2013, Dallas, TX EC closing report Max Riegel (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG Report and Motion for the Mar 2014 closing EC meeting OmniRAN EC SG Chair: Max Riegel (NSN)
Omniran ecsg 1 IEEE 802 OmniRAN EC SG July 2013 Report Max Riegel (EC SG Chair)
Doc.: IEEE OmniRAN-13/0069r0 Submission September 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Omniran ecsg 1 OmniRAN EC SG March 2013 Closing Report Chair: Max Riegel, NSN.
Doc.: IEEE OmniRAN-13/0053r0 Submission July 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
Doc.: IEEE DySPAN-SC MTNG 5 th General Meeting of IEEE DySPAN-SC June 25-28, 2012 June 2012 Yohannes Alemseged (NICT) Slide 1 5 th General Meeting.
IEEE 802 Meeting Participation by Country November 2011 Jodi Haasz Standards Strategist International Standards Programs.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
Weekly Attendance by Class w/e 6 th September 2013.
Doc.: IEEE /1586r0 Agenda January 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Omniran ecsg 1 OmniRAN EC SG July 2013 Liaison Report Chair: Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG September 27 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG October 4 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG October 4 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG October 10 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides September 2013, York, UK Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides March 2014, Beijing, China EC SG Chair Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report to EC SG Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides July 2013, Geneva, CH Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG July 2013 Opening Report Chair: Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides March 2014, Beijing, China EC SG Chair Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG February 26 th, 2014 Conference Call Max Riegel (OmniRAN SG Chair)
OmniRAN EC SG Proposals towards IEEE 802.1
OmniRAN EC SG Agenda May 2013, Waikoloa, HI
OmniRAN EC SG Agenda May 2013, Waikoloa, HI
IEEE OmniRAN TG July 2014 F2F Meeting
OmniRAN EC SG Agenda and Meeting Slides July 2013, Geneva, CH
Presentation transcript:

omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report Chair: Max Riegel (NSN)

omniran ecsg 2 OmniRAN EC SG Status and Objectives OmniRAN PAR proposal on IEEE 802.1CF Recommended Practice: ‘Network Reference Model and Functional Description of IEEE 802 Access Network’ was approved by IEEE 802 EC on November 15 th, 2013 – ecsg-approved-par-clean.pdfhttps://mentor.ieee.org/omniran/dcn/13/omniran ecsg-approved-par-clean.pdf The PAR is on the NesCom agenda for approval on March 26 th, 2014 –IEEE 802.1CF project starts after NesCom approval OmniRAN EC SG was extended in November 2013 until March 2014 to take care of the PAR approval by NesCom. OmniRAN EC SG will ask for another extension in the EC closing plenary, just for the case that NesCom asks for additional input. –BTW: A Study Group is disbanded upon approval of the PAR by the IEEE-SA Standards Board.

omniran ecsg 3 Agenda for March 2014 Session Approval of minutes Reports Example contributions to the intended specification Outline of the intended specification Organization of the work –Cooperation with the other IEEE 802 WGs Operation within IEEE Location of May 2014 session Conference calls until May 2014 session Motion to extend the ECSG until July 2014 Liaison report to IEEE 802 WGs AOB

omniran ecsg 4 Mar 2014 Agenda Graphics Mon 3/17Tue 3/18Wed 3/19Thu 3/20Fri 3/21 08:00 10:00 EC Opening Plenary ARCWireless SDN BoF OmniRAN Opening Meeting 10:30 12: / Mid-week Plenaries OmniRAN Closing Meeting Opening Plenary EC Closing Plenary 13:30 15: Closing Plenary 16:00 18:00

omniran ecsg 5 OmniRAN ECSG Resources Website: Document Archive on mentor: reflector: archive: Attendance: Paper list (normative) + IMAT –IMAT mandatory for participants seeking attendence credits –Reciprocal rights for most WGs