Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.

Slides:



Advertisements
Similar presentations
Doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Advertisements

Doc.: 11-10/895r3 Submission July 2010 Dee Denteneer (Philips), Bruce Kraemer (Marvell) Slide 1 P802.11s Report to EC on Conditional Approval to go to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11u Report to EC on Conditional Approval to.
Doc.: IEEE /1447r3 Submission November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors: P802.11ad Report to EC on Conditional.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 August 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
Presentation transcript:

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot Authors: NameAffiliationAddressPhone Michael Montemurro Research in Motion 4501 Tahoe Blvd, Mississauga, ON. CANADA L4W 0B4 +1 (905) Bruce KraemerMarvell 5488 Marvell Lane, Santa Clara, CA, USA (321)

doc.: 11-11/0962r2 Submission July 2009 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11ae Draft 6.0 to Sponsor Ballot. This document (11-09/962r2) was approved during the closing plenary session of the working group on 22 July –Passed in the Task Group yes, no, abstain –Passed in the Working Group yes, no, abstain

doc.: 11-11/0962r2 Submission P802.11ae Draft Stability DraftDateNumber of Pages 1.0Nov Feb Apr Jun Jul July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 3

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide WG Letter Ballot Results – P802.11ae Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Dec 2010 Technical Letter Ballot for TGae draft 1.0 Technical Feb 2011 First Recirculation Ballot for TGae draft 2.0 Recirculation Apr 2011 Second Recirculation Ballot for TGae draft 3.0 Recirculation Jun 2011 Third Recirculation Ballot for TGae draft 4.0 Recirculation Jul 2011 Post letter ballot vote changes Recirculation

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide WG Letter Ballot Comments – P802.11ae Ballot ID Ballot Close Date TitleBallot Type Number of Comments received Dec 2010 Technical Letter Ballot for TGae Draft 1.0 Technical461 (309 T, 152 E) Feb 2011 Recirculation Letter Ballot for TGae Draft 2.0 Recirculation386 (246 T, 140 E) Apr 2011 Second Recirculation Ballot for TGae Draft 3.0 Recirculation142 (58 T, 84 E) Jun 2011 Third Recirculation Ballot for TGae Draft MC Recirculation79 (54 T, 25 E)

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 6 Unsatisfied comments by commenter VoterLB169LB172LB176LB180Total Liwen Chu77 Harish Ramamurthy718 Sudhir Srinivasa325 Solomon Trainin33 Hongyuan Zhang11 Total133824

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 7 Unsatisfied Comments – Topics Topic#Comments Default MFQ Policy8 MFQ Policy Negotiation5 MFQ Priority Signaling6 Cryptographic Encapsulation4 MLME1 Total24

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 8 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.

doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 9 TGae Timeline OpenClose Fourth recirculation (TGae D5.0)25-Jul-119-Aug-11 Fifth recirculation (TGae D6.0)15-Aug-1130-Aug-11 First sponsor ballot9-Sep-119-Oct-11 Second sponsor ballot16-Nov-111-Dec-11 Third sponsor ballot16-Jan-1231-Jan-12 Fourth sponsor ballot27-Feb-1213-Mar-12 EC to RevCom Mar-12 RevCom to SB Jun-12