Doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on ITU-R Activities In October/November ITU-R held two.
Advertisements

Submission January 2011 Michael Lynch, MJ Lynch & Associates RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID.
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE Submission July 2007 John Notor, Cadence Design Systems, Inc.Slide 1 Overview of FCC ET FNPRM ISM Band Spectrum.
Doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.
ITU-R Liaison Group Report - Session #60 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0021r1.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE Submission March 2006 Michael Lynch, Nortel RR-TAG Opening Report Report on January 06 Interim Meeting Work to.
Doc.: IEEE Submission March 2006 Michael Lynch, Nortel RR-TAG Opening Report Report on March 06 Plenary Meeting Work accomplished.
ITU-R Liaison Group Report - Session #63 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0088r1.
Doc.: 18-14/0021 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-13/0107 Submission November, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: 18-12/0111 Submission November, 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: Submission November 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-12/0022 Submission March 2012 MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE sru Submission November 2011 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
11 ITU-R Liaison Group Report - Session #84 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
Doc.: 18-11/58r0 Submission July 2011 John Notor, Notor ResearchSlide 1 Summary of ITU-R Documents Notice: This document has been prepared to assist IEEE.
ITU-R Liaison Group Report - Session #80 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
IEEE ITU-R Liaison Group Closing Report – Session #81 [IEEE Mentor Presentation Template (Rev. 0)] Document Number: IEEE Gdoc.
11 ITU-R Liaison Group Report - Session #82 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
11 ITU-R Liaison Group Report - Session #80 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
ITU-R Liaison Group Report - Session #78 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
Doc.: IEEE /1495r /0059r0 Submission Sep 2006 Denis Kuwahara, BoeingSlide 1 RR-TAG Liaison Report IEEE Notice: This document.
Doc.: IEEE /0989r /0045r1 Submission July 2006 Denis Kuwahara, BoeingSlide 1 RR-TAG Liaison Report IEEE Notice: This document.
Doc.: 18-14/0055 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-14/0014 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE /0008r0 & /0199r0 Submission January 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Jan07 IEEE
Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-12/0036 Submission March 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-12/0076 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
March 2013 doc.: IEEE m Submission 1 Soo-Young Chang (SYCA) Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
11 ITU-R Liaison Group Report - Session #74 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
Submission doc.: IEEE /0089r1 January 2015 Steve Shellhammer, QualcommSlide 1 3GPP LAA Liaison Approval Process Date: Authors: Notice:
Doc.: 19-11/81r1 Submission July 2011 Junyi Wang, NICTSlide Liaison Report Notice: This document has been prepared to assist IEEE It is.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
ITU-R Liaison Group Report - Session #73 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0029 Date.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
Doc.: 18-14/0078 Submission November, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: IEEE /0047r0 Submission March 2012 Reinhard Gloger, Nokia Siemens NetworksSlide Liaison Report Notice: This document has been prepared.
Doc.: 18-15/0043 Submission July 17 th, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0034 Submission July, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE /0032r02 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Submission March 2011 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the January 2011 interim meeting Work.
Liaison Report from Date: July 16, 2015 July 2015 Month Year
Sept 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
RR-TAG Liaison Report May 2007 IEEE
RR-TAG Opening Report Report of the March 2009 plenary meeting
IEEE Liaison Report to IEEE
RR-TAG Liaison Report IEEE
Liaison Report from Date: September 20, 2012 September 2012
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE – Liaison Report] Date.
ITU-R Liaison Group Report - Session #80 Closing Plenary
ITU-R Liaison Group Report - Session #78 Closing Plenary
RR-TAG Closing Report Report of September 2008 plenary meeting
RR-TAG Liaison Report Mar07 IEEE
RR-TAG Liaison Report IEEE
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
March 2011 RR-TAG Opening Report
ITU-R Liaison Group Report - Session #52 Opening Plenary
RR-TAG Liaison Report IEEE
RR-TAG Liaison Report Jan07 IEEE
Presentation transcript:

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Date: July 16, 2012 Authors:

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 2 Overview This document reports on the regulatory matters considered and outputs from the Waikoloa and the May wireless interim in Atlanta.. Specific documents/actions were approved by the RR-TAG in response to the regulatory proceedings reviewed and inputs from various WGs. The RR-TAG is input driven. The attendance varies depending on the topics & documents being considered. E.g. one session in Atlanta had 25 people from different WGs helping draft an output. It has been suggested that outputs be made available to the EC 48 hours in advance. Also suggested is that outputs do not go to the closing EC plenary but be reviewed and submitted ( documents) or approved by a 10 day EC ballot (802 documents). The 48 rule would make it difficult for those WGs with mid week plenaries. Either may cause missed filing dates. Shortening the number of sessions would further complicate matters.

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 3 FCC Proceedings Considered in March at Waikoloa THE FCC WTB AND THE OFFICE OFENGINEERING AND TECHNOLOGY SEEK COMMENT ON PROGENY’S M-LMS FIELD TESTING REPORT (Docket No ) (18-12/21r1) Comment Date: March 15, 2012, Comment Date: March 30, –The RR-TAG approved to say that Progeny has failed to meet the FCC’s waiver requirements. The EC approved and the RR-TAG chair made the necessary edits and filed it with the FCC. FCC SEEKS COMMENT ON CERTAIN WIRELESS SERVICE INTERRUPTIONS. (DA No ). (Dkt No ) FCC seeks comment on concerns and issues related to intentional interruptions of wireless service by government authorities for the purpose of ensuring public safety. Comments Due: 04/30/2012. Reply Comments Due: 05/30/2012(18-11/101r0). –The RR-TAG recognized that in this proceeding the fact that many phones have a Wi-Fi capability that would allow them to continue to operate. It was decided to keep silent on that fact as it could impact IEEE technology.

doc.: 18-12/0058 Submission ITU-R Items Considered in March at Waikoloa The RR-TAG chair presented to the opening EC plenary data on Question ITU-R 236/1 which is likely to have an impact on several IEEE 802 technologies. The question is contained in doc and is being considered in ITU-R WP1A, Spectrum Engineering Techniques, whose parent group is ITU-R SG1, Spectrum Management. While the question was originally developed to deal with PLC/PLT issues it has been expanded to include wireless as well as wired technologies and asks: “What are the technical and operating features and the characteristics of wireless technologies and devices in support of power grid management systems?” “What are the data rates, bandwidths, frequency bands and spectrum requirements needed in support of power grid management systems?” July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 4

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 5 ITU-R Items Considered in March at Waikoloa (2) “What are the interference considerations to radiocommunications associated with the implementation of wireless and wired technologies and devices used in support of power grid management systems?” “How will spectrum availability be affected by interference associated with widespread deployment of such technologies and devices?” The outcome of this question will be the identification of spectrum, technologies, bandwidths and data rates for wireless Smart Grid management. The RR-TAG chair recommended to the EC that IEEE 802 make an initial input to the June, 2012 meeting of ITU-R WP1A. While the EC has taken initial steps to form an EC SG unless the wireless WGs step forward at their May Interim and develop an initial input IEEE 802 will miss the 2012 opportunity. The 2013 opportunity will be to find a way to counter what others, such as the IMT-Advanced/LTE interests, will have input to WP1A. The choice is clear – lead, follow

doc.: 18-12/0058 Submission ITU-R Items Considered in March in Waikoloa (3) or get out of the way. The latter would mean to ignore the ITU-R wireless related Smart Grid work and trust others to look after IEEE 802’s interests. The current pace seems to suggest that IEEE 802 will at best “follow” what develops in ITU-R WP1A rather than lead. On Thursday the RR-TAG reviewed, edited and approved three documents from IEEE There were two going to ITU-R WP5D (IMT-Systems) and one to ITU-R WP5A (Land mobile service above 30 MHz (excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services). Their parent group is ITU-R SG5 (Terrestrial Services). IEEE is the only WG with any interest/connection with ITU-R WP5D. All three were approved by the EC and will be edited if needed and submitted by the RR-TAG chair in his additional role of IEEE SA Technical Liaison to ITU-R. The documents were: July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 6

doc.: 18-12/0058 Submission ITU-R Items Considered in March in Waikoloa (4) , “Update of WireLESSMAN-ADVANCED RADIO INTERFACE of Recommendation ITU-R M To be sent to WP5D , “OFDMA TDD WMAN Submission Toward Revision 11 of Recommendation ITU-R M.1457 (Meeting x+2). To be sent to WP5D , LIAISON STATEMENT TO ITU-R WP 5A ON “WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R [LMS.CRS2]”. To be sent to WP5A. July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 7

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 8 Other Items From the March Waikoloa Meeting On Thursday PM1 IEEE presented a document ( ) titled “THE IEEE 802 LAN/MAN STANDARDS COMMITTEE POSITION ENDORSING WORLD-WIDE LICENSE-EXEMPT USAGE OF THE TELEVISION BAND WHITESPACES”. It was narrowly approved in the RR-TAG (3/2/1). During discussion at the EC Closing Plenary the IEEE chair withdrew the document. It may, in some other form be presented at the July IEEE 802 Plenary. Important note; Many of the wireless WGs have difficulty developing a final document to bring to prior to Thursday afternoon. In the past those documents approved by were sent to the EC on Thursday after completed the work. For various reasons that did not happen this time. A review of my log shows that proposals for the EC to consider were still being submitted on Friday morning. While will adhere to the “24 hour” rule it may be useful to return to the policy where the EC allowed final approval on all IMT related correspondence with WP5D.

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 9 Other Items From the March Waikoloa Meeting On Thursday PM1 IEEE presented a document ( ) titled “THE IEEE 802 LAN/MAN STANDARDS COMMITTEE POSITION ENDORSING WORLD-WIDE LICENSE-EXEMPT USAGE OF THE TELEVISION BAND WHITESPACES”. It was narrowly approved in the RR-TAG (3/2/1). During discussion at the EC Closing Plenary the IEEE chair withdrew the document. It may, in some other form be presented at the July IEEE 802 Plenary. Important note; Many of the wireless WGs have difficulty developing a final document to bring to prior to Thursday afternoon. In the past those documents approved by were sent to the EC on Thursday after completed the work. For various reasons that did not happen this time. A review of my log shows that proposals for the EC to consider were still being submitted on Friday morning. While will adhere to the “24 hour” rule it may be useful to return to the policy where the EC allowed final approval on all IMT related correspondence with WP5D.

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 10 RR-TAG activity between meetings in April IEEE held two conference calls to complete the action on the contribution that was started at the March IEEE 802 plenary. The first call was held on Monday, April 23 rd, at 10:30 a.m. CDT. There was quite a lot of discussion on the purpose of the contribution to the FCC. The purpose was to encourage the FCC to allow a mix of both licenses exempt (also known as unlicensed) and licensed spectrum in the TV white spaces. After 1.5 hours of discussion the chair recessed the call until 10:30 on April 28 th. It was hoped that the various parties would talk offline. The meeting reconvened on April 25 th. After considerable discussion and further editing the chair called for a vote. A motion was made to approve the text and have the chair forward the document to the 802 EC for approval. The vote within to approve was 5/0/0, however there were a total of 20 interested persons (not all were voters) participating. The EC approved the document and the chair filed it electronically with the FCC.

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 11 ITU-R Items Considered in May in Atlanta The RR-TAG only approved one document during the May wireless interim. The baseline document for that ITU-R contribution was Doc titled “IEEE 802 Comments Supporting License Exempt Usage of TV Band White Spaces – ITU-R” This was a mildly edited version of the document that IEEE 802 submitted to the FCC.. Again there was much discussion about the relevance of this document, especially since it didn’t directly address the referenced document, which contains Question ITU-R 236/1 titled “Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems”. After further discussion of the actual ITU-R WP1A document it was decided to limit this initial IEEE 802 response to only a portion of the questions asked by the ITU-R. This input was approved as After approval by an EC ballot it was submitted to the ITU-R.

doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 12 RR-TAG Items for June and July include:.Submission of by the RR-TAG (as the IEEE SA Technical Liaison to ITU-R) of three previously approved IEEE 802 contributioins. –June – 1 contribution to ITU-R WP5A –July – 2 contributions to ITU-R WP5D For the July IEEE 802 plenary there are: –Responses (or not) to at least 4 if not 5 liaisons received from ITU-R –Comments/contributions to the FCC or other national regulatory bodies as brought forward by the WGs. Further contributions to ITU-R, FCC and other bodies as needed. Don’t forget that for the most part you can maintain your voting rights in your home group when you participate in the RR-TAG (and, of course, log your attendance correctly!).