Doc.: IEEE 802.11-12/0027r1 Submission January 2012 Yongho Seok, LG ElectronicsSlide 1 IP configuration for fast initial link setup Date: 2011-01-12 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0527r0 Submission March 2010 Slide 1 A Periodic 5 MHz Measurement Pilot for Channel Scan Date: Authors:
Advertisements

Doc.: IEEE /1043 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang, Kyungki,
Doc.: IEEE /1177 Submission September 2013 Giwon Park, LG ElectronicsSlide 1 Clarification of the Link Setup Bursty parameter (CID 2547, 3214)
Doc.:IEEE /1523r4 Submission November 2011 Access Delay Reduction for FILS: Network Discovery & Access congestion Improvements Slide 1 Authors:
Submission doc.: IEEE 11-12/0553r0 May 2012 Jarkko Kneckt, NokiaSlide 1 Response Criteria of Probe Request Date: Authors:
Doc.: IEEE /0255r1 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang,
January 2013doc.: IEEE SubmissionSuhwook Kim, LG Electronics Project: IEEE P Working Group for Wireless Personal Area Networks.
May 2012doc.: IEEE SubmissionSuhwook Kim, LG Electronics Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Submission doc.: IEEE /1167r0 August 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Upper Layer Data IE Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /1124r0 August 2011 Hiroki Nakano, Trans New Technology, Inc.Slide 1 Example of IP address assignment using Generic Upper.
Doc.: IEEE /1521r2 Submission January 2012 Marc Emmelmann, FOKUSSlide 1 AP and Network Discovery Enhancements Date: Authors:
Doc.:IEEE /0259r3 Submission March 2012 Reducing Probe Responses for faster AP discovery Slide 1 Authors: March 2012 NameAffiliationsAddressPhone .
Doc.: IEEE /1377r0 Submission November 2013 Jeongki Kim, LG ElectronicsSlide 1 DL efficiency enhancement in high dense network Date:
IEEE j May 2011 Suhwook Kim, LG Electronics Inc. Submission Preliminary proposal for j MBANS Authors: Date: May 02, 2011 NameCompanyAddressPhone .
IEEE j July 2011 Suhwook Kim, LG Electronics Submission Final proposal for j MBANS Authors: Date: July 5, 2011 NameCompanyAddressPhone .
IEEE j July 2011 Suhwook Kim, LG Electronics Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
July 2013doc.: IEEE SubmissionSuhwook Kim, LG Electronics Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0782r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 STA MU-MIMO Group Management Signaling Design Date: Authors:
Doc.: IEEE /1000r0 Submission July 2011 Jihyun Lee, LG ElectronicsSlide 1 TGai FILS Proposal Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /1169r1 Submission January 2012 Jihyun Lee, LG ElectronicsSlide 1 FILS Association Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0550 Submission NameAffiliationsAddressPhone Kiseon RyuLG Electronics10225 Willow Creek Rd, San Diego, CA, 92131, USA +1
Doc.: IEEE /1042r3 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang,
Doc.: IEEE /1042 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang, Kyungki,
Doc.: IEEE /0167r0 Submission May 2011 Jihyun Lee, LG ElectronicsSlide 1 Comments on 238r13 Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0797r0 Submission May 2011 Jihyun Lee, LG ElectronicsSlide 1 Use Case: Mobile hotspot Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0257r1 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang,
Submission doc.: IEEE 11-12/0281r0 March 2012 Jarkko Kneckt, NokiaSlide 1 Recommendations for association Date: Authors:
Doc.: IEEE /0089r0 Submission Listen interval update Jan 2013 Slide 1 Date: Authors: Jinsoo Choi, LG Electronics.
Doc.:IEEE /0259r4 Submission March 2012 Reducing Probe Responses for faster AP discovery Slide 1 Authors: March 2012 NameAffiliationsAddressPhone .
Doc.: IEEE /0897r0 SubmissionJae Seung Lee, ETRISlide 1 Active Scanning considering Operating Status of APs Date: July 2012.
Doc.: IEEE /0061r1 SubmissionJae Seung Lee, ETRISlide 1 Probe Response frame transmission interval Date:
Submission doc.: IEEE 11-12/0553r4 May 2012 Jarkko Kneckt, NokiaSlide 1 Response Criteria of Probe Request Date: Authors:
Submission doc.: IEEE /1034r4 September 2012 Jeongki Kim, LG ElectronicsSlide 1 Enhanced scanning procedure for FILS Date: Authors:
Doc.:IEEE /0258r7 Submission May 2012 Reducing Probe Responses for faster AP discovery Slide 1 Authors: May 2012 NameAffiliationsAddressPhone .
Doc.: IEEE /1042r1 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang,
Doc.: IEEE /1000r1 Submission July 2011 Jihyun Lee, LG ElectronicsSlide 1 TGai FILS Proposal Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0072r0 Submission January 2009 Slide 1 Proxy ARP Issue for Direct Link Setup Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0070r1 January 2012 LG Electronics Inc. Submission Link adaptation in active scanning Author: Date: January 13, 2011 NameCompanyAddressPhone .
Doc.: IEEE /0588r0 Submission PHY power saving feature considerations Slide 1 May 2010 Yujin Noh, LG Electronics Date: Authors: NameAffiliationAddressPhone .
Doc.: IEEE /0263r1 SubmissionJae Seung Lee, ETRI Spec Framework Proposal: Selection of the AP for Scanning Date: Slide 1 March 2012.
Submission doc.: IEEE 11-12/1051r2 Multi-channel information for AP discovery 1 September 2012 HTC Corp. NameAffiliationsAddressPhone Jing-Rong HsiehHTC.
Doc.: IEEE /0042r1 Submission January 2013 Yongho Seok, LG ElectronicsSlide 1 Fast Moving Scan Channel Date: Authors: NameAffiliationsAddressPhone .
Amendment Proposal for TV White Spaces Operation
Omission of Probe Request
Triggering the Broadcast Probe Response
Triggering the Broadcast Probe Response
MU-MIMO STA scheduling strategy and Related PHY signaling
Station Group Management for ah
MU-MIMO STA scheduling strategy and Related PHY signaling
Using Upper Layer Message IE in TGai
FILS Association Date: Authors: Name Affiliations Address
Fast Authentication in TGai
MLME.SCAN-request Date: Authors: Nov 2012 Month Year
GAS procedure in TGai Date: Authors: Mar 2012 Month Year
Reducing the Probe Response transmission
Band adjustment for fasat AP discovery
MU-MIMO STA scheduling strategy and Related PHY signaling
Prioritized Active Scanning in TGai
Access distribution in ai
Identification Signal for Fixed devices
Triggering the Broadcast Probe Response
Channel Selection and Management for 11ac
Fast Authentication in TGai
Amendment Proposal for TV White Spaces Operation
Omission of Probe Request
Access distribution in ai
GAS procedure in TGai Date: Authors: May 2012 Month Year
MLME.SCAN-request Date: Authors: Nov 2012 Month Year
Reducing Probe Responses for faster AP discovery
Month Year doc.: IEEE yy/xxxxr0 May 2012
Presentation transcript:

doc.: IEEE /0027r1 Submission January 2012 Yongho Seok, LG ElectronicsSlide 1 IP configuration for fast initial link setup Date: Authors: NameAffiliationsAddressPhone Jae-Hyung SongLG Electronics LG R&D Complex 533, Hogye-1dong, Dongan-Gu, Anyang, Kyungki, , Korea Jihyun LeeLG Electronics LG R&D Complex 533, Hogye-1dong, Dongan-Gu, Anyang, Kyungki, , Korea Yongho SeokLG Electronics LG R&D Complex 533, Hogye-1dong, Dongan-Gu, Anyang, Kyungki, , Korea

doc.: IEEE /0027r1 Submission Abstract This presentation contains a proposal to allow STAs to reduce initial link set up time through an enhanced IP configuration procedure. Addition of subnet prefix information element into Beacon or Probe Response frame is proposed in this presentation. January 2012 Yongho Seok, LG ElectronicsSlide 2

doc.: IEEE /0027r1 Submission Motivation DHCP IP configuration requires 4-way handshaking procedure for the initial setup, the procedure that takes a considerable amount of time. A STA has to perform the entire IP configuration process, when it attempts to create a connection with an AP. If the STA knows the subnet, to which the AP belongs, ahead of the association, the process of IP configuration can be simplified. If the subnet has not been changed, the STA may reuse the old IP configuration, if and only if that specific IP configuration is not assigned to another STA in the subnet. January 2012 Yongho Seok, LG ElectronicsSlide 3

doc.: IEEE /0027r1 Submission Previous method (1) Single BSS January 2012 Yongho Seok, LG ElectronicsSlide 4

doc.: IEEE /0027r1 Submission Previous method (2) Multiple BSS January 2012 Yongho Seok, LG ElectronicsSlide 5

doc.: IEEE /0027r1 Submission Proposal Add subnet prefix IE in Beacon or Probe Response frames –So that a STA can figure out whether a newly discovered AP belongs to the subnet, with which the STA has the a priori knowledge. –If the AP belongs to the subnet, with which the STA has the a priori knowledge, the STA assumes that it is allowed to use the IP address that it used before, when it tries to associate with the AP. –If the assumption of the STA verifies, the STA and AP can omit the DHCP Discovery and DHCP offer steps in the DHCP IP configuration. –If there are multiple newly discovered APs, the STA can take the subnet information into account, in choosing the AP of interest. January 2012 Yongho Seok, LG ElectronicsSlide 6

doc.: IEEE /0027r1 Submission Proposed method –Multiple BSS January 2012 Yongho Seok, LG ElectronicsSlide 7

doc.: IEEE /0027r1 Submission Proposed method – usage scenario AP selection –While scanning, the STA may find several candidate APs with different subnet prefix. The STA is likely to choose the one in the same subnet in which its old AP resides. By doing so, the STA may not perform DHCP discovery- DHCP offer process. January 2012 Yongho Seok, LG ElectronicsSlide 8

doc.: IEEE /0027r1 Submission Frame format Beacon frame format –Insert the following row in Table 8-19: Probe Response frame format –Insert the following row in Table 8-27: January 2012 Yongho Seok, LG ElectronicsSlide 9 OrderInformationNotes Subnet PrefixThe Subnet Prefix element may be present if dot11FILSActivated is true. OrderInformationNotes Subnet PrefixThe Subnet Prefix element may be present if dot11FILSActivated is true.

doc.: IEEE /0027r1 Submission Frame format Subnet Prefix IE format –Subnet Prefix field indicates network address –Subnet Prefix field format depends on the IP configuration method An example of IPv4 address: x/24 January 2012 Yongho Seok, LG ElectronicsSlide 10 Element ID LengthPrefix TypePrefix LengthSubnet Prefix Octets:1111Variable