doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 BSIG PM Pitch 16Jun00] Date Submitted: [16Jun00] Source: [John Barr] Company [Motorola] Address [50 E. Commerce Drive, Schuamburg, IL 60173] Voice:[ ], FAX: [ ], Re: [99165r7P802-15_HRSG-PAR.doc, 00110r9P802-15_TG3-Criteria-Definitions.doc, 00127r0P802-15_HR_TG3_Project Plan.doc, 00165R1P802-15_TG3-High-Rate-Agenda-July00.xls] Abstract:[TG3 Presentation to Bluetooth Program Management] Purpose:[The following presentation will provide the BSIG PM perspective on IEEE Task Group 3 relationship to future BSIG radio implementations.] Notice:This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 3 IEEE Working Group for Wireless Personal Area Networks: High Rate WPAN Task Group Bluetooth™ SIG Program Management Report Bluetooth™ Congress 2000 June 16, 2000 Monte Carlo, Monaco
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 4 Agenda Introduction IEEE PAR Status and plans for TG3 Bluetooth - IEEE Evolution Collaboration Discussion Q&A
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 5 Introduction John Barr –Director, Systems Architecture & Technology, Personal Area Networks, Personal Networking Group, Motorola –IEEE Roles & Responsibilities Chairperson, IEEE Task Group
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 6 IEEE PAR Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for High Rate Wireless Personal Area Networks (WPAN) –… wireless connectivity with fixed, portable and moving devices within or entering a Personal Operating Space (POS) (up to 10 meters in all directions enveloping a person) –… interoperability or coexistence with other TG –… coexistence with other wireless devices in conjucntions with Coexistence Task Groups such as –… low complexity, low cost, low power –… >20Mbps to satisfy a set of consumer multi-media industry needs for WPAN communications.
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 7 Status and Plans for TG3 Construction of Initial Draft Goal: everything you need to know to construct the lower layers of high rate WPAN (future Bluetooth?) Schedule Goal: Produce a Standard by the end of 2001 or early 2002 Next Steps Goal: Review of proposals, July, Selection of candidate MAC/PHY, September, Working Group draft, May, Sponsor ballot, November, 2001.
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 8 Companies Proposing MAC/PHY –Intermec –Kodak –Motorola –Radiata –LinCom –Broadcom –Intersil –TI –Time Domain –Mobilian –Wi-LAN –Alantro –Supergold
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 9 How IEEE Structure Fosters Evolution MLME Radio
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 10 Bluetooth Assumptions 1.0 Foundation 2.0 Specification –2.4 GHz –100% Backward Compatible to Foundation –Higher rate ~2-10Mbit/s 3.0 Specification? –2.4 or 5 GHz? –100% Backward Compatible to Foundation & 2.0 Specification –Higher rate ~??Mbps >=?? Mbit/s >2 <=10 Mbit/s <=1 Mbit/s ? Physical LMP WAE vCard/vCal AT Commands TCS BINSDP Audio WAP IP UDPTCP OBEX RFCOMM Host Controller Interface PPP L2CAP Baseband
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 11 IEEE Current –Draft passes WG & Sponsor –Draft is sent to RevCom 9Feb01 –Draft approved 21Mar01 – Published Apr –Goal of backward compatibility path to Five Criteria States: The goal of this standard is to have a backward compatibility path to the P Task Group to increase market penetration for both WPAN standards.” MAC PHY MAC PHY Bridging LLC =/>20 Mbit/s =/<1 Mbit/s
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 12 BT-2 Market Segmentation BT (BT-3?) Cost Performance (Mbps) >20 Broadband Multi-media Multi-media Audio
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 13 Collaboration Proposal tracks BT-1 (1.1) as baseline standard Multi-media study group to determine how to track BT-2 BSIG PM and IEEE determine how to establish guidelines for adoption of externally defined radio standards by BSIG PM BSIG PM and IEEE establish common marketing message
doc.: IEEE /191r0 Submission June 2000 John Barr, MotorolaSlide 14 Q&A