Doc.: IEEE 802.19-05/0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Questions to the Contention-based Protocol (CBP) Study Group Notice:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1116r0 Submission July 2006 Harry Worstell, AT&T.Slide 1 TGp Closing Report Notice: This document has been prepared to assist IEEE.
Advertisements

Doc.: IEEE /2163r0 Submission July 2007 Cam-Winget, Smith, WalkerSlide 1 A-MPDU Security Issues Notice: This document has been prepared to assist.
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE /0018r0 Submission June 2005 Tom Siep, Cambridge Silicon Radio PlcSlide a Coexistence Characteristics Notice: This document.
Doc.: IEEE /0028r0 Submission July 2006 Steve Shellhammer, QualcommSlide 1 Coexistence Scenario – A Pair of Unlicensed Wireless Networks Notice:
Doc.: IEEE /0029r0 Submission July 2006 Steve Shellhammer, QualcommSlide 1 Coexistence Scenario – A Pair of Unlicensed Wireless Networks, one.
Doc.: IEEE /xxxxr0 Submission July 2006 Tom Siep, Cambridge Silicon Radio PlcSlide 1 Discussion of Definitions in 0023r2 Notice: This document.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /0077r0 Submission September 2007 Rich Kennedy, OakTree WirelessSlide 1 5GHz RLANs and the Spectrum Challenges from the Weather Radar.
Doc.: IEEE /0008r0 & /0199r0 Submission January 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Jan07 IEEE
Doc.: IEEE /1465r0 Submission September 2006 K. Kim et al.Slide 1 RA-OLSR Text Updates Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1007r0 Submission September 2005 Fred Haisch, Proxim WirelessSlide 1 Alternative Lock-up Solution Notice: This document has been prepared.
Doc.: IEEE /2209r0 Submission July 2007 Qi Wang, Broadcom CorporationSlide 1 PICS table entry on co-located interference reporting Date:
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
Doc.: IEEE /0756r0 Submission May 2006 Todor CooklevSlide 1 HD video and multimedia over : an update Notice: This document has been prepared.
Doc.: IEEE Submission July 2008 Alvarion Some simulation results for h CX-CBP in 3.65GHz Notice: This document has been prepared.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0024r0 Submission May 2006 Steve Shellhammer, QualcommSlide 1 Discussion of Coexistence Scenarios Notice: This document has been prepared.
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
November 2013 Opening Report
March Opening Report Date: Authors: March 2010
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
Contribution on Location Privacy
Decision on SG Formation
November Opening Report
TVWS Coexistence Study Group Extension Request
July Opening Report Date: Authors: July 2009
Reflector Tutorial Date: Authors: July 2006 Month Year
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
Decision on SG Formation
September Opening Report
LB73 Noise and Location Categories
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
Addressing White Spaces Across all of IEEE 802
TGy draft 2.0 with changebars from draft 1.0
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
Beamforming and Link Adaptation Motions
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
September 2012 Opening Report
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
Discussion of Coexistence Scenarios
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November 2014 Opening Report
July 2013 Opening Report Date: Authors: July 2013
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

doc.: IEEE /0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Questions to the Contention-based Protocol (CBP) Study Group Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE TAG. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 2 Questions to the CBP SG The TAG is interesting in understanding the scope of the CBP Project The TAG has several questions to the study group to help us understand the scope of the project These questions only related to how the FCC rules are written today.

doc.: IEEE /0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 3 Questions to CBP SG What 802 wireless working groups have interest in operating in the 3650 – 3700 MHz band? – (serious about amending to meet the FCC rules) – (have activities underway for techniques that would may meet the FCC rules e.g. 16h) –The FCC will expect whatever is approved will be able to share with current and future primary government and non-government users in the band –The FCC will expect whatever is approved needs to be able to share with previously approved secondary systems

doc.: IEEE /0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 4 Questions to CBP SG Does the CBP group plan to develop a spectrum sharing technique to enable sharing between multiple 802 wireless systems? –The current plan is not to develop such a technique –Such a technique may add significant cost –Is developing such a system worth the effort? –There may or may not be a broad market appeal for a broader project, for a 50 MHz band.

doc.: IEEE /0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 5 Questions to CBP SG Does the CBP SG see multiple working groups developing their own contention based protocols for operating in this band? –The CBP PAR would enable an extension of 11a or possibly 11n, other. –16h could (be made to) use this band

doc.: IEEE /0023r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 6 Possible Views on the Scope of the Project Option 1 – Amend to enable it to operate in the band and meet the FCC rules Option 2 – Develop a spectrum sharing technique (i.e. CBP) that enables multiple 802 wireless standards to share the band Option 3 – Does the group plan to develop an out-of- band link to resolve a conflict? Which approach is the CBP group planning to take? –Option 1 Is there value in pursing Option 2? –Maybe not for this band since it is only 50 MHz –However, since it is only 50 MHz, there is a need for a spectrum sharing technique