doc.: IEEE /1447r3 Submission November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors: P802.11ad Report to EC on Conditional Approval to go to Sponsor Ballot
doc.: IEEE /1447r3 Submission Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11ad Draft 5.0 to Sponsor Ballot. This document was approved during the plenary session of the working group on 9 November –Passed in the Working Group 73 yes, 0 no, 11 abstain November 2011 Eldad Perahia, Intel CorporationSlide 2
doc.: IEEE /1447r3 Submission P802.11ad Draft Stability November 2011 Eldad Perahia, Intel CorporationSlide 3 DraftDateNumber of Pages 1.0Sept March May July Sept
doc.: IEEE /1447r3 Submission WG Letter Ballot Results – P802.11ad November 2011 Eldad Perahia, Intel CorporationSlide 4 Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Oct 2010 Technical Letter Ballot for TGad draft 1.0 Technical April 2011 First Recirculation Ballot for TGad draft 2.0 Recirculation June 2011 Second Recirculation Ballot for TGad draft 3.0 Recirculation Aug 2011 Third Recirculation Ballot for TGad draft 4.0 Recirculation Oct 2011 Fourth Recirculation Ballot for TGad draft 5.0 Recirculation Post Ballot 185 vote changes
doc.: IEEE /1447r3 Submission WG Letter Ballot Comments – P802.11ad November 2011 Eldad Perahia, Intel CorporationSlide 5 Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No votes) Oct 2010Technical Letter Ballot for TGad draft (670 T, 559 E) 1745 April 2011First Recirculation Ballot for TGad draft (198 T, 132 E) 1771 June 2011Second Recirculation Ballot for TGad draft (133 T, 81 E) 1839 Aug 2011Third Recirculation Ballot for TGad draft (95 T, 70 E) 1856 Oct 2011Fourth Recirculation Ballot for TGad draft (27 T, 14 E)
doc.: IEEE /1447r3 Submission Unsatisfied Technical comments by commenter November 2011 Eldad Perahia, Intel CorporationSlide 6 VoterLB168LB174LB177LB183LB185Total Ashley, Alex (NDS Limited) Bahr, Michael (Siemens AG) 66 Chaplin, Clint F (SAMSUNG) Hamilton, Mark (Polycom, Inc.) Hiertz, Guido R. (Philips) 33 Hunter, David (TimeFactor) Ji, Lusheng (AT&T) 11 Marshall, Bill (AT&T Labs Research) 37 Mccann, Stephen (Research In Motion Limited) 33 Miller, Robert R (AT&T) 44 Rosdahl, Jon W (CSR) Vlantis, George A (STMicroelectronics) 11 Total 283
doc.: IEEE /1447r3 Submission Unsatisfied Technical Comments – Topics November 2011 Eldad Perahia, Intel CorporationSlide 7 TopicBeamformingPHYMAC (frame formats) MAC (MLME) MAC (Others) GeneralTotal Ashley, Alex (NDS Limited) Bahr, Michael (Siemens AG) 6 6 Chaplin, Clint F (SAMSUNG) Hamilton, Mark (Polycom, Inc.) Hiertz, Guido R. (Philips) Hunter, David (TimeFactor) Ji, Lusheng (AT&T) 1 1 Marshall, Bill (AT&T Labs Research) Mccann, Stephen (Research In Motion Limited) 123 Miller, Robert R (AT&T) Rosdahl, Jon W (CSR) Vlantis, George A (STMicroelectronics ) 11 Total
doc.: IEEE /1447r3 Submission Unsatisfied Editorial comments by commenter November 2011 Eldad Perahia, Intel CorporationSlide 8 VoterLB168LB174LB177LB183LB185Total Ashley, Alex (NDS Limited) 347 Bahr, Michael (Siemens AG) 0 Chaplin, Clint F (SAMSUNG) Hamilton, Mark (Polycom, Inc.) 0 Hiertz, Guido R. (Philips) 2 Hunter, David (TimeFactor) Ji, Lusheng (AT&T) 22 Marshall, Bill (AT&T Labs Research) 19 Mccann, Stephen (Research In Motion Limited) 0 Miller, Robert R (AT&T) 0 Rosdahl, Jon W (CSR) Vlantis, George A (STMicroelectronics) 0 Total 117
doc.: IEEE /1447r3 Submission Unsatisfied Editorial Comments – Topics November 2011 Eldad Perahia, Intel CorporationSlide 9 TopicBeamformingPHYMAC (frame formats) MAC (MLME) MAC (Others) GeneralTotal Ashley, Alex (NDS Limited) Chaplin, Clint F (SAMSUNG) Hiertz, Guido R. (Philips) 2 2 Hunter, David (TimeFactor) Ji, Lusheng (AT&T) Marshall, Bill (AT&T Labs Research) Rosdahl, Jon W (CSR) Total
doc.: IEEE /1447r3 Submission Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. November 2011 Eldad Perahia, Intel CorporationSlide 10
doc.: IEEE /1447r3 Submission TGad Timeline November 2011 Eldad Perahia, Intel CorporationSlide 11 OpenClose Fifth recirculation (TGad D5.0)9-Nov-1124-Nov-11 First sponsor ballot19-Dec-1118-Jan-12 Second sponsor ballot13-Mar-1227-Mar-12 Third sponsor ballot16-Apr-1230-Apr-12 Fourth sponsor ballot17-May-1231-May-12 Fifth sponsor ballot16-Jun-1230-Jun-12 EC to RevCom July-12 RevCom to SB Dec-12