Doc.: IEEE 802.11-09/0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Advertisements

Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
Doc.: IEEE /0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGn Editor Report May 2009 Date: Authors:
Doc.: IEEE /0715r0 Submission July 2009 Stephen McCann (RIM) Slide 1 P802.11u Report to EC on Approval to go to Sponsor Ballot Date: Authors:
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE 11-12/0179r3 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC in support of approval to proceed to RevCom Date:
Doc.: IEEE 11-12/0179r1 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC on in support of approval to proceed to RevCom Date:
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Jan 2009 Date: Authors:
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 November 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
Presentation transcript:

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for approval to proceed to RevCom Date: Authors:

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 2 Introduction Revision 0 of this document is preliminary, reflecting the status as of after the fourth recirculation ballot. Any greyed-out sections will be filled in the final version of this document. This document contains the report to the IEEE 802 Executive Committee in support of a request for approval to send IEEE P802.11n to RevCom. Document (11-09/0674r ) was approved during the closing plenary session of the working group on. –Passed in the Task Group –Passed in the Working Group

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 3 IEEE 802 Sponsor Ballot Results – P802.11n Key: “with” = “with comments” “w/o” = “without comments” QTY % % % %

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 4 Updated resolution of the 20/40 MHz in 2.4 GHz comments Prior to completion of comment resolutions in the May session (Montreal, Canada), many of the comments relating to the 20/40MHz in 2.4 GHz topic were rejected by the comment resolution committee. During the May session, a compromise was worked out, including active participation from the comment resolution committee and those voting “no” on this topic. Significant changes were incorporated into D10.0 As a result, resolutions of 81 comments from the initial ballot and 16 comments from the first recirculation ballot were re-written (replacing a “disagree” with an “accept in principle”). The updated resolutions form the basis of the analysis in the rest of this document.

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 5 Comments by Ballot Key: SB0 = Initial sponsor ballot. SB1 = 1 st recirculation ballot, etc. Coordination: comment supplied by a Mandatory coordination entity Not Required: comment indicated as not required to satisfy voter Satisfied: comment required to satisfy voter that is indicated as satisfied either by the voter indicating satisfaction with the specific comment, or by voting yes in a subsequent ballot Known Unsatisfied: a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has indicated they are unsatisfied with the comment resolution. Assumed Unsatisfied: comment not meeting any of the above criteria – i.e., a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has not responded when asked about their satisfaction with the comment resolution.

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 6 Mandatory coordination Coordination EntityDraftDateStatus IEEE-SA Editorial (MEC) D9.0 D10.0 D11.0 March 09 May 09 June 09 “Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) D8.0February 09“OK” Terms and Definitions (SCC10) No response Registration Authority Committee (RAC) Not required

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 7 Note In subsequent slides, “Unsatisfied comments” includes both “Known Unsatisfied” and “Assumed Unsatisfied” comments.

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 8 Unsatisfied Comments The table shows the count of unsatisfied editorial comments and technical comments separately. The comments are then classified into: A – Accepted. The comment was accepted and the change indicated by the commenter was approved. P – Accepted in Principle. The comment was accepted in principle, but a different change to the one indicated by the commenter was approved. D – Disagree. The comment was declined and no change to address the comment was approved. U – Unresolvable. S – Out of Scope.

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 9 Unsatisfied comments by commenter

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 10 Unsatisfied Comments by Topic

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 11 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during P802.11n sponsor ballot is attached. –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the embedded.pdf to the right to open this.

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 12 Note Having filled in the blanks, the following slide will be brought to motion in the July EC meeting.

doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide EC Motion – Approval to send P802.11n to RevCom Grant approval, to forward P802.11n Draft 11.0 to RevCom. P802.11n had a 90% approval on the last Recirculation Sponsor Ballot. There are 22 disapprove voters representing 98 unsatisfied comments. –Working Group vote on the Motion Passed: y, n, a Moved: Bruce Kraemer 2 nd : –Yes No Abstain